2006 DODGE RAM SRT-10 Service Repair Manual

Page 321 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 6.(K19) COIL CONTROL NO.1 CIRCUIT OPEN
Turn the ignition off.
Disconnect the C2 PCM harness connector.
CAUTION: Do not probe the PCM harness connectors. Probing the
PCM harness connectors will damage

Page 322 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual P2305-IGNITION COIL 2 SECONDARY CIRCUIT- INSUFFICIENT IONIZATION
For a complete wiring diagramRefer to Section 8W.

Page 323 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual When Monitored:
Engine running and battery voltage greater than 10 volts.
Set Condition:
If PCM detects that the secondary ignition burn time is incorrect, too short, or not present, an error is detec

Page 324 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 3.COIL ON PLUG RESISTANCE
Turn the ignition off.
NOTE: The following resistance measurement should be taken between 70° and80°F.
Measure the resistance of the Coil on Plug.
4.7L and 3.7L Primary Ign

Page 325 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 6.(K17) COIL CONTROL NO.2 CIRCUIT OPEN
Turn the ignition off.
Disconnect the C2 PCM harness connector.
CAUTION: Do not probe the PCM harness connectors. Probing the
PCM harness connectors will damage

Page 326 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual P2308-IGNITION COIL 3 SECONDARY CIRCUIT- INSUFFICIENT IONIZATION
For a complete wiring diagramRefer to Section 8W.

Page 327 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual When Monitored:
Engine running and battery voltage greater than 10 volts.
Set Condition:
If PCM detects that the secondary ignition burn time is incorrect, too short, or not present, an error is detec

Page 328 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 3.COIL ON PLUG RESISTANCE
Turn the ignition off.
NOTE: The following resistance measurement should be taken between 70° and80°F.
Measure the resistance of the Coil on Plug.
4.7L and 3.7L Primary Ign