Page 185 of 1954

Emission Contro l Syste m
Evaporativ e Emissio n (EVAP ) Control s (cont'd )
EVAP bypas s solenoi d valv e test .
Chec k th e EVA P bypas s solenoi d
valve :
1 . Disconnec t th e vacuu m hos e
fro m th e EVA P tw o wa y valve ,
and connec t a vacuu m pum pto th e hose .2. Tur n th e ignitio n switc h O N (II) .3. Appl y vacuu m to th e hose .
Dose th e valv e hol d vacuum ?
NO
Chec k th e EVA P bypas s solenoi d
valve :
1. Tur n th e ignitio n switc h OFF .2. Disconnec t th e EVA P bypas ssolenoid valv e 2 P connector .3. Chec k fo r continuit y betwee n
th e EVA P bypas s solenoi d
valve 2 P connecto r termina lNo. 2 an d bod y ground .
Is ther e continuity ?
YES
Chec k fo r a shor t i n th e wir e(2WB S line) :
1 . Disconnec t th e PC M connec -
tor F (8P) .2. Chec k fo r continuit y betwee n
th e EVA P bypas s solenoi d
valve 2 P connecto r termina lNo. 2 an d bod y ground .
Is ther e continuity ?
NO
Substitut e a known-goo d PC Mand recheck . I f symptom/indica -
tio n goe s away , replac e th e origi -
nal PCM .
EVAP TWO-WA YVALVE
VACUU MPUMP/GAUGE ,
0 - 3 0 in.H g
A973 X -
04 1 -XXXX X
EVA P bypas s solenoi d valve/EVA P
two-wa y valv e is OK . D o th e EVA P
caniste r ven t shu t valv e tes t (se e
pag e 11-99 ).EVA PBYPAS SSOLENOI DVALVE
Replac e th e EVA P bypas s solenoi d
valv e an d O-rings .
Repai r shor t i n th e wir e betwee n
PC M (F1 ) an d EVA P bypas s
solenoi d valve .
ProCarManuals.com
Page 186 of 1954

Does th e valv e hol d vacuum ?
I s ther e batter y voltage ?
NO
Repai r ope n i n th e wir e betwee n
th e EVA P caniste r ven t shu t
valve an d No . 2 0 EC U (PCM ) (2 0A)fuse .
VACUUM
PUMP/GAUGE , 0-3 0 in.H g
A973 X - 04 1 - XXXX X
EVA P caniste r ven t shu t valv e is
OK . D o th e caniste r syste m lea k
tes t (se e pag e 11-100 ).
N ORepai r ope n i n th e wir e betwee n
th e EVA P caniste r ven t shu t
valve an d PC M (F5) .
Replac e th e EVA P caniste r ven t
shu t valv e an d O-ring .
EVA
P caniste r ven t shu t valv e
test .
Chec k th e EVA P caniste r ven t
shu t valve :
1 . Disconnec t th e vacuu m hos e
an d connec t a vacuu m pum p
t o th e hose .
2 . Connec t th e PC M connecto r
termina l F 5 t o th e bod y groun d
with a jumpe r wire .3. Tur n th e ignitio n switc h O N (II) .4. Appl y vacuu m to th e hose .
I s ther e continuity ?
Chec k fo r a n ope n i n th e wir e
(IG 1 line) :
1 . Tur n th e ignitio n switc h O N (II) .
2 . Measur e voltag e betwee n th e
EVA P caniste r ven t shu t valv e
2 P connecto r termina l No . 1
an d bod y ground .
Chec
k fo r a n ope n i n th e wir e
(VS V line) :
1. Tur n th e ignitio n switc h OFF .2. Disconnec t th e EVA P caniste r
ven t shu t valv e 2 P connector .
3 . Chec k fo r continuit y betwee n
th e EVA P caniste r ven t shu t
valv e 2 P connecto r termina l
No . 2 an d bod y ground .
ProCarManuals.com
Page 187 of 1954

