Page 369 of 4801

CHG-24
< DTC/CIRCUIT DIAGNOSIS >
POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPERATION
INSPECTION
POWER GENERATION VOLTAGE VA RIABLE CONTROL SYSTEM OPER-
ATION INSPECTION
Diagnosis ProcedureINFOID:0000000009460660
Regarding Wiring Diagram information. Refer to CHG-12, "Wiring Diagram".
CAUTION:
When performing this in spection, always use a charged battery that has completed the battery inspec-
tion. (When the charging rate of the battery is lo w, the response speed of the voltage change will
become slow. This can cause an incorrect inspection.)
1.CHECK ECM (CONSULT)
Perform ECM self-diagnosis with CONSULT. Refer to EC-77, "CONSULT Function"
(QR25DE) or EC-601,
"CONSULT Function" (VQ35DE).
Self
-diagnostic results content
No malfunction detected>> GO TO 2.
Malfunction detected>> Check applicable parts, and repair or replace corresponding parts.
2.CHECK OPERATION OF POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM
1. Connect CONSULT and start the engine.
2. The selector lever is in “P” or “N” position and al l of the electric loads and A/C, etc. are turned OFF.
3. Select “ALTERNATOR DUTY” in “Active Test” of “ENGINE”, and then check the value of “BATTERY
VOLT” monitor when DUTY value of “DUTY” is set to 40.0 %.
4. Check the value of “BATTERY VOLT” monitor when DUTY value of “DUTY” is set to 80.0%.
Is the inspection result normal?
YES >> Inspection End.
NO >> GO TO 3.
3.CHECK IPDM E/R (CONSULT)
Perform IPDM E/R self-diagnosis with CONSULT. Refer to PCS-9, "CONSULT Function (IPDM E/R)"
.
Is the inspection result normal?
No malfunction detected>> GO TO 4.
Malfunction detected>> Check applicable parts, and repair or replace corresponding parts.
4.CHECK HARNESS BETWEEN GE NERATOR AND IPDM E/R
1. Turn ignition switch OFF.
2. Disconnect generator connector and IPDM E/R connector.
3. Check continuity between generator harnes s connector and IPDM E/R harness connector.
“BATTERY VOLT”
2 seconds after setting the
DUTY value of “ALTERNA-
TOR DUTY” to 40.0 % : 12 - 13.6 V
“BATTERY VOLT”
20 seconds after setting
the DUTY value of “ALTER-
NATOR DUTY” to 80.0 % : +0.5 V or more against
the value of “BATTERY
VOLT” monitor when
DUTY value is 40.0 %
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 370 of 4801
CHG
POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPERATION
INSPECTION
CHG-25
< DTC/CIRCUIT DIAGNOSIS >
C
D E
F
G H
I
J
K L
B
A
O P
N
4. Check continuity between generator harness connector and ground.
Is the inspection result normal?
YES >> Replace IPDM E/R. Refer to PCS-32, "Removal and Installation".
NO >> Repair harness or connectors between IPDM E/R and generator.
Generator IPDM E/R Continuity
Connector Terminal Connector Terminal
F7 4 F84 71 Yes
Generator — Continuity
Connector Terminal
F7 4 Ground No
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 371 of 4801

