Page 1301 of 1807
P04790
Seal Packing
2 mm
P02590
Z02733
14
14 13
1312
11
12
112
2 1
18
8 7
76
65
510
109
94
4 3
3
P02372SST
- ENGINE MECHANICAL (2JZ-GTE)CYLINDER HEAD
EM-49
1154 Author: Date:
1997 SUPRA (RM502U)
(h) Clean the installed surfaces of the No.1 bearing cap and
cylinder head with cleaner.
(i) Apply seal packing to the No.1 bearing cap as shown.
Seal packing: Part No. 08826-00080 or equivalent
(j) Install the No.1, No.2, No.4, No.5 and No.6 bearing caps
in their proper locations.
(k) Apply a light coat of engine oil on the threads and under
the heads of the bearing cap bolts.
(l) Install and uniformly tighten the 14 bearing cap bolts on
one side, in several passes, in the sequence shown.
Torque: 20 N´m (200 kgf´cm, 14 ft´lbf)
(m) Using SST, push the 2 oil seals in as far as they can go.
SST 09316-6001 1 (09316-00011, 09316-00051)
Page 1302 of 1807

P02694
P02695
120°120°
P02696
120°
120°
A02174
P03960
EM-50
- ENGINE MECHANICAL (2JZ-GTE)CYLINDER HEAD
1155 Author: Date:
1997 SUPRA (RM502U)
(n) Rotate the camshaft with a wrench at the hexagon posi-
tion, bring the forward straight pin up.
(o) Loosen the 12 bearing cap bolts as shown, until they can
be turned by hand; retighten, in several passes.
Torque: 20 N´m (200 kgf´cm, 14 ft´lbf)
(p) Turn the camshaft 1/3 of revolution.
(q) Loosen the 8 bearing cap bolts as shown, until they can
be turned by hand; retighten, in several passes.
Torque: 20 N´m (200 kgf´cm, 14 ft´lbf)
(r) Turn the camshaft a further 1/3 of a revolution.
(s) Loosen the 8 bearing cap bolts as shown, until they can
be turned by hand; retighten, in several passes.
Torque: 20 N´m (200 kgf´cm, 14 ft´lbf)
4. CHECK AND ADJUST VALVE CLEARANCE
(See page EM-4)
Turn the camshaft, and position the cam lobe upward, check
and adjust the valve clearance.
5. INSTALL NO.4 TIMING BELT COVER
Install the timing belt cover with 4 bolts.
Torque: 8.0 N´m (80 kgf´cm, 71 in.´lbf)
6. INSTALL CAMSHAFT TIMING PULLEYS
(a) Align the camshaft knock pin with the groove in the pulley,
and slide on the pulley.
(b) Temporarily install the timing pulley bolt.
Page 1303 of 1807

P02421
P11777
Seal Packing
P12290
Engine wire Bracket
- ENGINE MECHANICAL (2JZ-GTE)CYLINDER HEAD
EM-51
1156 Author: Date:
1997 SUPRA (RM502U)
(c) Hold the hexagon portion of the camshaft with a wrench,
and tighten the timing pulley bolt.
Torque: 81 N´m (810 kgf´cm, 60 ft´lbf)
7. INSTALL NO.1 AND NO.2 CYLINDER HEAD
COVERS
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the cylinder head as shown in the
illustration.
Seal packing: Part No. 08826-00080 or equivalent
(c) Install the gaskets to the No.1 and No.2 cylinder head
covers.
(d) Install the seal washers to the mounting bolts.
(e) Install the No.1 cylinder head cover with the 4 seal wash-
ers and 4 bolts.
Torque: 5.5 N´m (55 kgf´cm, 49 in.´lbf)
(f) Install the No.2 cylinder head cover with the 4 seal wash-
ers and 4 bolts.
Torque: 5.5 N´m (55 kgf´cm, 49 in.´lbf)
(g) Install the PCV valve.
(h) Install the cruise control actuator cable bracket and IAC
valve pipe clamp with the 2 bolts.
8. INSTALL SPARK PLUGS
9. INSTALL IGNITION COILS ASSEMBLIES
(See page IG-7)
10. INSTALL TIMING BELT (See page EM-21)
11. INSTALL INTAKE MANIFOLD AND DELIVERY PIPE
ASSEMBLY
Install a new gasket, the intake manifold, delivery pipe assem-
bly and engine wire bracket with the 4 bolts and 2 nuts.
Torque: 27 N´m (280 kgf´cm, 20 ft´lbf)
Page 1304 of 1807