Emission Contro l Syste m
Evaporativ e Emissio n (EVAP ) Control s (cont'd )
Canister syste m lea k test .
Chec k th e EVA P caniste r ven t
shu t valv e lin e an d connections :
1 . Tur n th e ignitio n switc h OFF .
2 . Connec t t o three-wa y te e fit -
ting s int o th e hos e fro m th e
EVA P caniste r t o th e EVA P tw oway valve . Connec t th e fue l
tan k pressur e senso r t o on e o f
th e te e fitting s an d th e vacuu m
pum p to th e other .
3 . Remov e th e ven t hos e fro m
th e EVA P caniste r ven t shu t
valv e an d ca p th e por t t o sea l
th e fres h ai r ven t fo r th e EVA P
canister .4. Tur n th e ignitio n switc h O N (II) .
5 . Whil e monitorin g th e FT P
Senso r voltag e wit h th e HD S o r
th e sca n tool , o r measurin g volt -
ag e betwee n PC M connecto r ter -
minal s D1 5 an d D2 2 slowl y
pum p th e vacuu m pum p usin g a
strok e ever y 1- 2 seconds .
6 . Continu e t o pum p vacuu m
until tha t voltag e drop s t oabou t 1.5V .
NOTE : Mak e sur e tha t th e
engin e coolan t temperatur e
stil l abov e 95° F (35°C ) an d you r
vacuu m pum p ha s n o leak .
7 . Monito r tha t voltag e fo r 2 0
seconds .
Doe s th e voltag e dro p to 1. 5 V
an d hold s a t leas t 2 0 seconds ?
NO
Chec k th e EVA P contro l Fue l tan k
vapo r ven t lin e an d connections :
1 . Tur n th e ignitio n switc h OFF .
2 . Disconnec t th e Fue l tan k vapo r
ven t tub e fro m th e EVA P can -
iste r an d plu g th e port .
3 . Tur n th e ignitio n switc h O N (II) .
4 . Whil e monitorin g th e FT P
Senso r voltag e wit h th e HD S o r
th e sca n tool , o r measurin g volt -
ag e betwee n PC M connecto r ter -
minal s D1 5 an d D2 2 slowl y
pum p th e vacuu m pum p usin g a
strok e ever y 1 - 2 seconds .
5 . Continu e t o pum p vacuu m
until tha t voltag e drop s t oabou t 1.5V .
NOTE : Mak e sur e tha t th e
engin e coolan t temperatur e
stil l abov e 95° F (35°C ) an d you r
vacuu m pum p ha s n o leak .
6 . Monito r tha t voltag e fo r 2 0
seconds .
CAP
EVA PCANISTE R
EVAPCANISTE RVENTSHU TVALV E
VACUU M PUMP/GAUGE ,
0 - 3 0 In.H g
A973 X - 04 1 - XXXX X
TEEFITTING S
EVAP TW OWAYVALV E
Inspec t th e EVA P caniste r ven t
shu t valv e lin e an d connections .
FUEL TANK VAPOR
VENT TUBE
CA P
(To page 11-101)
ProCarManuals.com
Page 188 of 1954

(From pag e 11-100 )
Doe s th e voltag e dro p to 1. 5 V
an d hol d a t leas t 2 0 seconds ?
Chec k th e EVA P caniste r purg e
valv e lin e an d connections :
1 . Tur n th e ignitio n switc h OFF .
2 . Disconnec t th e Purg e lin e
hos e fro m th e EVA P caniste r
an d plu g th e port .
3. Tur n th e ignitio n switc h O N(II) .4. Whil e monitorin g th e FT PSenso r voltag e wit h th e HD S
o r th e sca n tool , o r measurin g
voltag e betwee n PC M con -
necto r terminal s D1 5 an d D2 2
slowl y pum p th e vacuu mpump usin g a strok e ever y 1 -
2 seconds .
5 . Continu e t o pum p vacuu m
until tha t voltag e drop s t oabou t 1.5V .NOTE : Mak e sur e tha t th eengin e coolan t temperatur e
stil l abov e 95° F (35°C ) an d you r
vacuu m pum p ha s n o leak .
6 . Monito r tha t voltag e fo r 2 0
seconds .
Does th e voltag e dro p to 1. 5 V
an d hold s a t leas t 2 0 seconds ? Inspec
t th e fue l tan k vapo r ven t
lin e an d connections .
Inspec t th e EVA P caniste r purg e
valv e lin e an d connections . I f
they are OK , d o th e EVA P tw o
wa y valv e tes t (se e pag e 11-108 ).
(cont'd )
11-101
VACUU M
PUMP/GAUGE , 0-3 0 in.H g
A973 X - 04 1 - XXXX X
Replac e th e EVA P canister .
ProCarManuals.com
Page 189 of 1954

Emission Contro l Syste m
Evaporativ e Emissio n (EVAP ) Control s (cont'd )
The sca n too l indicate s Diagnosti c Troubl e Cod e (DTC ) P0497 : Evaporativ e Emissio n (EVAP ) syste m lo w purg e
flow.
Troubleshootin g Flowchar t
— Th e MI L ha s bee n reporte d on .
— DT C P049 7 is stored .
Chec k th e EVA P caniste r purg e
valve:1. Disconnec t th e vacuu m hos e
fro m th e EVA P caniste r purg e
valve , an d connec t a hos e an d
a vacuu m pum p t o th e EVA P
caniste r purg e valve .
2 . Connec t th e PC M connecto r
terminal A2 3 t o th e bod ygroun d wit h a jumpe r wire .3. Tur n th e ignitio n switc h O N (II) .4. Appl y vacuu m to th e hose .
Dos e th e valv e hol d vacuum ?
YES
Chec k fo r a n ope n i n th e wir e
(PC S line) :
1. Tur n th e ignitio n switc h OFF .2. Disconnec t th e EVA P caniste r
purg e valv e 2 P connector .
3 . Chec k fo r continuit y betwee n
th e EVA P caniste r purg e valv e
2 P connecto r termina l No . 1 an d
bod y ground .
I s ther e continuity ?
YES
EVA P caniste r purg e valv e is OK .
D o th e EVA P caniste r ven t shu t
valv e tes t (se e pag e
11-103).
Repai r ope n i n th e wir e betwee n
th e EVA P caniste r purg e valv e
an d PC M (A23) .
Chec k fo r a n ope n i n th e wir e
(IG 1 line) :
1. Tur n th e ignitio n switc h O N (II) .2. Measur e voltag e betwee n th e
EVA P caniste r purg e valv e 2 P
connecto r termina l No . 2 an d
bod y ground .
(T o pag e
11-103)
ProCarManuals.com
Page 190 of 1954

