2002 NISSAN TERRANO Service Repair Manual

Page 977 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 1
(Door unlock sensor check)
CHECK DOOR UNLOCK SENSOR
INPUT SIGNAL.
Check voltage between time control unit
connector terminals
U35orU36and
ground.
NG
EOK
Door unlock sensor is OK

Page 978 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 2
(Door key cylinder switch check)
CHECK DOOR KEY CYLINDER SWITCH
INPUT SIGNAL (LOCK SIGNAL).
Check voltage between time control unit
connector terminal
U29and ground.
NG
EOK
Door

Page 979 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 3
(Door lock actuator check)
CHECK DOOR LOCK ACTUATOR CIR-
CUIT.
Check voltage for door lock actuator.
Before operating passenger side knob
lock switch, close all doors.
OK
ENG
Do

Page 980 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 4
(Super lock actuator check)
CHECK SUPER LOCK ACTUATOR CIRCUIT.
Check voltage for super lock actuator.
Note:
Put the system in set condition before check-
ing release signal.
OK

Page 981 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 5
(Door switch check)
CHECK DOOR SWITCH INPUT SIGNAL.
Check voltage between fuse block (J/B)
and ground.
NG
EOK
Door switch is OK.
CHECK DOOR SWITCH.
1) Disconnect door switch con

Page 982 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 6
(NATS release signal check)
Does engine start properly?
Ye s
ENo
Check NATS system.
CHECK NATS SIGNAL CIRCUIT.
1) Disconnect control unit connector and
NATS IMMU connector.
2) C

Page 983 of 1767

NISSAN TERRANO 2002  Service Repair Manual DIAGNOSTIC PROCEDURE 7
(Ignition switch check)
CHECK IGNITION SWITCH INPUT SIG-
NAL.
Check voltage between control unit termi-
nal
U22and ground.
NG
EOK
Ignition switch is OK.
CHECK IGNITION SWITCH PO

Page 984 of 1767

NISSAN TERRANO 2002  Service Repair Manual Schematic
YEL159D
MULTI-REMOTE CONTROL SYSTEM
EL-168