2000 DODGE NEON Service Repair Manual

Page 257 of 1285

DODGE NEON 2000  Service Repair Manual INSTRUMENT PANEL CENTER BEZEL
REMOVAL
(1) Remove HVAC control knobs from control head.
(2) Remove both center A/C outlet louvers (Fig. 14)
by rolling downward and pulling out.
(3) Remove two screws re

Page 258 of 1285

DODGE NEON 2000  Service Repair Manual STEERING COLUMN SHROUDS
REMOVAL
(1) Remove lower instrument panel cover. Refer to
Lower Instrument Panel Cover Removal and Instal-
lation in this section.
(2) Remove instrument cluster bezel. Refer to

Page 259 of 1285

DODGE NEON 2000  Service Repair Manual

Page 260 of 1285

DODGE NEON 2000  Service Repair Manual INSTRUMENT PANEL AND SYSTEMS
TABLE OF CONTENTS
page page
DIAGNOSIS AND TESTING
HEADLAMP LEVELING SWITCH..............1
INSTRUMENT PANEL AND COMPONENTS.....1
REMOVAL AND INSTALLATION
HEADLAMP LEVELING

Page 261 of 1285

DODGE NEON 2000  Service Repair Manual REMOVAL AND INSTALLATION
HEADLAMP LEVELING SWITCH
REMOVAL
(1) Rotate the A/C outlet registers to the full down
position. Grip each outlet at its outboard end and
gently over-rotate to release from its

Page 262 of 1285

DODGE NEON 2000  Service Repair Manual (5) Snap the center instrument bezel in position
and install the retaining screws (Fig. 5).
(6) Install the (4) HVAC control knobs.
(7) Install the A/C outlet registers on the center
instrument bezel

Page 263 of 1285

DODGE NEON 2000  Service Repair Manual (1) Disconnect the negative battery cable.
(2) Remove the floor console. Refer to Group 23,
Body for the procedure.
(3) Remove the right and left side instrument
panel end caps (Fig. 8). Using the fin

Page 264 of 1285

DODGE NEON 2000  Service Repair Manual (15) Rotate the A/C outlet registers to the full
down position. Grip each outlet at its outboard end
and gently over-rotate to release from its pivot point.
Swing outlet straight out and remove by han