Page 2073 of 2267

Engine Maintenance
INSPECTION AND ADJUSTMENT
Drive belt deflection and tension
Deflection adjustment Unit: mm (in) Tension adjustment* Unit: N (kg, lb)
Used belt
New beltUsed belt
New belt
LimitAfter
adjustmentLimitAfter
adjustment
Alternator
Without aircondi-
tioner compressor10.2
(0.402)6.5 - 7.0
(0.256 - 0.276)5.5 - 6.1
(0.217 - 0.240)
292
(29.8, 65.6)652 - 740
(66.5 - 75.5,
146.6 - 166.4)789 - 877
(80.5 - 89.7,
177.4 - 197.6)
With airconditioner
compressor8.1
(0.319)5.3 - 5.7
(0.209 - 0.224)4.5 - 5.0
(0.177 - 0.197)
Power steering
oil pump10.8
(0.425)6.6 - 7.5
(0.260 - 0.295)6.0 - 6.6
(0.236 - 0.260)196
(20.0, 44.1)495 - 583
(50.5 - 59.5,
111.3 - 131.1)603 - 691
(61.5 - 70.5,
135.6 - 155.3)
Applied pushing force 98 N (10 kg, 22 lb)—
*: If belt tension gauge cannot be installed at check points shown, check drive belt tension at a different location on the belt.
Oil capacity (Refill capacity)Unit:(Imp pts)
With oil filter change 2.9 (5 - 1/8)
Without oil filter change 2.7 (4 - 3/4)
Coolant capacityUnit:(Imp pts)
With reservoir tank 6.1 (10 - 3/4)
Reservoir tank 0.8 (1 - 3/8)
Spark plug
Make CHAMPION NGK
Standard typeRC10YCC4
RC10YC4BKR5E-11
Hot typeRC12YCC4
RC12YC4BKR4E-11
Cold typeRC7YCC4
RC7YC4BKR6E-11
Plug gap mm (in) 1.0 - 1.1 (0.039 - 0.043)
SERVICE DATA AND SPECIFICATIONS (SDS)QG
MA-56
Page 2074 of 2267

Engine Maintenance
INSPECTION AND ADJUSTMENT
Drive belt deflection and tension
Deflection adjustment Unit: mm (in) Tension adjustment* Unit: N (kg, lb)
Used belt
New beltUsed belt
New belt
LimitAfter adjust-
mentLimitAfter adjust-
ment
Alternator12-13
(0.47 - 0.51)8-9
(0.31 - 0.35)7-8
(0.28 - 0.31)264
(26.9, 59.3)493 - 583
(50.3 - 59.5,
110.8 - 131.1)11720 70J00 11720 70J05
603 - 691
(61.5 - 70.5,
135.6 - 155.3)652 - 740
(66.5 - 75.5,
146.6 - 166.4)
Air condi-
tioner com-
pressor9 (0.35)5.5 - 6.5
(0.217 -
0.256)4.5 - 5.5
(0.177 -
0.217)304
(31.0, 68.3)534 - 623
(54.5 - 63.5,
120.0 - 140.1)11920 9F500 11920 9F505
652 - 740
(66.5 - 75.5,
146.6 - 166.4)838 - 926
(85.5 - 94.5,
188 - 208)
Power steer-
ing oil pump12
(0.47)8-9
(0.31 - 0.35)7-8
(0.28 - 0.31)264
(26.9, 59.3)493 - 583
(50.3 - 59.5,
110.8 - 131.1)603 - 691
(61.5 - 70.5,
135.6 - 155.3)603 - 691
(61.5 - 70.5,
135.6 - 155.3)
Applied push-
ing force98 N (10 kg, 22 lb)—
*: If belt tension gauge cannot be installed at check points shown, check drive belt tension at a different location on the belt.
Oil capacity (Refill capacity)Unit:(Imp pts)
With oil filter change 3.7 (6 - 1/2)
Without oil filter change 3.5 (6 - 1/8)
Coolant capacity (Refill capacity)
Unit:(Imp pts)
Engine SR20DE
With reservoir tankM/T 6.6 (11 - 5/8)
CVT 6.8 (12)
Reservoir tank 0.8 (1 - 3/8)
Spark plug
Make NGK
Ty p e
Standard BKR6EY-11
Hot—
Cold—
Plug gap mm (in) 1.0 - 1.1 (0.039 - 0.043)
Ignition leadUnit: kΩ/m
Ignition lead Resistance [at 25°C(77°F)]
No. 1 cylinder Approx 3.8
No. 2 cylinder Approx 3.5
No. 3 cylinder Approx 2.7
No. 4 cylinder Approx 2.4
For U.K. (Made by Bougicord) 4.48 - 6.72 kΩ(1.365 - 2.048
kΩ/ft) [at 25°C (77°F)]
SERVICE DATA AND SPECIFICATIONS (SDS)SR20DE
MA-57
Page 2075 of 2267
Engine Maintenance
INSPECTION AND ADJUSTMENT
Drive belt deflection
Deflection adjustment Unit: mm (in)
Used belt
New belt
Limit After adjustment
Alternator 17 (0.67)10.5 - 12.5
(0.413 - 0.492)8.5 - 10.5
(0.335 - 0.413)
Air conditioner compressor 17 (0.67)11.5 - 13.5
(0.453 - 0.531)9.5 - 11.5
(0.374 - 0.453)
Power steering oil pump 8 (0.31)5-7
(0.20 - 0.28)4-6
(0.16 - 0.24)
Applied pushing force 98 N (10 kg, 22 lb)
Coolant capacity (Refill capacity)
Unit:(Imp pts)
With reservoir tank 6.4 (11 - 1/4)
Reservoir tank 0.8 (1 - 3/8)
Engine oil capacity (Refill capacity)
Unit:(Imp pts)
With oil filter 5.0 (8 - 3/4)
Without oil filter 4.5 (7 - 7/8)
Injection nozzle
Unit: kPa (bar, kg/cm2, psi)
Injection pressure 12,749 (127.5, 130, 1,849)
SERVICE DATA AND SPECIFICATIONS (SDS)CD20T
MA-58
Page 2076 of 2267
Chassis and Body Maintenance
Wheel balance
Wheel balance
(Maximum allowable unbalance
at rim flange) g (oz)10 (0.35)
Tire balance weight g (oz)5-60(0.18-2.12)
Spacing 5 (0.18)
SERVICE DATA AND SPECIFICATIONS (SDS)
MA-59
Page 2077 of 2267
NOTE
SERVICE DATA AND SPECIFICATIONS (SDS)
MA-60
Page 2078 of 2267

