1997 ACURA NSX Service Repair Manual

Page 1313 of 1503

ACURA NSX 1997  Service Repair Manual Safety Indicato r (NSX- T "ope n top" )
Roof Loc k Switc h Tes t
1. Remov e th e headline r (se e sectio n 20 ).
2 . Disconnec t th e 3 P connecto r fro m th e roo f loc k
switch .
ROOF LOC KS

Page 1314 of 1503

ACURA NSX 1997  Service Repair Manual 
Roof Holder Switch Test

1. Open the rear hatch and engine cover.

2. Disconnect the 1P connector from the roof holder

switch.

3. There should be continuity between the A and B ter-

minals with th

Page 1315 of 1503

ACURA NSX 1997  Service Repair Manual A/T Gea r Positio n Indicato r
Componen t Locatio n Inde x
SRS component s ar e locate d i n thi s area . Revie w th e
SR S componen t locations , precautions , an d procedure s
i n  th e SR S ( secti

Page 1316 of 1503

ACURA NSX 1997  Service Repair Manual A/T Gea r Positio n Indicato r
Indicator Inpu t Tes t
SRS component s ar e locate d i n thi s area . Revie w th e
SR S componen t locations , precautions , an d procedure s
i n  th e SR S ( sectio n 2

Page 1317 of 1503

ACURA NSX 1997  Service Repair Manual WireTes t conditio n
Test: Desire d resul t
Possible caus e if resul t i s  no t obtaine d
BLK
YE L
GRY/WH T
LTBLU
GRN
BRN/BL K
GRN/YE L
LT GRN /
WHT
RED/BL K
and RED2
YEL/BL K
RED1
Under al l conditi

Page 1318 of 1503

ACURA NSX 1997  Service Repair Manual A/T Gea r Positio n Indicato r
A/T Gea r Positio n Switc h Tes t
SRS component s ar e locate d i n thi s area . Revie w th e
SR S componen t locations , precautions , an d procedure s
i n  th e SR S (

Page 1319 of 1503

ACURA NSX 1997  Service Repair Manual A/T Gea r Positio n Switc h
Replacemen t
SRS component s ar e locate d i n thi s area . Revie w th e
SR S componen t locations , precautions , an d procedure s
i n  th e SR S sectio n 24  befor e perf

Page 1320 of 1503

ACURA NSX 1997  Service Repair Manual Integrated Contro l Uni t
Inpu t Tes t
SRS component s ar e locate d i n thi s area . Revie w th e
SR S componen t locations , precautions , an d procedure s
i n  th e SR S sectio n 24  befor e perfor