1995 TOYOTA SUPRA engine

[x] Cancel search: engine

Page 1333 of 2543

TOYOTA SUPRA 1995  Service Repair Manual 3.  CHECK IDLE SPEED
(a)  Race the engine speed at 2,500 rpm for approx. 90 seconds.
(b)  Check the idle speed.
Idle speed:
700 + 50 rpm
4.  ADJUST IGNITION TIMING
(a)  Using SST, connect terminals TE

Page 1334 of 2543

TOYOTA SUPRA 1995  Service Repair Manual IGNITION TIMING INSPECTION
(2JZ±GTE)
1.  WARM UP ENGINE
Allow the engine to warm up to normal operating tempera-
ture.
2.  CONNECT TACHOMETER AND TIMING LIGHT
(See step 2 in ignition timing inspectio

Page 1335 of 2543

TOYOTA SUPRA 1995  Service Repair Manual (d)  Using a timing light, check the ignition timing.
Ignition  timing:
10 + 25 BTDC @ idle
(Transmission in neutral position)
If the ignition timing is not as specified, check the valve tim-
ing. (Se

Page 1336 of 2543

TOYOTA SUPRA 1995  Service Repair Manual TIMING BELT
COMPONENTS FOR REMOVAL AND
INSTALLATION
EG±22± ENGINEENGINE MECHANICAL

Page 1337 of 2543

TOYOTA SUPRA 1995  Service Repair Manual ± ENGINEENGINE MECHANICALEG±23

Page 1338 of 2543

TOYOTA SUPRA 1995  Service Repair Manual TIMING BELT REMOVAL
1. REMOVE RADIATOR ASSEMBLY
(See radiator removal in Cooling System)
2. 2JZ±GTE M/T:
REMOVE DRIVE BELT TENSIONER DAMPER
Remove the 2 nuts and tensioner damper.
3.  REMOVE DRIVE BE

Page 1339 of 2543

TOYOTA SUPRA 1995  Service Repair Manual 7.  SET NO.1 CYLINDER TO TDC/COMPRESSION
(a)  Turn the crankshaft pulley, and align its groove with timing
mark ºOº of the No.1 timing belt cover.
NOTICE: Always turn the crankshaft clockwise.
(b)

Page 1340 of 2543

TOYOTA SUPRA 1995  Service Repair Manual 9.  REMOVE CAMSHAFT TIMING PULLEYS
Using SST, remove the pulley bolt. Remove the 2 timing pul-
leys.
SST 09960±10010 (09962±01000, 09963±01000)
10. A/T:
DISCONNECT OIL COOLER TUBES
Remove the 2 bol