1996 CHRYSLER VOYAGER Service Manual

Page 289 of 1938

CHRYSLER VOYAGER 1996  Service Manual CHARGING SYSTEM SCHEMATICÐTYPICAL
NSCHARGING SYSTEM 8C - 3
DIAGNOSIS AND TESTING (Continued)

Page 290 of 1938

CHRYSLER VOYAGER 1996  Service Manual CHARGING SYSTEM RESISTANCE TESTS
These tests will show the amount of voltage drop
across the generator output wire from the generator
output (B+) terminal to the battery positive post.
They will also

Page 291 of 1938

CHRYSLER VOYAGER 1996  Service Manual CHARGING SYSTEM TEST
NSCHARGING SYSTEM 8C - 5
DIAGNOSIS AND TESTING (Continued)

Page 292 of 1938

CHRYSLER VOYAGER 1996  Service Manual OVERCHARGE TEST
8C - 6 CHARGING SYSTEMNS
DIAGNOSIS AND TESTING (Continued)

Page 293 of 1938

CHRYSLER VOYAGER 1996  Service Manual TEST
(1) Perform the previous test Preparation.
(2) Fully engage the parking brake.
(3) Start engine.
(4) Bring engine speed to 2500 rpm.
(5) With engine speed held at 2500 rpm, slowly
adjust the rheo

Page 294 of 1938

CHRYSLER VOYAGER 1996  Service Manual VOLTAGE DROP TEST
8C - 8 CHARGING SYSTEMNS

Page 295 of 1938

CHRYSLER VOYAGER 1996  Service Manual REMOVAL AND INSTALLATION
GENERATORÐ2.4L ENGINE
REMOVAL
(1) Release hood latch and open hood.
(2) Disconnect battery negative cable (Fig. 3).
(3) Remove accessory drive belt, refer to Group 7,
Cooling

Page 296 of 1938

CHRYSLER VOYAGER 1996  Service Manual (4) Install bolt to hold bottom of generator to lower
pivot bracket.
(5) Install bolt to hold top of generator to mount
bracket.
(6) Install accessory drive belt, refer to Group 7,
Cooling System for