CHG-26
< DTC/CIRCUIT DIAGNOSIS >
B TERMINAL CIRCUIT
B TERMINAL CIRCUIT
DescriptionINFOID:0000000009460661
“B” terminal circuit supplies power to charge the battery and to operate the vehicles electrical system.
Diagnosis ProcedureINFOID:0000000009460662
Regarding Wiring Diagram information. Refer to CHG-12, "Wiring Diagram".
1.CHECK “B” TERMINAL CONNECTION
1. Turn ignition switch OFF.
2. Check if “B” terminal is clean and tight.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair terminal “B” connection. Confirm repa ir by performing complete Charging system test
using the EXP-800 NI or GR8-1200 NI (if availabl e). Refer to applicable Instruction Manual for
proper testing procedures.
2.CHECK “B” TERMINAL CIRCUIT
Check voltage between generator “B” terminal and ground.
Is the inspection result normal?
YES >> GO TO 3.
NO >> Check harness for open between generator and fusible link.
3.CHECK “B” TERMINAL CONNECT ION (VOLTAGE DROP TEST)
1. Start engine, then engine running at idle and warm.
2. Check voltage between battery positive te rminal and generator connector “B” terminal.
Is the inspection result normal?
YES >> “B” terminal circuit is normal. Refer to CHG-17, "Work Flow (With EXP-800 NI or GR8-1200 NI)"
or CHG-20, "Work Flow (Without EXP-800 NI or GR8-1200 NI)".
NO >> Check harness between battery and generator for continuity.
(+)
(-)Voltage
(Approx.)
Generator
Connector Terminal F6 1 Ground Battery voltage
(+) (-)Voltage
(Approx.)
Generator
Connector Terminal F6 1 Battery positive terminal Less than 0.2V
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 372 of 4801

CHG
L TERMINAL CIRCUIT (OPEN)CHG-27
< DTC/CIRCUIT DIAGNOSIS >
C
D E
F
G H
I
J
K L
B
A
O P
N
L TERMINAL CIRCUIT (OPEN)
DescriptionINFOID:0000000009460663
The “L” terminal circuit controls the charge warning
lamp. The charge warning lamp turns ON when the igni-
tion switch is set to ON or START. When the generator is providing sufficient voltage with the engine running,
the charge warning lamp turns OFF. If the charge warn ing lamp illuminates with the engine running, a malfunc-
tion is indicated.
Diagnosis ProcedureINFOID:0000000009460664
Regarding Wiring Diagram information. Refer to CHG-12, "Wiring Diagram".
1.CHECK “L” TERMINAL CONNECTION
1. Turn ignition switch OFF.
2. Check if “L” terminal is clean and tight.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair “L” terminal connection. Confirm repair by performing complete Charging system test
using EXP-800 NI or GR8-1200 NI (if available). Refer to applicable Instruction Manual for proper
testing procedures.
2.CHECK “L” TERMINAL CIRCUIT (OPEN)
1. Disconnect the generator connector.
2. Apply ground to generator harness connector terminal.
3. Check condition of the charge warning lamp with the ignition switch in the ON position.
Does it illuminate?
YES >> “L” terminal circuit is normal. Refer to CHG-17, "Work Flow (With EXP-800 NI or GR8-1200 NI)" or
CHG-20, "Work Flow (Without EXP-800 NI or GR8-1200 NI)"
.
NO >> GO TO 3.
3.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
1. Disconnect the battery cabl e from the negative terminal.
2. Disconnect the combination meter connector.
3. Check continuity between generator harness connector and combination meter harness connector.
is the inspection result normal?
YES >> GO TO 4.
NO >> Repair or replace the harness or connectors.
4.CHECK HARNESS CONTI NUITY (OPEN CIRCUIT)
Check continuity between combination me ter harness connector and fuse block (J/B).
Generator
GroundCondition
Connector Terminal Ignition switch position Charge warning lamp F7 2 ON Illuminate
Generator Combination meter Continuity
Connector Terminal Connector Terminal
F7 2 M24 11 Yes
Combination meter Fuse box (J/B) Continuity
Connector Terminal Connector Terminal
M24 21 M5 8P Yes
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 373 of 4801
CHG-28
< DTC/CIRCUIT DIAGNOSIS >
L TERMINAL CIRCUIT (OPEN)
Is the inspection result normal?
YES >> GO TO 5.
NO >> Repair or replace the harness or connectors.
5.CHECK POWER SUPPLY CIRCUIT
1. Connect the battery cable to the negative terminal.
2. Check voltage between combination meter harness connector and ground.
Is the inspection result normal?
YES >> Replace the combination meter. Refer to MWI-82, "Removal and Installation".
NO >> Repair or replace the harness or connectors.
(+)
(-) Condition Voltage
(Approx.)
Combination meter
Connector Terminal
M24 21 Ground When the ignition
switch is in ON position Battery voltage
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 374 of 4801

