Page 1356 of 1807

P02103
P02175Protrusion
Z16755
M/T
Z16757
M/T EM-20
- ENGINE MECHANICAL (2JZ-GTE)TIMING BELT
1125 Author: Date:
1997 SUPRA (RM502U)
(b) Hold the tensioner with both hands and push the push rod
strongly against the floor or wall to check that it doesn't
move.
If the push rod moves, replace the tensioner.
(c) Measure the protrusion of the push rod from the housing
end.
Protrusion: 8.0 - 8.8 mm (0.315 - 0.346 in.)
If the protrusion is not as specified, replace the tensioner.
4. M/T:
INSPECT DRIVE BELT TENSION DAMPER
Compress and extend the tension damper rod and check that
there is no abnormal resistance or unusual operation sounds.
If there is any abnormality, replace the tension damper with a
new one.
NOTICE:
When discarding the tension damper, use the following
procedure.
Fully extend the damper rod.
Using a drill, make a hole in the cylinder as shown to
release the gas inside.
CAUTION:
The gas coming out is harmless, but be careful of the chips
which may fly up when drilling.
Page 1358 of 1807

P11944
P11593
A02561
P10712
3
5
EX
IN3
5
11
11 22 44
P10711
46
EX
IN46
22
3355
66
- ENGINE MECHANICAL (2JZ-GTE)VALVE CLEARANCE
EM-5
111 0 Author: Date:
1997 SUPRA (RM502U)
(d) Remove the 6 bolts, 2 nuts, 8 seal washers, No.1 cylinder
head cover and gasket.
(e) Remove the 6 bolts, 2 nuts, 8 seal washers, No.2 cylinder
head cover and gasket.
6. SET NO.1 CYLINDER TO TDC/COMPRESSIO
(a) Turn the crankshaft pulley, and align its groove with timing
mark º0º of the No.1 timing belt cover.
NOTICE:
Always turn the crankshaft clockwise.
(b) Check that the timing marks of the camshaft timing pul-
leys are aligned with the timing marks of the No.4 timing
belt cover.
If not, turn the crankshaft 1 revolution (360°).
7. INSPECT VALVE CLEARANCE
(a) Check only those valves indicated in the illustration.
Using a feeler gauge, measure the clearance be-
tween the valve lifter and camshaft.
Record the valve clearance measurements of those
that are out of specification. They will be used later
to determine the required replacement adjusting
shim.
Valve clearance (Cold):
Intake 0.15 - 0.25 mm (0.006 - 0.010 in.)
Exhaust 0.25 - 0.35 mm (0.010 - 0.014 in.)
(b) Turn the crankshaft pulley 1 revolution (360°), and align
the groove with timing mark º0º of the No.1 timing belt cov-
er.
(c) Check only the valves indicated as shown. Measure the
valve clearance. (See procedure in step (a))
Page 1360 of 1807

EM0494
P11926
SST (B)
SST (A)
P11777
Seal Packing
- ENGINE MECHANICAL (2JZ-GTE)VALVE CLEARANCE
EM-7
111 2 Author: Date:
1997 SUPRA (RM502U)
(b) Determine the replacement adjusting shim size according
to the following Formula or Charts:
Using a micrometer, measure the thickness of the
removed shim.
Calculate the thickness of a new shim so the valve
clearance comes within specified value.
T .......... Thickness of used shim
A .......... Measured valve clearance
N .......... Thickness of new shim
Intake
N = T + (A - 0.20 mm (0.008 in.))
Exhaust
N = T + (A - 0.30 mm (0.012 in.))
Select a new shim with a thickness as close as pos-
sible to the calculated values.
HINT:
Shims are available in 17 sizes in increments of 0.050 mm
(0.0020 in.), from 2.500 mm (0.0984 in.) to 3.300 mm (0.1299
in.).
(c) Install a new adjusting shim.
Place a new adjusting shim on the valve lifter, with
imprinted numbers facing down.
Press down the valve lifter with SST (A), and re-
move SST (B).
SST 09248-55040
(d) Recheck the valve clearance.
9. REINSTALL NO.1 AND NO.2 CYLINDER HEAD COV-
ERS
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the cylinder head as shown in the
illustration.
Seal packing:
Part No. 08826-00080 or equivalent
(c) Install the gaskets to the No.1 and No.2 cylinder head
covers.
(d) Install the 12 seal washers to the bolts.
(e) Install the No.2 cylinder head cover with the 6 bolts, 4 seal
washers and 4 nuts..
Torque: 5.4 N´m (55 kgf´cm, 48 in.´lbf)
(f) Install the No.1 cylinder head cover with the 6 bolts, 4 seal
washers and 4 nuts..
Torque: 5.4 N´m (55 kgf´cm, 48 in.´lbf)
(g) Connect the 2 PCV hoses to the cylinder head covers.
(h) Install the bolt holding the VSV to the turbo outlet duct.
(i) Connect the cruise control actuator cable to the cable
bracket.
Page 1364 of 1807