P12114
EM-52
- ENGINE MECHANICAL (2JZ-GTE)CYLINDER HEAD
1157 Author: Date:
1997 SUPRA (RM502U)
12. INSTALL FUEL INLET PIPE
(a) Connect the fuel inlet pipe with 2 new gaskets and the
union bolt.
Torque: 42 N´m (420 kgf´cm, 30 ft´lbf)
(b) Install the clamp bolt to the intake manifold.
13. INSTALL FUEL PRESSURE PULSATION DAMPER
(See page SF-32)
14. INSTALL PRESSURE TANK AND VSV ASSEMBLY
Torque: 21 N´m (210 kgf´cm, 15 ft´lbf)
15. CONNECT ENGINE WIRE
(a) Install the engine wire protector to the intake manifold
with the nut.
(b) Install the 2 ground straps to the intake manifold with the
bolts.
(c) Connect these connectors and clamps:
VSV connector for EVAP
6 injectors connectors
HINT:
The No.1, No.3 and No.5 injector connectors are dark gray, and
the No.2, No.4 and No.6 injector connectors are gray.
2 camshaft position sensor connectors
3 engine wire clamps to injector holders
16. INSTALL AIR INTAKE CHAMBER ASSEMBLY
(See page SF-29)
17. CONNECT FUEL RETURN HOSE
18. INSTALL PS PUMP
Torque: 58 N´m (590 kgf´cm, 43 ft´lbf)
19. INSTALL NO.1 WATER BYPASS PIPE AND
WATER OUTLET
(a) Install 2 new O-rings to the No.1 water bypass pipe.
(b) Apply soapy water to the O-rings.
(c) Install the No.1 water bypass pipe to the water pump.
(d) Install a new gasket and the water outlet with the 2 bolts.
Torque: 21 N´m (210 kgf´cm, 15 ft´lbf)
(e) Connect the ECT sensor and sender gauge connectors.
(f) Connect the upper radiator hose to the water outlet.
20. INSTALL DRIVE BELT
Install the drive belt by turning the drive belt tensioner clock-
wise.
21. M/T:
INSTALL DRIVE BELT TENSIONER DAMPER
(See page EM-21)
Page 1305 of 1807
P11927
New
GasketNew
Gasket Protrusion
Z09290
14
8 11
12
109
7
1
2
46 3
5 13
- ENGINE MECHANICAL (2JZ-GTE)CYLINDER HEAD
EM-53
1158 Author: Date:
1997 SUPRA (RM502U)
22. INSTALL EXHAUST MANIFOLD
(a) Place 2 new gaskets to the cylinder head facing the pro-
trusion as shown.
(b) Install the exhaust manifold with 12 new nuts, in several
passes, in the sequence shown.
Torque: 39 N´m (400 kgf´cm, 29 ft´lbf)
23. INSTALL TURBOCHARGER (See page TC-20)
Page 1316 of 1807

P13212
Z16756
M/T
Matchmarks
Z16731
Hole Plug EM-64
- ENGINE MECHANICAL (2JZ-GTE)ENGINE UNIT
1169 Author: Date:
1997 SUPRA (RM502U)
(c) Lift the engine out of the vehicle slowly and carefully.
NOTICE:
Remove the engine and transmission assembly carefully
without damaging the shift lever retainer (M/T), A/C com-
pressor or PS solenoid valve.
(d) Make sure the engine is clear of all wiring, hoses and
cables.
(e) Place the engine and transmission assembly onto the
stand.
34. A/T:
REMOVE OIL DIPSTICK AND GUIDE FOR
TRANSMISSION
(a) Remove the bolt.
(b) Pull out the dipstick and guide from the transmission.
(c) Remove the O-ring from the dipstick guide.
35. DISCONNECT ENGINE WIRE FROM TRANSMISSION
(a) Disconnect the connectors.
(b) Disconnect the wire clamps from the brackets.
36. REMOVE STARTER
(a) Disconnect the starter connector.
(b) Remove the 2 bolts, wire bracket and starter.
37. A/T:
REMOVE OIL COOLER TUBES FOR
TRANSMISSION
(a) Remove the 2 hose clamp bolts and tube clamp bolt.
(b) Loosen the 2 union nuts, and remove the oil cooler tubes.
38. M/T:
REMOVE CLUTCH COVER SET BOLTS
(a) Remove the 2 bolts and service hole cover.
(b) Place the matchmarks on the flywheel and clutch cover.
(c) Remove the 6 bolts.
39. A/T:
REMOVE TORQUE CONVERTER CLUTCH
MOUNTING BOLTS
(a) Remove the hole plug.
(b) Turn the crankshaft to gain access to each bolt. Remove
the 6 bolts.
40. SEPARATE ENGINE AND TRANSMISSION
Remove the 6 bolts and transmission.
Page 1317 of 1807

