1995 ACURA TL torque

[x] Cancel search: torque

Page 689 of 1771

ACURA TL 1995  Service Repair Manual 
Service Precautions

Handling of Special Nuts and Bolts

Because the front sub frame sections on this vehicle are

constructed with aluminum alloys, use only the special

"Dacro" type nuts an

Page 727 of 1771

ACURA TL 1995  Service Repair Manual 
44. Disconnect the vacuum hoses, then remove the front

engine mounts.

VACUUM

HOSE 
FRONT

ENGINE

MOUNT

45. Slowly raise the hoist up a little.

46. Remove the mid mounts.

MID MOUNT SPACER

MID

Page 757 of 1771

ACURA TL 1995  Service Repair Manual 
Camshaft

Inspection

NOTE:

• Do not rotate the camshaft during inspection.

• Remove the rocker arms and rocker shafts.

1. Put the camshaft and the camshaft holders on the

cylinder head, then

Page 771 of 1771

ACURA TL 1995  Service Repair Manual 
4. Tighten each bolt two turns at a time in the sequence

shown below to ensure that the rockers do not bind

on the valves.

Specified torque:

8 mm bolts: 22 N-m (2.2 kgf-m, 16 Ibf-ft)

Apply engin

Page 773 of 1771

ACURA TL 1995  Service Repair Manual Cylinder Hea d
Installatio n (cont'd )
3. Tur n th e camshaf t unti l it s keywa y i s facin g u p (No . 1
pisto n TDC) .
4 . Torqu e th e cylinde r hea d bolt s sequentiall y i n thre e
steps .
1

Page 775 of 1771

ACURA TL 1995  Service Repair Manual 
Cylinder Head

Installation (cont'd)

14. Apply liquid gasket to the head cover gasket at the

four corners of the recesses.

NOTE:

• Use liquid gasket. Part No. 08718 - 0001 or 08718

- 0003.

Page 781 of 1771

ACURA TL 1995  Service Repair Manual 
Main Bearings

Clearance

1. To check main bearing-to-journal oil clearance,

remove the main caps and bearing halves.

2. Clean each main journal and bearing half with a

clean shop towel.

3. Place

Page 784 of 1771

ACURA TL 1995  Service Repair Manual 
Connecting Rod Bearings

Clearance

1. Remove the connecting rod cap and bearing half.

2. Clean the crankshaft rod journal and bearing half

with a clean shop towel.

3. Place the plastigage across