EM0AF-02
A02173
Sensor
Inward
Part
P18867
A02168
10 mm
Hexagon WrenchAdhesive
A02171
A02172
- ENGINE MECHANICAL (2JZ-GTE)TIMING BELT
EM-21
1126 Author: Date:
1997 SUPRA (RM502U)
INSTALLATION
1. INSTALL CRANKSHAFT TIMING PULLEY
(a) Align the pulley set key with the key groove of the pulley.
(b) Slide on the timing pulley facing the flange side inward.
NOTICE:
Do not scratch the sensor part of the crankshaft timing
pulley.
(c) Install the timing belt plate with the bolt.
Torque: 7.8 N´m (80 kgf´cm, 69 in.´lbf)
2. INSTALL IDLER PULLEY
(a) Apply adhesive to 2 or 3 threads of the pivot bolt.
Adhesive:
Part No. 08833-00080, THREE BOND 1344,
LOCTITE 242 or equivalent
(b) Using a 10 mm hexagon wrench, install the plate washer
and pulley with the pivot bolt.
Torque: 35 N´m (350 kgf´cm, 26 ft´lbf)
(c) Check that the pulley bracket moves smoothly.
3. TEMPORARILY INSTALL TIMING BELT
NOTICE:
The engine should be cold.
(a) Using the crankshaft pulley bolt, turn the crankshaft, and
align the timing marks on the crankshaft timing pulley and
on the oil pump body.
(b) Remove any oil or water on the crankshaft timing pulley
and idler pulley, and keep them clean.
(c) Install the timing belt on the crankshaft timing pulley and
idler pulley.
HINT:
(When re-using timing belt):
Align the match marks of the crankshaft timing pulley and timing
belt, and install the belt with the arrow pointing in the direction
of engine revolution.
Page 1366 of 1807

A02558SST
A02562
Z02446
1.5 mm
Hexagon
Wrench
P04459
P11756
- ENGINE MECHANICAL (2JZ-GTE)TIMING BELT
EM-23
1128 Author: Date:
1997 SUPRA (RM502U)
(b) Using SST, align the timing marks of the camshaft timing
pulleys and No.4 timing belt cover.
SST 09960-10010 (09962-01000, 09963-01000)
10. INSTALL TIMING BELT
HINT:
(When re-using timing belt):
Align the matchmarks of the timing belt and camshaft timing
pulleys.
(a) Remove any oil or water on the camshaft timing pulley,
and keep it clean.
(b) Install the timing belt, checking the tension between the
crankshaft timing pulley and exhaust camshaft timing
pulley.
11. SET TIMING BELT TENSIONER
(a) Using a press, slowly press in the push rod using 981 -
9,807 N (100 - 1,000 kgf, 220 - 2,205 lbf) of force.
(b) Align the holes of the push rod and housing, pass a 1.5
mm hexagon wrench through the holes to keep the push
rod retracted.
(c) Release the press.
(d) Install the dust boot onto the tensioner.
12. INSTALL TIMING BELT TENSIONER
(a) Temporarily install the tensioner with the 2 bolts.
(b) Alternately tighten the 2 bolts.
Torque: 26 N´m (270 kgf´cm, 20 ft´lbf)
Page 1367 of 1807

P02587
P02154
P11647
S00259
SST
A
BA EM-24
- ENGINE MECHANICAL (2JZ-GTE)TIMING BELT
1129 Author: Date:
1997 SUPRA (RM502U)
(c) Remove the 1.5 mm hexagon wrench from the tensioner.
13. CHECK VALVE TIMING
(a) Slowly turn the crankshaft pulley 2 revolutions from TDC
to TDC.
NOTICE:
Always turn the crankshaft clockwise.
(b) Check that each pulley aligns with the timing marks as
shown in the illustration.
If the marks do not align, remove the timing belt and reinstall it.
14. INSTALL DRIVE BELT TENSIONER
Install the tensioner with the 3 bolts.
Torque: 21 N´m (210 kgf´cm, 15 ft´lbf)
NOTICE:
Be careful not to drop the bolts inside the timing belt cover.
15. INSTALL NO.2 TIMING BELT COVER
16. INSTALL NO.3 TIMING BELT COVER
17. INSTALL PS PUMP
(a) Temporarily install the pump pulley with the nut.
(b) Using SST, tighten the pulley nut.
SST 09960-10010 (09962-01000, 09963-01000)
Torque: 43 N´m (440 kgf´cm, 32 ft´lbf)
18. INSTALL WATER PUMP PULLEY, FAN, FLUID
COUPLING ASSEMBLY AND DRIVE BELT
(See page CO-1 1)
19. M/T:
INSTALL DRIVE BELT TENSIONER DAMPER
Torque: 20 N´m (200 kgf´cm, 14 ft´lbf)
20. INSTALL RADIATOR ASSEMBLY
(See page CO-28)
21. ROAD TEST
Check for abnormal noise, shock, slippage, correct shift points
and smooth operation.
Page 1368 of 1807