Z16735
A/T
EM0AW-03
Z09545
M/T
A/T
P13200
P13202
Z16756
M/T
Matchmarks
- ENGINE MECHANICAL (2JZ-GTE)ENGINE UNIT
EM-65
1170 Author: Date:
1997 SUPRA (RM502U)
INSTALLATION
1. A/T:
CHECK TORQUE CONVERTER CLUTCH
INSTALLATION
Using calipers and straight edge, measure from the installed
surface of the torque converter clutch to the front surface of the
transmission.
Correct distance: Less than 0.1 mm (0.004 in.)
If the distance is not as specified, check for an improper installa-
tion.
2. ASSEMBLE ENGINE AND TRANSMISSION
(a) M/T:
Align the input spline with the clutch disc and install the
transmission to the engine.
(b) Align the 2 knock pins on the cylinder block with the pin
holes of the clutch housing.
(c) Install the transmission with the 6 bolts.
Torque:
14 mm head 39 N´m (400 kgf´cm, 29 ft´lbf)
17 mm head 72 N´m (730 kgf´cm, 43 ft´lbf)
3. M/T:
INSTALL CLUTCH COVER SET BOLTS
(a) Align the matchmarks.
(b) Install the 6 bolts while turning the crankshaft to gain ac-
cess. Tighten the bolts evenly.
Torque: 19 N´m (195 kgf´cm, 14 ft´lbf)
(c) Install the service hole cover with the 2 bolts.
Torque: 12 N´m (120 kgf´cm, 9 ft´lbf)
Page 1318 of 1807

Z16731
Hole Plug A/T
P11499
P11500
EM-66
- ENGINE MECHANICAL (2JZ-GTE)ENGINE UNIT
1171 Author: Date:
1997 SUPRA (RM502U)
4. A/T:
INSTALL TORQUE CONVERTER CLUTCH MOUNTING
BOLTS
(a) First, install the gray bolt. Then install 5 black bolts while
turning the crankshaft to gain access. Tighten the bolts
evenly.
Torque: 33 N´m (340 kgf´cm, 25 ft´lbf)
(b) Install the hole plug.
5. A/T:
INSTALL OIL COOLER PIPE FOR
TRANSMISSION
(a) Temporarily install the 2 oil cooler pipe, 2 hose clamps
and tube clamp with 3 clamp bolts.
(b) Connect the 2 oil cooler tubes to the unions on the trans-
mission. Tighten the union nuts.
Torque:44 N´m (450 kgf´cm, 33 ft´lbf)
(c) Tighten the 3 clamp bolts.
6. INSTALL STARTER
7. CONNECT ENGINE WIRE TO TRANSMISSION
8. A/T:
INSTALL OIL DIPSTICK AND GUIDE FOR
TRANSMISSION
(a) Install a new O-ring to the dipstick guide.
(b) Connect the dipstick guide end to the dipstick tube of the
oil pan.
(c) Install the dipstick guide with the bolt.
(d) Install the dipstick.
9. INSTALL ENGINE AND TRANSMISSION ASSEMBLY
IN VEHICLE
(a) Attach the engine hoist chain to the engine hangers.
(b) Lower the engine and transmission assembly into the en-
gine compartment.
NOTICE:
Install the engine and transmission assembly carefully
without damaging the shift lever retainer (M/T), A/C com-
pressor and PS solenoid valve.
(c) Insert the stud bolts of the front engine mounting insula-
tors into the stud bolt holes of the front suspension cross-
member.
(d) Temporarily install the 2 nuts holding the engine front
mounting insulators to the front suspension crossmem-
ber.
(e) Keep the engine level with a jack.
(f) Remove the hoist chain.