Page 425 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)>
Scan tool 42
Code General scan tool
No.Ignition Coil CircuitP r o b a b l e
43
[Comment]
BackgroundlIgnition coil wiring harness or connectorfailedl The PCM MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)>
Scan tool 42
Code General scan tool
No.Ignition Coil CircuitP r o b a b l e
43
[Comment]
BackgroundlIgnition coil wiring harness or connectorfailedl The PCM](/manual-img/19/57345/w960_57345-424.png)
ENGINE (NON-TURBO)>
Scan tool 42
Code General scan tool
No.Ignition Coil CircuitP r o b a b l e
43
[Comment]
BackgroundlIgnition coil wiring harness or connectorfailedl The PCM provides the ground control circuit for the side of ignition coil. Open circuit in coill Battery voltage is through the relay (ASD relay). P C M Range of Checkl Battery voltage: 13 or more (engine is running)
l relay (ASD relay): ON
l Engine: 3000 or lessl Engine speed and ignition timing are always stable.
Set Condition
lThe primary circuit is not achieving peak current w ith maximum dwell for 3 seconds.
SCAN TOOL Actuator test 10
relay (ASD relay)
OK: ooeratina sound can be heard.
NG Repair relay (ASD relay) related
OK
Measure at the ignition coil connector lDisconnect the connector, and measure at the harnes s side.
SCAN TOOL Actuator test 10
relay (ASD relay) relay (ASD relay) is turned on and off 1.4 seconds.
l Voltage between 2 and ground
[Measure with
relay (ASD relay) on.]
OK: Battery positive voltage Check the harness wire the (ASD-relay) and
the ignition coil connector. Repair,’ necessary.
NGMeasure at the PCM connector Check the following connector: lDisconnect the connector and measure at the harness side.lDisconnect PCM connector and short terminal (67) of
the harness-side connector to ground.
Voltage between 3 and ground OK: Battery positive voltage
OK
Check the harness wire between PCM and the ignition connector. Repair, if necessary.
Check the following connector:
OK
NG Repair
Check trouble symptom.
Replace the PCM.
N G
TSB Revision
Page 426 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)> ,
Scan tool 43
Code General scan tool
No.Ignition Coil Primary CircuitP r o b a b l e
43
[Comment]lBackgroundIgnition coil wiring harness orfailedl
The PCM pr MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)> ,
Scan tool 43
Code General scan tool
No.Ignition Coil Primary CircuitP r o b a b l e
43
[Comment]lBackgroundIgnition coil wiring harness orfailedl
The PCM pr](/manual-img/19/57345/w960_57345-425.png)
ENGINE (NON-TURBO)> ,
Scan tool 43
Code General scan tool
No.Ignition Coil Primary CircuitP r o b a b l e
43
[Comment]lBackgroundIgnition coil wiring harness orfailedl
The PCM provides the ground control circuit for the primary side of ignition coil. Open circuit in ignition l Battery voltage is supplied through the relay relay).
l PCM failedRange of Check Battery voltage: 13 or more (engine is running)l relay (ASD relay): ON
l Engine: 3000 or less
l Engine speed and ignition timing are always stable.
Set Condition
. .
lThe primary circuit is not achieving peak current w ith maximum dwell for 3 seconds.
SCAN TOOL Actuator test
10 relay (ASD relay)
NG Repair relay (ASD relay) related
OK: Relay operating sound can be heard.
Measure at the ignition coil connector lDisconnect the connector, and measure at the harnes s side.
SCAN TOOL Actuator test 10
relay (ASD relay) relay (ASD relay) is turned on and off every 1.4 s econds.
l Voltage between 2 and ground
[Measure with
relay (ASD relay) on.]
OK: Battery positive voltageCheck the harness wire between the ignition coil connector. if necessary.
Measure at the PCM connector
lDisconnect the connector and measure at the harness side.lDisconnect PCM connector and short terminal (67) of
the harness-side connector to ground.
l Voltage between 2 and ground
OK: Battery positive voltage
OK
Check the harness wire between thePCM andthe ignition coil
connector. Repair, if necessary.
TSB Revision
Check the following connector:
OK
NG Repair
Check trouble symptom.
N G
Replace the PCM.
