1986 TOYOTA CAMRY V20 torque

[x] Cancel search: torque

Page 2037 of 2389

TOYOTA CAMRY V20 1986  Service Information 32. INSTALL LOCK NUT
(a) Engage the gear double meshing.
(b) Install and torque the lock nut.
Torque: 1,250 kg±cm (90 ft±Ib, 123 N±n)
(c) Disengage the gear double meshing.
(d) Stake the lock nut.

Page 2038 of 2389

TOYOTA CAMRY V20 1986  Service Information 33. INSTALL TRANSMISSION CASE COVER
(a) Remove any packing material and be careful not to drop oil on
the contacting surfaces of the transmission case cover.
(b) Apply seal packing to the transmission

Page 2073 of 2389

TOYOTA CAMRY V20 1986  Service Information 5. IF NECESSARY, REPLACE OUTPUT SHAFT FRONT
BEARING OUTER RACE AND OUTPUT SHAFT COVER
(a) Using SST, pull out the outer race.
SST 09308±00010 .
(b) Remove the output shaft cover.
7. IF NECESSARY, REP

Page 2078 of 2389

TOYOTA CAMRY V20 1986  Service Information 2. INSTALL OIL PUMP COVER
(a) Install the relief valve seat, ball, spring and spring hold-
er to the oil pump case.
3. INSTALL OIL STRAINER
Install the oil strainer to the oil pump case, temporarily
i

Page 2096 of 2389

TOYOTA CAMRY V20 1986  Service Information (f) Remove the sixteen bolts and differential No.2
case up ward.
(g) Measure the Plastigauge at its widest point.
Standard clearance: 0.155 ± 0.250 mm
(0.0061 ± 0.0098 in.)
HINT: Referring to the ta

Page 2097 of 2389

TOYOTA CAMRY V20 1986  Service Information 12. INSTALL TRANSMISSION CASE
(a) Install the transmission case.
HINT: If necessary, tap on the case with a plastic ham-
mer.
(b) Install and torque the seventeen bolts.
Torque: 300 kg±cm (22 ft±Ib,

Page 2099 of 2389

TOYOTA CAMRY V20 1986  Service Information INSTALLATION OF COMPONENT
PARTS
(See pages MT±118 to MT±120)
HINT: Coat all of the sliding and rotating surface with
gear oil before assembly.
1. ADJUST OUTPUT SHAFT PRELOAD
(a) Install the output s

Page 2100 of 2389

TOYOTA CAMRY V20 1986  Service Information (g) Install the new lock nut to the output shaft.
(h) Turn the output shaft counterclockwise and clockwise
several times.
(i) Using a torque meter, measure the preload of the out-
put shaft.
Preload (