Page 369 of 1399
BR1D5−03
BR−36
−
BRAKE REAR BRAKE CALIPER
1996 LAND CRUISER (RM451U)
INSPECTION
1. MEASURE PAD LINING THICKNESS (See step 1. on page BR−27)
Standard thickness: 10.0 mm (0.394 in.)
Minimum thickness: 1.0 mm (0.039 in.)
2. MEASURE DISC THICKNESS (See page BR−27 )
Standard thickness: 18.0 mm (0.709 in.)
Minimum thickness: 16.0 mm (0.630 in.)
3. MEASURE DISC RUNOUT (See page BR−27 )
Maximum disc runout: 0.15 mm (0.0059 in.)
If the runout is greater than the maximum, adjust the disc runout
or grind it on a ”On−Car” brake lathe.
4. IF NECESSARY, REPLACE DISC
(a) Remove the torque plate..
(b) Remove the hub nuts of the temporarily installed disc and
pull off the disc.
(c) Install a new disc and and loosely install the hub nuts.
(d) Install the torque plate and tighten the mounting bolts. Torque: 103 N·m (1,050 kgf·cm, 76 ft·lbf)
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 373 of 1399
BR1D8−04
BR−40
−
BRAKE PARKING BRAKE
1996 LAND CRUISER (RM451U)
DISASSEMBLY
1. REMOVE REAR WHEEL
2. REMOVE REAR DISC BRAKE ASSEMBLY
(a) Remove the 2 mounting bolts and remove the disc brake assembly.
Torque: 88 N·m (900 kgf·cm, 65 ft·lbf)
(b) Suspend the disc brake assembly securely. Ensure that the hose is not stretched.
3. REMOVE DISC
Place the matchmarks on the disc and rear hub, and remove the
disc.
HINT:
If the disc cannot be removed easily, turn the shoe adjuster until
the wheel turns freely.
4. REMOVE TENSION SPRING
Using needle −nose pliers, remove the tension spring.
5. REMOVE SHOE RETURN SPRINGS
Using SST, remove the shoe return springs. SST 09717−20010
HINT:
Using SST, install the front shoe return spring and then install
the rear return spring. SST 09718−20010
6. REMOVE SHOE STRUT WITH SPRING
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 374 of 1399

−
BRAKE PARKING BRAKE
BR−41
1996 LAND CRUISER (RM451U)
7. REMOVE REAR SHOE, ADJUSTER AND TENSION
SPRING
(a) Slide out the rear shoe, and remove the rear shoe and ad-
juster.
(b) Remove the 2 shoe hold −down spring cups, spring and
pin.
(c) Remove the lower side tension spring.
8. REMOVE FRONT SHOE
(a) Slide out the front shoe.
(b) Remove the shoe 2 hold −down spring cups, springs and
pin.
(c) Disconnect the parking brake cable from the parking
brake shoe lever.
9. IF NECESSARY, REMOVE AND DISASSEMBLE PARKING BRAKE BELLCRANK ASSEMBLY
(a) Using a screwdriver, remove the C −washer.
(b) Remove the pin and disconnect the parking brake cable No.2 from the bellcrank.
(c) Remove the clip.
(d) Remove the pin and clip, then disconnect the parking
brake cable.
(e) Remove the 2 tension springs.
(f) Remove the 2 bolts and parking brake bellcrank assem- bly.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
(g) Remove the boot from parking brake bellcrank bracket.
(h) Using a screwdriver, remove the C −washer and pin.
(i) Remove the parking brake bellcrank from the bell crank bracket.
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 377 of 1399

