Page 825 of 4500

7.TRANSMISSION
a. Install the overflow plug.
b. Stop the engine.
c. Remove the refill plug.
d. Add 0.4 liters (0.42 US qts, 0.35 Imp. qts) of fluid.
e. Allow the engine to idle and wait for 10 seconds.
f. Proceed to next step.
8.COMPLETE
a. Install the overflow plug with a new gasket.
b. Stop the engine.
c. Install the refill plug with a new gasket.
d. Install the transmission case cover with the two bolts.
Torque:
20 N.m (204 kgf.cm, 15 ft.lbf) for overflow plug
39 N.m (400 kgf.cm, 53 ft.lbf) for refill plug
REPLACEMENT
1.DISCONNECT BATTERY NEGATIVE TERMINAL
2.REMOVE INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.2 (SEE REPLACEMENT
)
3.REMOVE INSTRUMENT PANEL GARNISH SUB-ASSY LH (SEE REPLACEMENT
)
4.REMOVE INSTRUMENT PANEL FINISH PANEL (SEE REPLACEMENT
)
5.REMOVE INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.1 (SEE REPLACEMENT
)
6.REMOVE SWITCH BRACE HOLE COVER (SEE REPLACEMENT
)
7.REMOVE INSTRUMENT PANEL SAFETY PAD SUB-ASSY NO.1 (SEE REPLACEMENT
)
8.REMOVE INSTRUMENT PANEL CUP HOLDER ASSY (SEE REPLACEMENT
)
9.REMOVE CONSOLE UPPER REAR PANEL SUB-ASSY (SEE REPLACEMENT
)
10.REMOVE CONSOLE BOX CARPET (SEE REPLACEMENT
)
11.REMOVE REAR CONSOLE ARMREST ASSY (SEE REPLACEMENT
)
12.REMOVE INSTRUMENT PANEL FINISH PANEL LOWER CENTER (SEE REPLACEMENT
)
13.REMOVE INSTRUMENT CLUSTER FINISH PANEL SUB-ASSY CENTER (SEE
REPLACEMENT
)
14.REMOVE CONSOLE PANEL SUB-ASSY UPPER (SEE REPLACEMENT
)
15.REMOVE CONSOLE BOX (SEE REPLACEMENT
)
16.SEPARATE OXYGEN SENSOR (SEE REPLACEMENT
)
Page 826 of 4500
17.REMOVE FRONT FLOOR BRACE CENTER (SEE REPLACEMENT )
18.REMOVE EXHAUST PIPE ASSY (SEE REPLACEMENT
)
19.REMOVE FRONT FLOOR HEAT INSULATOR NO.1 (SEE REPLACEMENT
)
20.REMOVE PROPELLER W/CENTER BEARING SHAFT ASSY (SEE OVERHAUL
)
SST 09922-10010
21.SEPARATE FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSY
a. Remove the nut and separate the floor shift gear shifting rod.
Fig. 7: Removing Nut And Separating Floor Shift Gear Shifting Rod
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
22.SUPPORT AUTOMATIC TRANSMISSION ASSY
a. Support the automatic transmission assy with a transmission jack.
23.SEPARATE ENGINE REAR MOUNTING MEMBER
a. Remove the 4 bolts and separate the engine rear mounting member.
Page 827 of 4500
Fig. 8: Removing 4 Bolts And Separating Engine Rear Mounting Member
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
24.REMOVE TRANSMISSION CONTROL SHAFT LEVER RH
a. Remove the nut and transmission control shaft lever RH.
Page 828 of 4500
Fig. 9: Removing Nut And Transmission Control Shaft Lever RH
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
25.REMOVE PARK/NEUTRAL POSITION SWITCH ASSY
a. Disconnect the park/neutral position switch connector.
b. Using a screwdriver, pry out the lock washer.
c. Remove the lock nut and lock washer.
Page 829 of 4500
Fig. 10: Removing Lock Nut And Lock Washer
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
d. Remove the bolt and park/neutral position switch.
Page 830 of 4500
Fig. 11: Removing Bolt And Park/Neutral Position Switch
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
26.INSTALL PARK/NEUTRAL POSITION SWITCH ASSY
a. Install the park/neutral position switch to the manual valve shaft.
b. Temporarily install the bolt.
Page 831 of 4500
Fig. 12: Installing Bolt
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c. Install a new lock plate and the nut.
Torque: 6.9 N.m (70 kgf.cm, 61 in..lbf)
d. Temporaril
y install the control shaft lever.
Page 832 of 4500
Fig. 13: Installing Control Shaft Lever
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
e. Turn the control shaft lever counterclockwise until it stops, and turn it clockwise 2 notches to set it
to the N position.
f. Remove the transmission control shaft lever.