2004 CHRYSLER VOYAGER Service Manual

Page 113 of 2585

CHRYSLER VOYAGER 2004  Service Manual (4) Remove hub nut and washer.
CAUTION: The half shaft outer CV joint, when
installed, acts as a bolt and secures the hub/bear-
ing assembly. If the vehicle is to be supported or
moved on its wheels,

Page 114 of 2585

CHRYSLER VOYAGER 2004  Service Manual (5) Install the spring washer, nut lock, and a new
cotter pin (Fig. 6). Be sure to wrap the cotter pin
prongs tightly around the hub nut lock.
(6) Install rear wheel. Torque the lug nuts to 135
N´m (

Page 115 of 2585

CHRYSLER VOYAGER 2004  Service Manual (3) Remove the large and small diameter retaining
clamps holding the CV boot to the CV joint and the
interconnecting shaft (Fig. 8).
(4) Pull the boot back from the CV joint (Fig. 9).(5) Remove the CV

Page 116 of 2585

CHRYSLER VOYAGER 2004  Service Manual (7) Remove the tripod assembly from the intercon-
necting shaft (Fig. 12).
(8) Remove the CV boot from the interconnecting
shaft (Fig. 13).INSTALLATION
(1) Clean the interconnecting shaft and CV joint

Page 117 of 2585

CHRYSLER VOYAGER 2004  Service Manual (11) Install CV joint seal boot to interconnecting
shaft clamp evenly on sealing boot.(12) Place crimping tool C-4975-A over bridge of
clamp (Fig. 19).
(13) Tighten nut on crimping tool C-4975-A until

Page 118 of 2585

CHRYSLER VOYAGER 2004  Service Manual (14) Position CV boot into the CV housing retain-
ing groove. Install the boot large diameter retaining
clamp evenly onto the boot.
(15) Clamp the CV joint boot to the CV joint, using
required procedu

Page 119 of 2585

CHRYSLER VOYAGER 2004  Service Manual LATCHING TYPE BOOT CLAMP
If seal boot uses low profile latching type boot
clamp, use the following procedure to install the
retaining clamp.
(1) Place prongs of clamp locking tool in the holes
of the

Page 120 of 2585

CHRYSLER VOYAGER 2004  Service Manual PROPELLER SHAFT
TABLE OF CONTENTS
page page
PROPELLER SHAFT
DESCRIPTION.........................21
OPERATION...........................21REMOVAL.............................21
INSTALLATION............