BR1DA−01
BR−44
−
BRAKE PARKING BRAKE
1996 LAND CRUISER (RM451U)
REASSEMBLY
Reassembly is in the reverse order of disassembly (See
page BR−40 ).
NOTICE:
Apply high temperature grease and lithium soap base gly-
col grease to the parts indicated by the arrows (See page
BR−39 ).
1. ADJUST PARKING BRAKE SHOE CLEARANCE
(a) Disconnect the PKB cable from bellcrank and remove the 2 tension springs.
(b) Loosen the stopper bolt.
(c) Temporarily install the hub nuts.
(d) Remove the hole plug.
(e) Turn the adjuster and expand the shoes until the disc
locks.
(f) Return the adjuster 8 notches.
(g) Install the hole plug.
2. ADJUST BELLCRANK
(a) Pull the bellcrank until all play in the interior linkage is tak-
en up.
(b) Screw in the bellcrank adjusting bolt to where it contacts on the dust seal.
(c) Loosen it one turn, and lock it at that position with the lock nut.
Torque: 5.4 N·m (55 kgf·cm, 48 in.·lbf)
(d) Install the bellcrank spring.
(e) Connect the PKB cable to the bellcrank.
3. BEDDING DOWN PARKING BRAKE SHOES AND
DISC
(a) Drive the vehicle at about 50 km/h (31 mph) on a safe, lev-
el and dry road.
(b) With the parking brake release button pushed in, pull on the lever with 88 N (9 kgf, 19.8 lbf) of force.
(c) Drive the vehicle for about 400 meters (0.25 mile) in this condition.
(d) Repeat this procedure 2 or 3 times.
4. RECHECK AND ADJUST PARKING BRAKE LEVER TRAVEL
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 381 of 1399
BR1DD−01
BR−48−
BRAKE LOAD SENSING PROPORTIONING AND BY− PASS
VALVE (LSP & BV)
1996 LAND CRUISER (RM451U)
REMOVAL
1. DISCONNECT SHACKLE NO.2 FROM BRACKET
(a) Remove the cotter pin.
(b) Remove the nut and disconnect the shackle No.2 from the bracket.
(c) Remove the retainer, 2 cushions and collar.
2. REMOVE LSP & BV ASSEMBLY
(a) Using SST, disconnect the 3 brake lines from the valve body.
SST 09751−36011
(b) Remove the valve bracket and 4 mounting bolts, then re-
move the LSP & BV assembly.
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 382 of 1399
BR1DE−01
−
BRAKE LOAD SENSING PROPORTIONING AND BY− PASS
VALVE (LSP & BV)BR−49
1996 LAND CRUISER (RM451U)
DISASSEMBLY
1. REMOVE VALVE BRACKET
(a) Remove the nut, bolt and 2 plate washers.
(b) Remove the 2 nuts, bracket and set plate from the valve
body.
2. DISCONNECT SPRING FROM VALVE
Using pliers, remove the clip, and remove the spring from the
valve.
3. REMOVE SHACKLE NO.1 AND NO.2
(a) Remove the bolt and nut, then remove the these parts:
Load sensing spring
2 plate washers
(b) Loosen the 2 nuts, and remove the shackle No.1 from the
shackle No.2.
4. DISASSEMBLE LOAD SENSING SPRING
Disassembly the these parts:
4 bushings
2 collars
2 rubber plates
Load sensing valve boot
Load sensing spring boot
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 384 of 1399

BR1DG−01
BR0070
−
BRAKE LOAD SENSING PROPORTIONING AND BY− PASS
VALVE (LSP & BV)BR−51
1996 LAND CRUISER (RM451U)
REASSEMBLY
1. ASSEMBLE THESE PARTS TO LOAD SENSING
SPRING:
Load sensing valve boot
Load sensing spring boot
4 bushings
2 rubber plates
2 collars
HINT:
Apply lithium soap base glycol grease to the parts indicated by
the arrrows. Do not mistake the valve side for the shackle side
of the load sensing spring.
2. INSTALL SHACKLE NO.1 AND NO.2 TO LOAD SENS-
ING SPRING
(a) Install the lock nut and shackle No. 1 to the shackle No. 2.
(b) Torque the bolt and nut through the 2 plate washers. Torque: 18 N·m (185 kgf·cm, 13 ft·lbf)
3. INSTALL LOAD SENSING SPRING TO VALVE BODY
Install the load sensing spring assembly to the load sensing
valve with the clip.
4. INSTALL VALVE BRACKET
(a) Install the set plate to the valve assembly through the valve bracket and temporarily tighten the 2 valve body
mounting nuts.
(b) Torque the bolt and nut through the 2 plate washers. Torque: 18 N·m (185 kgf·cm, 13 ft·lbf)
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 385 of 1399

BR1DH−01
R05477
A
BR−52−
BRAKE LOAD SENSING PROPORTIONING AND BY− PASS
VALVE (LSP & BV)
1996 LAND CRUISER (RM451U)
INSTALLATION
1. INSTALL LSP & BV ASSEMBLY
Install the LSP & BV assembly to the frame with the 4 bolts. Torque: 25 N·m (260 kgf·cm, 19 ft·lbf)
2. CONNECT SHACKLE NO.2 TO BRACKET
(a) Set the dimension A by turning shackle No.2. Initial set: 90 mm (3.54 in.)
(b) Tighten the lock nut. Torque: 25 N·m (250 kgf·cm, 18 ft·lbf)
(c) Install the 2 bushings and collar to the load sensing spring
shackle.
(d) Install the load sensing spring shackle to the shackle bracket with a retainer and nut.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
(e) Install a new cotter pin.
3. CONNECT BRAKE LINES
Using SST, connect the 3 brake lines. SST 09751−36011
Torque: 15 N·m (155 kgf·cm, 11 ft·lbf)
4. SET REAR AXLE LOAD (See page BR−45 )
5. SET VALVE BODY
(a) When pulling down the load sensing spring, confirm that the valve piston moves down smoothly.
(b) Position the valve body so that the valve piston lightly contacts the load sensing spring.
(c) Tighten the 2 valve body mounting nuts. Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
6. BLEED BRAKE SYSTEM (See page BR−4 )
7. CHECK FLUID LEAKAGE
8. CHECK AND ADJUST LSP & BV FLUID PRESSURE (See page BR−45 )
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010