Page 427 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)> Troubleshooting
Scan tool 44
C o d eNo relay) output
No.General scan tool V o l t a g e a t P C M
42
[Comment]l relay (ASD output openBackgroundl Fused circu MITSUBISHI SPYDER 1990 Service Repair Manual ENGINE (NON-TURBO)> Troubleshooting
Scan tool 44
C o d eNo relay) output
No.General scan tool V o l t a g e a t P C M
42
[Comment]l relay (ASD output openBackgroundl Fused circu](/manual-img/19/57345/w960_57345-426.png)
ENGINE (NON-TURBO)> Troubleshooting
Scan tool 44
C o d eNo relay) output
No.General scan tool V o l t a g e a t P C M
42
[Comment]l relay (ASD output openBackgroundl Fused circuit openlThe PCM senses operation of the relay (ASD relay) by measuring relay voltage.
l relay (ASD reiay) failed .
(If relay turns to ON, voltage is high). l Circuit in faked
.lThis DTC indicates that no voltage is being sensed when the relay (ASD relay) is
being energized.
Range of Check
l Battery voltage: or more ,
l switch: ON
l Unless the engine is cranking
Set Condition
l The relay voltage is low for 1 second.
.
NG Replace
Measure at the
relay (ASD relay) connector lDisconnect the connector and measure at the harness side.
l Voltage between 6 and ground
OK: Battery positive voltage
l Voltage. between 6 and ground
OK: Battery positive voltage
OK
, .
Check the harness wire the relay relay) and,
the fusible link. Repair,
NGCheck the followingconnect Repair
OK
Check trouble symptom.
N G NG
Check the harness wire between the PCM and the relay (ASD Repair
relay) connector.
Check trouble symptom.
the PCM.
NG
TSB Revision
Page 428 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual E N G I N E
Scan tool 46
Code General scan toolEGR System Failure c a u s e No.
32
[Comment]Backgroundl EGR valve
l Once per vehicle trip the PCM monitors the EGR syst em fi MITSUBISHI SPYDER 1990 Service Repair Manual E N G I N E
Scan tool 46
Code General scan toolEGR System Failure c a u s e No.
32
[Comment]Backgroundl EGR valve
l Once per vehicle trip the PCM monitors the EGR syst em fi](/manual-img/19/57345/w960_57345-427.png)
E N G I N E
Scan tool 46
Code General scan toolEGR System Failure c a u s e No.
32
[Comment]Backgroundl EGR valve
l Once per vehicle trip the PCM monitors the EGR syst em fiow rate.. t u b e l harness and lIf the flow rate is above or below the acceptable l
imits, the PCM stores a’ diagnostic
l Vacuum hoses’ failed
trouble code.
Range of Check
l Engine temperature is greater than
l More than three minutes have passed since start-up.
l Engine is between 1952 and 2400.
l MAP voltage is between and 2.70.
l TPS voltage is between 0.6 and
Vehicle speed exceeds 3 mph. Short term fuel compensation value is exhibiting l ess than During air/fuel ratio closed loop control ConditionThe measured change in the short-term fuel compensa tion value shift during the test is
less than 7.4% or greater than 20.5%.
Check the idle running.
l Idle running after warming up
lRemove the vacuum hose from the EGR valve nipple an d plugit.lConnect a hand vacuum pump to the EGR valve nipple, and
apply a 12 (3.5 of vacuum.
OK: Idle speed becomes unstable or the engine stalls.
NG.lCheck the EGR valve and replace if lCheck the EGR tube for and clean or it . .
OK
OK
Repair
Check the EGR solenoid circuit. (Refer to INSPECTIONP R O C E D U R E F O R D I A G N O S T I C T R O U B L E C O D E S
Scan tool 46
Code General scan tool PCM Failure
No.SRI Mile Not Stored
62
Revision
[Comment]lUnsuccessful attempt to update service reminder ind icator (SRI or mileage in the
control module EEPROM.
Replace the PCM.I
Probable cause
Page 429 of 2103

ENGINE , Troubleshooting
EEPROM Write DeniedProbable.
[Comment)l Unsuccessful attempt to write to an EEPROM location by the control module.l
PCMI
Replace the PCM.
Scan tool 57
Code General scan Intake Air Temperature
No.Voltage Low
23
[Comment]l Sensor to Backgroundl Sensor internally shortedlWhen the fuel system is in the open loop mode, the heated oxygen sensor cannot be
l PCM failed
used for injector pulse width calculation.
l In this instance, the system uses information on ai r mass to determine the correct
,
width necessary to achieve the proper air/fuel rati o.lBecause air mass is related to temperature, informa tion from the intake air temperature ,
sensor is necessary.
Range of Check
l Ignition switch: ON
Set Condition
lIntake air temperature sensor output voltage is les s than 0.2 for 3 seconds.
N GCheck the intake air temperature sensor. (Refer to Replace
OK
Repair
OK
Check trouble symptom.
N G
Check the harness wire temperature sensor connector.