MANUAL TRANSAXLE
SECTION
MT
CONTENTS
PREPARATION...............................................................3
Special Service Tools ..................................................3
Commercial Service Tools ...........................................6
NOISE, VIBRATION AND HARSHNESS (NVH)
TROUBLESHOOTING.....................................................7
NVH Troubleshooting Chart.........................................7
ON-VEHICLE SERVICE..................................................8
Replacing Oil Seal .......................................................8
DIFFERENTIAL OIL SEAL..........................................8
STRIKING ROD OIL SEAL..........................................8
Position Switch Check .................................................9
BACK-UP LAMP SWITCH...........................................9
NEUTRAL POSITION SWITCH...................................9
REMOVAL AND INSTALLATION.................................10
Removal .....................................................................10
Installation ..................................................................12
RS5F32A
DESCRIPTION...............................................................13
Cross-sectional View .................................................13
MAJOR OVERHAUL.....................................................14
Transaxle Gear Control .............................................14
Case Components .....................................................15
Gear Components .....................................................16
Shift Control Components .........................................17
DISASSEMBLY..............................................................18
REPAIR FOR COMPONENT PARTS............................21
Input Shaft and Gears ...............................................21
DISASSEMBLY........................................................21
INSPECTION...........................................................22
ASSEMBLY.............................................................23
Mainshaft and Gears .................................................24
DISASSEMBLY........................................................24
INSPECTION...........................................................26
ASSEMBLY.............................................................28
Final Drive..................................................................32
DISASSEMBLY........................................................32
INSPECTION...........................................................33
ASSEMBLY.............................................................33
Shift Control Components .........................................35
INSPECTION...........................................................35
ADJUSTMENT OF INPUT SHAFT BRAKING
MECHANISM
...........................................................36
Case Components .....................................................37
REMOVAL AND INSTALLATION................................37
ADJUSTMENT...............................................................39
Differential Side Bearing Preload ..............................39
ASSEMBLY....................................................................41
RS5F70A
DESCRIPTION...............................................................45
Cross-sectional View .................................................45
DOUBLE-CONE SYNCHRONIZER............................46
MAJOR OVERHAUL.....................................................47
Transaxle Gear Control .............................................47
Case Components .....................................................48
Gear Components .....................................................49
Shift Control Components .........................................50
Final Drive Components ............................................51
DISASSEMBLY..............................................................52
Transaxle Case ..........................................................52
Clutch Housing ..........................................................54
REPAIR FOR COMPONENT PARTS...........................58
Input Shaft and Gears ...............................................58
DISASSEMBLY........................................................58
INSPECTION...........................................................59
ASSEMBLY.............................................................60
Mainshaft and Gears .................................................63
DISASSEMBLY........................................................63
INSPECTION...........................................................64
ASSEMBLY.............................................................66
Final Drive..................................................................71
PRE-INSPECTION...................................................71
DISASSEMBLY........................................................72
INSPECTION...........................................................72
MT
Page 2079 of 2267