(From pag e 11-102)
I s ther e batter y voltage ?
NO
Repai r ope n in th e wir e betwee nthe EVA P caniste r purg e valv eand No . 2 0 EC U (PCM ) (20 A )fuse .
EVA P caniste r ven t shu t valv etest.
Chec k th e EVA P caniste r ven t
shu t valve :
1 . Disconnec t th e vacuu m hos e
an d connec t a vacuu m pum p
t o th e hose .
2. Connec t th e PC M connecto rterminal F 5 t o th e bod y groun dwith a jumpe r wire .3. Tur n th e ignitio n switc h O N (II) .4. Appl y vacuu m to th e hose .
Does th e valv e hol d vacuum ?
NO
Chec k fo r a n ope n i n th e wir e
(VS V line) :
1. Tur n th e ignitio n switc h OFF .2. Disconnec t th e EVA P caniste rvent shu t valv e 2 P connector .3. Chec k fo r continuit y betwee n
th e EVA P caniste r ven t shu t
valv e 2 P connecto r termina l
No. 2 an d bod y ground .
Is ther e continuity ?
YES
Chec k fo r a n ope n i n th e wir e
(IG 1 line) :
1. Tur n th e ignitio n switc h O N (II) .2. Measur e voltag e betwee n th e
EVA P caniste r ven t shu t valv e
2 P connecto r termina l No . 1
an d bod y ground . Replac
e th e EVA P caniste r purg e
valve .
VACUU M PUMP/GAUGE ,
0 - 3 0 In.H g
A973X - 041 - XXXXX
EVA PCANISTE R
EVAP caniste r ven t shu t valv e i s
OK . Inspec t th e vacuu m hos e
betwee n th e EVA P caniste r
purg e valv e an d th e EVA P canis -
ter.
Repai r ope n i n th e wir e betwee nthe EVA P caniste r ven t shu tvalve an d PC M (F5) .
(T o pag e
11-104)
ProCarManuals.com
Page 191 of 1954
Emission Contro l Syste m
Evaporativ e Emissio n (EVAP ) Control s (cont'd )
(From pag e 11-103 )
I s ther e batter y voltage ? Replac
e th e EVA P caniste r ven t
shu t valv e an d O-ring .
Repai r ope n i n th e wir e betwee n
th e EVA P caniste r ven t shu t
valv e an d No . 2 0 EC U (PCM ) (2 0
A)fuse .
ProCarManuals.com
Page 192 of 1954

Symptom-to-Component Char t
Electrica l Syste m
DTC*
P071 5 (15 )
P072 0 (9 )
P073 0 (41 )
P074 0 (40 )
P075 3 (7 )
P075 8 (8 )
P070 5 (5-2 )
P070 6 (6-2 )
P074 3 (1-2 )
P2756(2-2 )
P0748 (16-2 )
P0501 (4-2 )
Indicato rLight
OFF
('96 - 9 7 models )
Blink s
('9 8 - 0 4 models )
Blink s
OFF
OFF
Blink s
Blink s
Blink s
OFF
Blink s
Blink s
Blink s
Blink s
MIL
ON
O N
O N
O N
ON
O N
O N
O N
O N
ON
O N
O N
Detectio n Ite m
Mainshaf t spee d senso r
Countershaf t spee d senso r
Shif t contro l syste m
Lock-u p contro l syste m
Shift solenoi d valv e A
Shif t solenoi d valv e B
Transmissio n rang e switc h (A/ T gea r positio n switch )
(shor t t o ground )
Transmissio n rang e switc h (A/ T gea r positio n switch )
(open)
Torqu e converte r clutc h solenoi d valv e A(Lock-u p contro l solenoi d valv e A )
Torqu e converte r clutc h solenoi d valv e B
(Lock-u p contro l solenoi d valv e B )
A/ T clutc h pressur e contro l solenoi d valv e
Vehicl e spee d senso r (VSS )
Page
14-9
14-1 2
14-4
14-6
14-1 4
14- 8
DTC* : Th e DT C in parenthese s is th e cod e th e indicato r ligh t indicate s whe n th e servic e chec k connecto r i s connecte d
to th e specia l too l (SC S servic e connector) .
14-74
14-72
14-78
14-77
14-70 14-68
ProCarManuals.com