OK
Repair
Replace the PCM.
TSB Revision
Page 430 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual Scan tool 58
Code General scan tool Air Temperature Senspr
No.Voltage High
23
[Comment]Background
lWhen the fuel system is in the open mode, the heated oxygen sensor cannot MITSUBISHI SPYDER 1990 Service Repair Manual Scan tool 58
Code General scan tool Air Temperature Senspr
No.Voltage High
23
[Comment]Background
lWhen the fuel system is in the open mode, the heated oxygen sensor cannot](/manual-img/19/57345/w960_57345-429.png)
Scan tool 58
Code General scan tool Air Temperature Senspr
No.Voltage High
23
[Comment]Background
lWhen the fuel system is in the open mode, the heated oxygen sensor cannot be
used for injector pulse width calculation.
lIn this instance, the system uses on air mass to determine the correct pulse
width necessary to achieve the proper air/fuel rati o.
lBecause air mass is related to temperature, informa tion from the intake air temperature
sensor is necessary.
Range of Check
l Ignition switch: ON
Set Condition
l air temperature sensor output voltage is more than for 3
Check the intake air temperature sensor. (Refer to Replace
Measure at the intake air temperature sensor connec tor
lDisconnect the connector, and measure at the harness side.
l Continuity between and ground
OK: Continuity
OK
Sensor signal circuit open Sensor internally open
l Sensor ground circuit open
l PCM failed
Check the wire between the PCM the intake temperature connector. if necessary.
Check the following
OK
NG Repair
Check trouble symptom.
N G NGCheck the harness wire between the PCM and the inta ke air temperature sensor connector.
N G
Replace the PCM.
Repair
TSB Revision
Page 431 of 2103
ENGINE
Scan tool 59. . ,
Knock Sensor CircuitNo.
16
[Comment]
Background
lThe sensor consists of a material that constantly vibrates, sending asignal to the PCM when the engine is operating.lWhen the signal exceeds a threshold, the PCM retards engine ignition timing to reduce
Set Condition
l Knock sensor signal below minimum acceptable thresh old voltage.
Knock sensor output voltage is above 5.0 volts.
l Knock sensor lOpen or shorted knock sensor l
. .
,
I
Measure at the knock sensor connector Check the following lDisconnect the connector, and measure at the harnes s side.
l Continuity between 2 and ground
OK: Continuity,
OK
if.
NG.
Repair .
OK
Check trouble symptom.
N G Repairconnector.
OK
Replace the knock sensor.
.
Check trouble symptom.
NG
Replace the PCM.
TSB Revision.
Page 432 of 2103
![MITSUBISHI SPYDER 1990 Service Repair Manual E N G I N E
Scan tool 61
Code General scan tool
No.Injector Control Circuit c a u s e
27
[Comment]
Backgroundl Open or shorted injector control
l Grounds for the injector circui MITSUBISHI SPYDER 1990 Service Repair Manual E N G I N E
Scan tool 61
Code General scan tool
No.Injector Control Circuit c a u s e
27
[Comment]
Backgroundl Open or shorted injector control
l Grounds for the injector circui](/manual-img/19/57345/w960_57345-431.png)
E N G I N E
Scan tool 61
Code General scan tool
No.Injector Control Circuit c a u s e
27
[Comment]
Backgroundl Open or shorted injector control
l Grounds for the injector circuits are provided by t he PCM.l
Open injector
l Battery power is provided through the relay. (ASD relay) l
O p e n in PCM lThis DTC is set if an open or short-circuit is detected in the control forthe individual injector.Range of Check
l Battery voltage: or morel relay (ASD relay): ON Engine: 3000 or lessSet ConditionlCounterelectromotive force is not detected for thre e seconds immediately after injectors off.
Check the injector. (Refer to
OK
Measure at the injector connector lDisconnect the connector, and measure at the harnes s side.
SCAN TOOL Actuator test 10
relay (ASD relay) istumedonandoff l Voltage between 2 and ground
[Measure with the relay (ASD relay) on]
OK: Battery positive voltage
N G the following connect&s:
OK NG
Check trouble symptom. Repair
NG
Check the harness wire between the the injector connector. Repair, if necessary.
NG Measure at the PCM connector Check the following connectors: lDisconnect the connector, and measure at the harnes
s side.lDisconnect PCM connector and short terminal (67) of
the harness-side connector to ground.
l Voltage between 16 and ground
OK: Battery positive voltage
Check the harness between PCM and injector connecto r; if necessary.
OK
Check the NG Repair
OK
Check trouble svmotom.I
Replace the PCM.
NG
TSB Revision