B00319
Recommended Viscosity (SAE):
TEMPERATURE RANGE ANTICIPATED BEFORE NEXT OIL CHANGE °F
°C-20
-29 0
-1820
-740
460
1680
27100
38 10W-30
5W-30 PREFERRED
2JZ-GE
Z09522
Recommended Viscosity (SAE):
10W - 30
5W - 30
-20
-29 -18 -7 4 16 27
38 0 20 40 60 80 100
°C °F
TEMPERATURE RANGE ANTICIPATED BEFORE NEXT OIL CHANGE
2JZ-GTE
LU0JY-01
Z13413
2JZ-GTE
Z16754
2JZ-GTE M/T
P11837
- LUBRICATIONOIL AND FILTER
LU-1
1448 Author: Date:
1997 SUPRA (RM502U)
OIL AND FILTER
INSPECTION
1. CHECK OIL QUALITY
Check the oil for deterioration, entry of water, discoloring or thin-
ning.
If oil quality is visibly poor, replace the oil.
Oil grade (2JZ-GE):
API grade SH Energy-Conserving II or SJ, Energy-
Conserving or ILSAC multigrade engine oil.
SAE 5W-30 is the best choice for your vehicle, for
good fuel economy, and good starting in cold weath-
er.
Oil grade (2JZ-GTE):
API grade SH Energy-Conserving II or SJ, Energy-
Conserving or ILSAC multigrade engine oil.
Recommended viscosity is as shown in the illustra-
tion.
2. CHECK ENGINE OIL LEVEL
The oil level should be between the low level and full level marks
on the dipstick.
If low, check for the leakage and add oil up to full level mark.
3. REMOVE ENGINE UNDER COVER
4. 2JZ-GTE:
REMOVE NO.2 AIR TUBE
Loosen the 2 hose clamps, and remove 2 bolts and air tube.
5. 2JZ-GTE M/T:
REMOVE DRIVE BELT TENSION DAMPER
Remove the 2 nuts and tensioner damper.
6. REMOVE DRIVE BELT
Loosen the drive belt tension by turning the drive belt tensioner
clockwise, and remove the drive belt.
Page 1369 of 1807

P12279
P12303
Oil Pressure
Switch
SST
P12301
Oil Pressure Gauge LU-2
- LUBRICATIONOIL AND FILTER
1449 Author: Date:
1997 SUPRA (RM502U)
7. DISCONNECT A/C COMPRESSOR FROM ENGINE
(a) Remove the 4 bolts and nut.
(b) Using a torx socket (E10), remove the stud bolt.
(c) Disconnect the compressor connector.
(d) Remove 4 bolts and pull the compressor downward.
8. REMOVE OIL PRESSURE SWITCH, AND INSTALL OIL
PRESSURE GAUGE
(a) Disconnect the oil pressure switch connector.
(b) Using SST, remove the oil pressure switch.
SST 09816-30010
(c) Install an oil pressure gauge.
9. REINSTALL A/C COMPRESSOR
(a) Temporarily install the A/C compressor with the 4 bolts.
(b) Connect the compressor connector.
(c) Install the compressor with the stud bolts, 4 bolts and nut.
Torque:
Stud bolt: 26 N´m (265 kgf´cm, 19 ft´lbf)
Bolt and nut: 52 N´m (530 kgf´cm, 38 ft´lbf)
10. REINSTALL DRIVE BELT
Install the drive belt by turning the drive belt tensioner clock-
wise.
11. WARM UP ENGINE
Allow the engine to warm up to normal operating temperature.
12. CHECK OIL PRESSURE
Oil pressure:
At idle
49 kPa (0.5 kgf/cm
2, 7.1 psi) or more
At 3,000 rpm (2JZ-GE) or 4,000 rpm (2JZ-GTE)
324 - 579 kPa
(3.3 - 5.9 kgf/cm
2, 47 - 84 psi)
13. REMOVE DRIVE BELT
14. DISCONNECT A/C COMPRESSOR FROM ENGINE