2016 NISSAN NOTE fuel pump

[x] Cancel search: fuel pump

Page 1205 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-78
< ECU DIAGNOSIS INFORMATION >[HR16DE]
ECM
15
(G/W) 108
(B) Throttle control motor relay Output [Ignition switch: OFF]
BATTERY VOLTAGE
(11 - 14 V) 
[Ignition switch: ON] 0 - 1.0 V
17
(V)
108(B) I

Page 1264 of 3641

NISSAN NOTE 2016  Service Repair Manual FUEL PRESSURE CHECKEC-137
< BASIC INSPECTION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
FUEL PRESSURE CHECK
Work ProcedureINFOID:0000000012431363
FUEL PRESSURE RELEASE
1.FUEL PRESSURE RELEASE
With CON

Page 1265 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-138
< BASIC INSPECTION >[HR16DE]
FUEL PRESSURE CHECK
4. Connect fuel hose for fuel pressure check (1) to fuel tube
(engine side) with clamp (2) as shown in the figure.
CAUTION:
• Wipe off oil or

Page 1281 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-154
< DTC/CIRCUIT DIAGNOSIS >[HR16DE]
TROUBLE DIAGNOSIS - SPECIFICATION VALUE
NOTE:
Check “A/F ALPHA-B1” for approximately 1 minute because 
it may fluctuate. It is NG if the indication is
out

Page 1377 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-250
< DTC/CIRCUIT DIAGNOSIS >[HR16DE]
P0171 FUEL INJECTION SYSTEM FUNCTION
6. Also check harness for short to power.
Is the inspection result normal?
YES >> GO TO 4.
NO >> Repair open circuit or sh

Page 1381 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-254
< DTC/CIRCUIT DIAGNOSIS >[HR16DE]
P0172 FUEL INJECTION SYSTEM FUNCTION
6. Also check harness for short to power.
Is the inspection result normal?
YES >> GO TO 4.
NO >> Repair open circuit or sh

Page 1384 of 3641

NISSAN NOTE 2016  Service Repair Manual P0181 FTT SENSOREC-257
< DTC/CIRCUIT DIAGNOSIS > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2. Wait at least 10 seconds.
3. Check 1st trip DTC.
With GST
Follow the procedure “With CONSULT” above.
Is

Page 1385 of 3641

NISSAN NOTE 2016  Service Repair Manual EC-258
< DTC/CIRCUIT DIAGNOSIS >[HR16DE]
P0181 FTT SENSOR
4. Check resistance between fuel level sensor unit and fuel pump
terminals by heating with hot water as shown in the figure.
Is the inspection
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 72 next >