ASSEMBLY.............................................................73
Shift Control Components .........................................74
INSPECTION...........................................................74
ASSEMBLY....................................................................76
Clutch Housing ..........................................................76
Transaxle Case ..........................................................80
SERVICE DATA AND SPECIFICATIONS (SDS)..........86
General Specifications - RS5F32A and RS5F70A ....86
TRANSAXLE...........................................................86
FINAL GEAR...........................................................86
RS5F32A
SERVICE DATA AND SPECIFICATIONS (SDS)..........87
Inspection and Adjustment - RS5F32A .....................87
GEAR END PLAY....................................................87
CLEARANCE BETWEEN BAULK RING AND
GEAR
.....................................................................87
AVAILABLE CHECK PLUGS.....................................87
AVAILABLE SNAP RINGS........................................87
AVAILABLE C-RINGS...............................................87
AVAILABLE SPACERS.............................................88
AVAILABLE WASHERS............................................88
AVAILABLE SHIMS - DIFFERENTIAL SIDE
BEARING PRELOAD AND ADJUSTING SHIM
............88
INPUT SHAFT BRAKING MECHANISM.....................89
MAINSHAFT END PLAY...........................................89
RS5F70A
SERVICE DATA AND SPECIFICATIONS (SDS).........90
Inspection and Adjustment - RS5F70A .....................90
GEAR END PLAY....................................................90
CLEARANCE BETWEEN BAULK RING AND
GEAR
.....................................................................90
AVAILABLE SNAP RINGS........................................90
AVAILABLE C-RINGS..............................................90
AVAILABLE ADJUSTING SHIMS...............................91
AVAILABLE THRUST WASHER................................92
AVAILABLE WASHERS............................................92
AVAILABLE SHIMS - DIFFERENTIAL SIDE
BEARING PRELOAD AND ADJUSTING SHIM
...........92
CONTENTS(Cont'd)
MT-2
Page 2080 of 2267

Special Service ToolsNCMT0001
Tool number
Tool nameDescription
KV38107700
Preload adapter
NT087
Measuring turning torque of final drive assembly
Measuring total turning torque
Measuring clearance between side gear and differ-
ential case with washer
Selecting differential side bearing adjusting shim
(Use with KV38106000.)
KV38106000
Height gauge adapter
(differential side bearing)
NT418
Selecting differential side bearing adjusting shim
(Use with KV38107700 or KV38105900.)
a: 140 mm (5.51 in)
b: 40 mm (1.57 in)
c: 16 mm (0.63 in) dia.
d: M8´1.25P
KV32101000
Pin punch
NT410
Removing and installing retaining pin
Removing and installing lock pin
Removing selector shaft
Removing welch plug
a: 4 mm (0.16 in) dia.
KV31100300
Pin punch
NT410
Removing and installing retaining pin
a: 4.5 mm (0.177 in) dia.
ST30031000
Puller
NT411
Removing 3rd, 5th input gear
Removing 3rd & 4th and 5th & Rev synchronizer
hub
Removing mainshaft rear bearing
Removing 2nd gear, 5th gear bushing
Removing 1st & 2nd synchronizer hub, 1st and
4th main gear
Removing and installing differential side bearing
a: 90 mm (3.54 in) dia.
b: 50 mm (1.97 in) dia.
ST30021000
Puller
NT411
Removing input shaft front and rear bearing
Installing input shaft front and rear bearing
Installing 5th input gear, 3rd main gear and 4th
main gear
Installing 1st & 2nd, 3rd & 4th and 5th & Rev syn-
chronizer hub
Installing 2nd gear bush, 5th gear bush, Rev gear
bushing
Installing mainshaft rear bearing
a: 110 mm (4.33 in) dia.
b: 68 mm (2.68 in) dia.
ST22730000
Puller
NT411
Removing mainshaft front and rear bearing inner
race (F31A)
Removing 5th main gear
a: 82 mm (3.23 in) dia.
b: 30 mm (1.18 in) dia.
PREPARATION
Special Service Tools
MT-3