2004 CHRYSLER VOYAGER Service Manual

Page 193 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
INSTALLATION - LHD
(1) Position power brake booster on dash panel
using the reverse procedure of its removal (Fig. 62).
It may be necessary to push in on booster input rod
as it is guided

Page 194 of 2585

CHRYSLER VOYAGER 2004  Service Manual the mounting nuts to a torque of 14 N´m (124 in.
lbs.).
(16) Install the battery tray. Install the two nuts
and one bolt attaching the battery tray to the vehicle.
Tighten the bolt and nuts to a torq

Page 195 of 2585

CHRYSLER VOYAGER 2004  Service Manual (12) If the vehicle is equipped with the 2.5L diesel
engine, install the coolant recovery pressure con-
tainer and bracket. (Refer to 7 - COOLING/ENGINE/
COOLANT RECOVERY PRESS CONTAINER -
INSTALLATIO

Page 196 of 2585

CHRYSLER VOYAGER 2004  Service Manual Here is how the height sensing proportioning valve
differs from a standard proportioning valve. As the
height of the rear suspension changes, the height
sensing portion of the proportioning valve chan

Page 197 of 2585

CHRYSLER VOYAGER 2004  Service Manual (7) Remove the screw fastening the proportioning
valve actuator rod bracket to the rear axle. Raise the
actuator lever to the full-upward position and hold it
there.
(8) With the aid of a helper, appl

Page 198 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION - PROPORTIONING VALVE
(HEIGHT SENSING)
(1) Install the end of the actuator rod through the
axle bracket grommet and slide the proportioning
valve bracket under the rear track bar body bra

Page 199 of 2585

CHRYSLER VOYAGER 2004  Service Manual ROTOR RUNOUT
On-vehicle rotor runout is the combination of the
individual runout of the hub face and the runout of
the rotor. (The hub and rotor runouts are separable).
To measure rotor runout on the

Page 200 of 2585

CHRYSLER VOYAGER 2004  Service Manual stud, two studs apart from the original stud (Fig. 79).
Tighten nuts in the proper sequence and torque to
specifications.
Recheck brake rotor runout to see if the runout is
now within specifications.