Page 89 of 933
E7J-A-2/60 ENGINE16
16 - 7
ST ARTING AND CHARGING
IDENTIFICATION
ENGINE STARTER
E7J - A-2/60 D 907 - M00 2T 13581
DIAGNOS TICATION
S pecial device: CLIP - SAGEM-TECHNIC TESTER which measures the battery
voltage and the intensity absorbed by the starter.
ANOMALOUS FUNCTIONING THAT CAN BE SETTLED
-Battery failure –contact drop on the starter when starting the engine.
-Blocked starter (t he absorbed curre nt is very high);
Coupling relay defect (the current absorbed is very weak).
In order to do the measurements one must carry t he engine in starter mode, thus pre -
venting the engine to run.
To do t hat, the revolution sensor (located in the c lutch cra nkcase) should be t aken apart .
Remark: After doing these tests, erase the possible defects memorized
by the calculator with the tester.
STA RTER
vnx.su
Page 90 of 933
16E7J-A-2/60 ENGINE
16 - 8
ST ARTING AND CHARGING
DIS M O UNT ING
The car is put on a two-column lifting stand;
The battery of storage cells is disconnected;
The screw-nuts fixing the degassing vessel are taken apart.
The degassing vessel is re moved (without disconnecting the link conduits) to the fore
part of the car i n order to facilitate access to the screws fixing the starter; The screws fixing the command bar on the connecting rod of the gearbox are taken off
(the jack is retrieved);
The screws no. 1 fixing the start er are taken;
STA RTER
The car is suspended;
The electric connectors of the starter are disconnected;
The start er is taken out through the bottom of the engine compartment. R
E-MOUNT ING
The taking-apart opera tions are done in the reverse order.
The screws are tightened at a 4.4 daNm couple.
vnx.su
Page 91 of 933

E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 1
S
TATIC IG NIT IO N
PRE S E NT
AT IO N
The system is made up of:
- electronic control unit;
- double ignition coil;
- four sparking plugs;
- spark plugs.
DES CRIPT IO N OF FUNCT IO NING PRINCI PL E
Accordi ng to the data received from
various sensors, but essentially according
to the revolution ratio and the load of t he
engine, the electronic control uni t will de-
termine the ignition advance; it will also
identify the cylinders that are set at the
upper center point and, consequently, will
command the re spective coil. This c auses the spark at the level of the
two cylinders t hat are at the upper center
point, thus interrupting the m ass-setting of
the respective coil. T
HE CO IL
The system c ontains a doubl e c oil, con-
trolled by the calculator.
Coil no. 2 has an electric connector (1) with
four ways, whi ch si m ultaneousl y produc e
s parks at cylinders nos. 1 and 4, when it i s
commanded by pin no. 32 of the i njection cal-
culator, and on cylinders no. 2 and 3 when it
is commanded by pi n no. 1 of the same cal-
culator.
ELECTRIC CONNECTOR
Pins Function
AC ommands ignition at
cylinders nos. 1 and 4
BC ommands ignition at
cy linders nos. 2 and
CFuel supply (+DC)
inter - pin Rezistena
check între pini
A-B 1 W
A-C 0,5 W
B-C0,5 W
HT - HT 11 KW
IGNITION SYSTEM
vnx.su
Page 92 of 933
E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 2
EngineMakeType
E7J - A-2/60 EYQUEM RFN 58 LZ CHAMPION RC 10 PYC
Distance between electrodes: 0,9 mm
Tightening couple: 2,5 - 3 daNm
Plane stool with fitting
SPARKING PLUGS
vnx.su
Page 93 of 933
E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 3
I N J E C T I O N S Y S T E M
Peculiariti es of the multi-point system
90-pin calculator made by SIEMENS.
Multi-poi nt sequential injection. It commands an injector at a time, in turns.
S tatic ignition with double ignition coil.
Canister-dra ining valve controlled in a cyclical relation to the opening.
Correction of idle mode system in keeping with: -air-conditioning (AC);
-battery vol tage.
On -board injection light indicator;
Maximal load / regimen:
-6200 rot/min for gears: I, II, and III;
-6000 rot/min for gears: IV and V. PECULIARITIES
vnx.su
Page 94 of 933
E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 4
PLAC ING OF ELEMENTS
1.Can
ister-draining valve;
2. Air -filter;
3. Det onation sensor (tightening couple: 2.5 daNm);
4. Atmo spheric air-pressure sensor;
5. Step-by -step idle mode-adjustment engine;
6. Cla pper position potentiometer;
7. Air- temperature sensor;
8. Inje ction calcul ator;
9. Shock-s ensor;
10. Fuse-and- relay box;
11. Revolution sensor;
12. Water- temperature sensor;
13. Oxyg en sensor (tightening couple: 4.5 daNm);
14. Igniti on coil;
15. Carbon canister.
1 14 3 5 6 7 4 2 11
9
10
15 13 \
12 8
PLACING OF ELEMENTS
vnx.su
Page 95 of 933
E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 5
8. Injection calculator;
9. Shock-sensor;10. Revoluti on sensor;
11. Water-temperature sensor.
9
8
1
11
The fo
llowing relays can be identified in the fuse-box;
B = M otor-ventilator group relay (with Air-Conditioning)
H = Fuel-pump relay
C = Motor-ventilator group relay (without AC).
PLACING OF ELEMENTS
vnx.su
Page 96 of 933

E7J-A-2/60 ENGINE17
IGNITION AND INJECTION
17 - 6
The water - temperature sensor
This sensor (no.1) sends the inform ation concerning t he water t emperature to t he c alcu-
lator, and ot her i nformation is sent t o the on-board indicator, which will di splay water
temperature . In case of emergency regarding water t emperature , the calculator will command the
lighting of the water-tempera ture alert indicator on the board. In keeping with the water-temperature information received by the calculator, it will
command:
-the injection system;
-the relays for the command of the motor-ve ntilator e ngine cooling group.
When setting the contact on, the water tempera ture indicator, placed on the instrument
panel, shall be lighted for 3 seconds then it shall turn off.
1
So, after setting the contact off, during next 2 minutes from engine stopping, the water
temperature reaches the value of 102 C and the injection computer is then control ling the
cooling blower starting at low speed. When the tempera ture is lowering at 96 C, the blower will be stopped ; its operation
must not be over 10 minutes after engine stopping. PLACING OF ELEMENTS
vnx.su