CHG
L TERMINAL CIRCUIT (SHORT)CHG-29
< DTC/CIRCUIT DIAGNOSIS >
C
D E
F
G H
I
J
K L
B
A
O P
N
L TERMINAL CIRCUIT (SHORT)
DescriptionINFOID:0000000009460665
The terminal “L” circuit controls the charge warning
lamp. The charge warning lamp turns ON when the igni-
tion switch is set to ON or START. When the generator is providing sufficient voltage with the engine running,
the charge warning lamp turns off. If the charge warn ing lamp illuminates with the engine running, a malfunc-
tion is indicated.
Diagnosis ProcedureINFOID:0000000009460666
Regarding Wiring Diagram information, refer to CHG-12, "Wiring Diagram".
1.CHECK “L” TERMINAL CIRCUIT (SHORT)
1. Turn ignition switch OFF.
2. Disconnect generator connector.
3. Turn ignition switch ON.
Does charge warning lamp illuminate?
YES >> GO TO 2.
NO >> Refer to CHG-17, "Work Flow (With EXP-800 NI or GR8-1200 NI)"
or CHG-20, "Work Flow (With-
out EXP-800 NI or GR8-1200 NI)".
2.CHECK HARNESS CONTINUI TY (SHORT CIRCUIT)
1. Turn ignition switch OFF.
2. Disconnect the battery cabl e from the negative terminal.
3. Disconnect combination meter connector.
4. Check continuity between the comb ination meter harness connector and ground.
Is the inspection result normal?
YES >> Replace the combination meter. Refer to MWI-82, "Removal and Installation".
NO >> Repair or replace the harness or connectors.
Combination meter
GroundContinuity
Connector Terminal
F7 2 No
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 375 of 4801

CHG-30
< DTC/CIRCUIT DIAGNOSIS >
S TERMINAL CIRCUIT
S TERMINAL CIRCUIT
DescriptionINFOID:0000000009460667
The output voltage of the generator is controlled by the IC regulator at terminal “S” detecting the input voltage
from battery.
The “S” terminal circuit detects the battery voltage to adjust the generator output voltage with the IC voltage
regulator.
Diagnosis ProcedureINFOID:0000000009460668
Regarding Wiring Diagram information. Refer to CHG-12, "Wiring Diagram".
1.CHECK “S” TERMINAL CONNECTION
1. Turn ignition switch OFF.
2. Check if “S” terminal is clean and tight.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair “S” terminal connection. Confirm repa ir by performing complete Charging system test
using EXP-800 NI or GR8-1200 NI (if available). Refer to the applicable Instruction Manual for
proper testing procedures.
2.CHECK “S” TERMINAL CIRCUIT
Check voltage between generator harness connector and ground.
Is the inspection result normal?
YES >> Refer to CHG-17, "Work Flow (With EXP-800 NI or GR8-1200 NI)" or CHG-20, "Work Flow (With-
out EXP-800 NI or GR8-1200 NI)".
NO >> Check harness for open between generator and fuse.
(+)
(-)Voltage
(Approx.)
Generator
Connector Terminal F7 3 Ground Battery voltage
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM
Page 376 of 4801
CHG
CHARGING SYSTEMCHG-31
< SYMPTOM DIAGNOSIS >
C
D E
F
G H
I
J
K L
B
A
O P
N
SYMPTOM DIAGNOSIS
CHARGING SYSTEM
Symptom TableINFOID:0000000009460669
Symptom Reference
Battery discharged
Refer to CHG-17, "Work Flow (With EXP-800 NI or GR8-1200 NI)"
or CHG-20, "Work Flow (Without EXP-800 NI or GR8-1200 NI)"
.
The charge warning lamp does not illuminate when the ignition
switch is set to ON.
The charge warning lamp does not turn OFF after the engine
starts.
The charging warning lamp turns ON when increasing the engine
speed.
Revision: November 20132014 Altima NAMRevision: November 20132014 Altima NAM