Page 913 of 1273

32-8POWER PLANT MOUNT -Centermember and Crossmember
CENTERMEMBER ANDCROSSMEMBER
REMOVAL AND INSTALLATIONM3ZYA-A
Pre-removal Operationl Disconnection of the Front Exhaust Pipe
when removing the Crossmember (Re-fer to GROUP 15-Exhaust Pipe and
Main Muffler.) aRaise
and Suspend the Engine to the
Extent Force IS not applied to the Engine
Mount
@Draining of the Power-steering Fluid (Re-
fer to GROUP 37A-Service Adjustment
Procedures.)
40-50 N29-36 ft
Post-installation Operationl Lower the Engine*Coupling of the Front Exhaust Pipe (Re-fer to GROUP 15-Exhaust Pipe and
Main Muffler.)
l Air bleeding of the Power-steering Fluid
(Refer to GROUP
37A- Service Adjust-
ment Procedures.)
l Adjustment of the Front Wheel Align-
ment
(Refer to GROUP
33A-Service Adjust-Iment Procedures.)
80-100 Nm
58-72 ft.lbs.
80-100 Nm
58-72 ft.lbs.
Removal steps
1. Front roll stopper bracket mounting bolt
2. Centermember installation bolts (front)
3.Stopper4.Bushing5.Bushing6.Collar
7. Centermember installation bolts (rear)
8.Centermember9.Stay llA0283
TSB Revision
Page 914 of 1273
POWER PLANT MOUNT - Centermember and Crossmember32-9
35-45
25-33
14\
SW13 I
e
-22-30 ii.&.15T-\-- .-
30-42
15-20 Nm11-14 ftlbs.18
60-80 Nm43-58 ft.lbs.&dOlA0473
10. Stabilizer link installation nut(Refer to GROUP 33A-Stabilizer Bar.)11. Stabilizer link
12. Stabilizer bar bracket installation bolt
13. Stabilizer bar bracket
14. Bushing
15. Stabilizer bar
(Refer to GROUP 33A-Stabilizer Bar.)
16. Cotter pin
17. Tie-rod end connection nut
18. Joint assembly connection bolt
19. Return tube connection
20. Pressure hose connection
21. Mounting brackets
22. Steering gear box assembly (Refer to GROUP 37A-Steering
Gear
Box.)
TSB Revision1
Page 915 of 1273
32-10POWER PLANT MOUNT -Centermember and Crossmember
32
loo-120 Nm*’72-87 ft.lbs.*’
------@
28D
\80-100 Nm58-72 ftlbs.
58-72
ft.lbs.llA0282
23. Self locking nut
24. Clamp
25. Lower arm mounting bolt 26. Stopper
27. Rear roll stopper bracket mounting bolt
28. Self locking nut
29. Lower plate
30. Crossmember
NOTE~1: Indicates parts which should be temporarily tightened, and then fully tightened with the vehicle in the unladen
condition.
31. Stopper
32. Bushing *2:
Vehicles built up to Dec. 1988
*3: Vehicles built from Jan. 1989
TSB Revision
Page 916 of 1273
POWER PLANT MOUNT - Centermember and Crossmember32-11
INSPECTIONM32YcAAl
l Check the crossmember for cracks or deformation.
l Check the bushings for cracks or deterioration.
l Check the centermember for cracks or deformation.
Press out Press fit
Bushing A
Bushing B
Inn& sleeve
12130128 12R0129
BUSHING REPLACEMENThl32YDAAa
(1) Use the special tool to remove and press in bushings A
and
B.
(2) Press in bushings A and B so that the projecting amount
of the inner sleeve agrees with the standard value.
Standard value: Bushing A 7.2-10.2
mm
(.28-.40 in.)
Bushing B6.5-9.5 mm (.26-.37
in.)
Caution
When pressing in, apply a solution of soap and water to
the sliding part of the bushings, and then press them in
without stopping one after the other.
If there is a pause during the pressing operation, the
frictional resistance will prevent installation.
TSB Revision
-1
Page 917 of 1273
32-12POWER PLANT MOUNT -Centermember and Crossmember
C&Et;;rSM>EMBER AND CROSSMEMBER
REMOVAL AND INSTALLATIONM32Yh-0
40-50 Nm29-36 ft.lbs.
50-65 Nm36-47 ft.lbs.80-100
Nm58-72 ftlbs.
80-100
Nm58-72 ft.lbs.
1
’
--
--_ii-58 it.,tTlAO619I 70-r
80 km51-58klbs.
Removal steps
1. Cover installation screw
2.Left member3.Right member
4. Front roll stopper installation bolt
5.No. 1 crossmember installation
nut6.Lower plate7.No. 1 crossmember8.Stopper(B)9.Bushing (B)10.Gusset
Pre-removal OperationeDraining of the Power-steering Fluid
(Refer to GROUP 37A-Service
Adjust-
ment Procedures.)
Post-installation Operation@Air bleeding of the Power-steering Fluid
(Refer to GROUP 37A-Service Adjust-ment Procedures.)l Adjustment of the Front Wheel Align-
ment
(Refer to GROUP 33A-Service Adjust-ment Procedures.)
TSB Revision
Page 918 of 1273
POWER PLANT MOUNT - Centermember and Crossmember32-13
40-60 Nm29-43 ftlbs.
11.12.
13.Front exhaust pipe rear installation bolt
Gasket
Self locking nut
Front exhaust pipe
Gasket
14.
15.
40-60 Nm29-43 ft.lbs.
30-40 Nm22-29 ftlbs.11\ ID12
‘urbo> 30-40 Nm22-29
ftlbs./
/05140117lo-15 Nm7-11 ftlbs.
35-45
25-33
16. Stabilizer link installation nut
(Refer to GROUP 33A-Stabilizer Bar.)17. Stabilizer link
18. Stabilizer bar bracket installation bolt
19. Stabilizer bar bracket
(Refer to GROUP
33A-Stabilizer Bar.)
20. Bushing
21. Stabilizer bar
(Refer to GROUP 33A-Stabilizer Bar.)
TSB Revision
Page 919 of 1273
Page 920 of 1273
POWER PLANT MOUNT -Centermember and Crossmember32-15
40-50 Nm
29-36 ftlbs.
38
I/
100-120
Nm*
72-87 ft.lbs.*
30. Self locking nut
31. Clamp
32. Lower arm
mountino bolt
41
36
35m 80-100
Nm
’ 58-72 ftlbs.
/
80-100
Nm*
58-72 ft.lbs.*OlAO472
33. Stopper
34. Rear roll stopper bracket mounting bolt
35. Self locking nut
36. Lower plate
37. Crossmember
38. Stopper
39. Spacers40. Bushing
NOTE*Indicates parts which should be temporarily tightened.
and then fully tightened with the vehicle in the unladen
condition.
INSPECTIONm327cAA2
l Check the crossmember for cracks or deformation.
l Check the bushings for cracks or deterioration.
l Check the centermember for cracks or deformation.
BUSHING REPLACEMENT
Refer to P-32-1 1.
M32YDAB
TSB Revision1