1986 TOYOTA CAMRY V20 battery

[x] Cancel search: battery

Page 1082 of 2389

TOYOTA CAMRY V20 1986  Service Information There is no voltage between ECU terminal No. 10, No. 20
and/or No. 30 and E41 and/or E02. (IG SW ON)
Check that there is voltage between ECU terminal No. 10,
No. 20 or No. 30 and body ground.
Check wi

Page 1085 of 2389

TOYOTA CAMRY V20 1986  Service Information Check that there is voltage at STA (50) terminal of starter.
(IG SW START) STD voltage: 6 ± 14 VThere is no voltage between ECU terminals STA and El.
(IG SW START)
Check wiring between ECU terminal E

Page 1086 of 2389

TOYOTA CAMRY V20 1986  Service Information Check that there is voltage between ECU terminal IGT and body
ground. (idling) There is no voltage between ECU terminals IGT and El.
(idling)
Check wiring between ECU and
battery.Check fusible link an

Page 1092 of 2389

TOYOTA CAMRY V20 1986  Service Information ON±VEHICLE INSPECTION
INSPECT RESISTANCE OF COLD START INJECTOR
(a) Disconnect the cold start injector connector.
(b) Using an ohmmeter, measure the resistance between
the terminals.
Resistance: 2 ±

Page 1093 of 2389

TOYOTA CAMRY V20 1986  Service Information INSPECTION OF COLD START
INJECTOR
1. INSPECT INJECTION OF COLD START INJECTOR
NOTICE: Keep clear for sparks during the test.
(a) Install SST (two unions) to the injector and delivery
pipe with new gas

Page 1094 of 2389

TOYOTA CAMRY V20 1986  Service Information INSTALLATION OF COLD START INJECTOR
1. INSTALL COLD START INJECTOR
Install a new gasket and the injector with the two bolts.
Torque: 95 kg±cm (82 in.±Ib, 9.3 N±m)
3. CONNECT COLD START INJECTOR CON

Page 1095 of 2389

TOYOTA CAMRY V20 1986  Service Information ON±VEHICLE INSPECTION
INSPECT RESISTANCE OF COLD START INJECTOR
(a) Disconnect the cold start injector connector.
(b) Using an ohmmeter, measure the resistance between the
terminals.
Resistance:  2

Page 1096 of 2389

TOYOTA CAMRY V20 1986  Service Information INSPECTION OF COLD START
INJECTOR
1. INSPECT INJECTION OF COLD START INJECTOR
NOTICE: Keep clear for sparks during the test.
(a) Install SST (two unions) to the injector and delivery pipe with
new gas