Page 521 of 1574
M161 ENGINE ELECTRICAL 1E2-9
IGNITION CABLE Preceding Work : Removal of intake air duct
1 Control Cable Connection
2 Ignition Cable
3 Spark Plug Connector
4 Coupling Plug5a, 5b Secondary Voltage Connection
E Iron Core
L1 Secondary Ignition Coil
L2 Primary Ignition Coil
Page 522 of 1574
1E2-10 M161 ENGINE ELECTRICAL Ignition Cable and Cable Lay-out
1. Firing Order : 1-3-4-2
2. T1/1 : Connect the cylinder 1 + 4
3. T1/2 : Connect the cylinder 2 + 3
Removal & Installation Procedure
1. Disconnect the battery negative cable.
2. Unscrew the 3 screws and remove the ignition cable ductcover. Installation Notice
3. Seperate the cable from the ignition cable and the spark plug.
4. Remove the 2 bolts from each ignition cable and remove the ignition cables. Installation Notice Install the ignition cable to the cylinder 2 and 4 and connect the cable from 1 to 4, and from 2 to 3. - T1/1 : Cylinder 1 and 4- T1/2 : Cylinder 2 and 3
5. Installation should follow the removal procedure in the reverse order.
Tightening Torque 9 - 11 Nm
Tightening Torque 9 - 11 Nm
Page 523 of 1574
M161 ENGINE ELECTRICAL 1E2-11
Inspection & Maintenance (for E2.3 MSE)
1. Measure the primary resistance between the cable terminals1 and 15 after removing the ignition cable wiring connector
(1 and 15) with ignition switch OFF. Notice Replace the ignition coil if out of the specified resistance.
T1/2 : between No.71 and No.69
Notice Check the ignition cable and the ECU if out of the
specified value.
3. Measure the secondary cable resistance between the ignition coil 5a and 5b using a multimeter.
2. Measure the primary voltage(T1/1) between the ECU
terminals No.72 and No.69 during the engine cranking (starter motor activated).
Specified Value 6 - 8.5 K
Specified Value0.9 - 1.6
Specified Value 200 - 350 V
Page 524 of 1574