1994 JEEP CHEROKEE Service Repair Manual

Page 881 of 1784

JEEP CHEROKEE 1994  Service Repair Manual CLEANING
Clean the cylinder bores thoroughly. Apply a light
film of clean engine oil to the bores with a clean lint-
free cloth.
INSTALLATION
(1) Install the piston rings on the pistons if re-
moved.

Page 882 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (6) Remove the lower insert from the bearing cap.
(7) Remove the upper insert by LOOSENING (DO
NOT REMOVE) all of the other bearing caps. Now
insert a small cotter pin tool in the crankshaft jour-
nal

Page 883 of 1784

JEEP CHEROKEE 1994  Service Repair Manual BEARING-TO-JOURNAL CLEARANCE (CRANKSHAFT
INSTALLED)
When using Plastigage, check only one bearing
clearance at a time.
Install the grooved main bearings into the cylinder
block and the non-grooved bea

Page 884 of 1784

JEEP CHEROKEE 1994  Service Repair Manual MAIN BEARING FITTING CHART
J2.5L ENGINE 9 - 43

Page 885 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (6) Apply Loctite 515, or equivalent on the rear
bearing cap (Fig. 6). The bead should be 3 mm (0.125
in) thick. DO NOT apply Loctite 515, or equivalent
to the lip of the seal.
(7) Install the rear ma

Page 886 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (3) Install the flywheel or converter drive plate.
New bolts MUST be used when installing the fly-
wheel or converter plate. Tighten the new bolts to 68
Nzm (50 ft. lbs.) torque. Turn the bolts an add

Page 887 of 1784

JEEP CHEROKEE 1994  Service Repair Manual ²The feed holes for the crankshaft main bearings.
Once the block has been completely cleaned, apply
Loctite PST pipe sealant with Teflon 592 to the
threads of the front and rear oil galley plugs.
Tig

Page 888 of 1784

JEEP CHEROKEE 1994  Service Repair Manual SPECIFICATIONS
ENGINE SPECIFICATIONS
J2.5L ENGINE 9 - 47