1994 JEEP CHEROKEE Service Repair Manual

Page 1017 of 1784

JEEP CHEROKEE 1994  Service Repair Manual INSTALLATION
(1) Install the fuel injector(s) into the fuel rail as-
sembly and install retaining clip(s).
(2) Install fuel rail. Refer to Fuel Rail Installation
in this section.
(3) Start engine and

Page 1018 of 1784

JEEP CHEROKEE 1994  Service Repair Manual REMOVAL
(1) Disconnect the electrical connector from the
IAC motor.
(2) Remove IAC motor torx head mounting bolts.
(3) Remove IAC motor.
INSTALLATION
(1) Install IAC motor into throttle body and
tight

Page 1019 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (3) Lower the vehicle.
PARK NEUTRAL SWITCH
Refer to Group 21, Transmissions for park neutral
switch service.
POWER STEERING PRESSURE SWITCHÐ2.5L
ENGINE ONLY
The power steering pressure switch is inst

Page 1020 of 1784

JEEP CHEROKEE 1994  Service Repair Manual INSTALLATION
(1) After the PCM electrical connector has been
separated from the PCM, inspect the pins for corro-
sion, being spread apart, bent or misaligned. Also in-
spect the pin heights in the con

Page 1021 of 1784

JEEP CHEROKEE 1994  Service Repair Manual the sensor will not rotate, install the sensor with the
throttle shaft on the other side of the socket tangs).
The TPS will be under slight tension when rotated.
(1) Install the TPS and retaining bolt

Page 1022 of 1784

JEEP CHEROKEE 1994  Service Repair Manual (4) Remove the sensor (pull straight out) from the
speedometer pinion gear adapter (Fig. 23). Do not re-
move the gear adapter from the transmission.
INSTALLATION
(1) Clean the inside of speedometer p

Page 1023 of 1784

JEEP CHEROKEE 1994  Service Repair Manual SPECIFICATIONS
GENERAL INFORMATION
The following specifications are published from the
latest information available at the time of publica-
tion.If anything differs between the specifica-
tions found

Page 1024 of 1784

JEEP CHEROKEE 1994  Service Repair Manual PROPELLER SHAFTS
CONTENTS
page page
GENERAL INFORMATION.................. 1
PROPELLER SHAFT REPLACEMENT......... 7
SERVICE DIAGNOSIS/PROCEDURES......... 3TORQUE SPECIFICATIONS................ 14
UNIVE