23. REMOVE OIL DIPSTICK GUIDES FOR ENGINE AND
TRANSMISSION
(a) Remove the 2 bolts.
(b) Pull out the dipstick guide together with the dipstick.
(c) Remove the O±ring from the dipstick guide.
24. REMOVE STARTER
(See starter removal in Starting System)
25. REMOVE AIR INTAKE CHAMBER
(a) Except California:
Disconnect the vacuum sensing hose from the fuel pressure
regulator.
(b) Remove the bolt holding the engine wire protector to the the
air intake chamber.
(c) Remove the 5 bolts, nut, air intake chamber and gasket.
26. REMOVE VACUUM CONTROL VALVE SET
(a) Disconnect the VSV connector.
(b) Remove the 2 nuts and vacuum control valve set.
27. DISCONNECT ENGINE WIRE
(a) Remove the bolt, and disconnect the engine wire bracket
from the water pump.
(b) Remove the 2 bolts, and disconnect the 2 ground straps from
the intake manifold.
(c) Remove the 2 bolts, and disconnect the 2 wire clamps from
the intake manifold.
(d) Disconnect these connectors:
w6 injector connectors
wECT sensor connector
wECT sender gauge connector
± ENGINEENGINE MECHANICALEG±43
(b) Using a gasket scraper, remove all the gasket material from
the top surface of the cylinder block.
(c) Using compressed air, blow carbon and oil from the bolt
holes.
CAUTION: Protect your eyes when using high pressure com-
pressed air.
2. CLEAN CYLINDER HEAD
A. Remove gasket material
Using a gasket scraper, remove all the gasket material from
the cylinder block surface.
NOTICE: Be careful not to scratch the cylinder block contact
surface.
B. Clean combustion chambers
Using a wire brush, remove all the carbon from the combus-
tion chambers.
NOTICE: Be careful not to scratch the cylinder block contact
surface.
C. Clean valve guide bushings
Using a valve guide bushing brush and solvent, clean all the
guide bushings.
D. Clean cylinder head
Using a soft brush and solvent, thoroughly clean the cylinder
head.
± ENGINEENGINE MECHANICALEG±51
8. INSTALL FUEL INLET PIPE
(a) Connect the fuel inlet pipe with 2 new gaskets and the union
bolt.
Torque: 42 NVm (420 kgfVcm, 30 ftVlbf)
(b) Install the clamp bolt to the intake manifold.
9. INSTALL FUEL PRESSURE PULSATION DAMPER
(See fuel pressure pulsation damper installation in SFI
System)
10. INSTALL INTAKE MANIFOLD STAY
Torque: 39 NVm (400 kgfVcm, 29 ftVlbf)
11. INSTALL WATER OUTLET AND NO.1 BYPASS HOSE
ASSEMBLY
12. CONNECT ENGINE WIRE
(a) Install the engine wire protector to the intake manifold with
the 3 nuts.
(b) Connect these connectors:
w6 injector connectors
HINT: The No.1, No.3 and No.5 injector connectors are dark
gray, and the No.2, No.4 and No.6 injector connectors are
gray.
wECT sensor connector
wECT sender gauge connector
(c) Install the 2 wire clamps to the intake manifold with the bolts.
(d) Install the 2 ground straps to the intake manifold with the
bolts.
(e) Install the engine wire bracket to the water pump with the bolt.
13. INSTALL VACUUM CONTROL VALVE SET
Torque: 21 NVm (210 kgfVcm, 15 ftVlbf)
14. INSTALL AIR INTAKE CHAMBER
(a) Install a new gasket and the intake chamber with the 5 bolts
and nut.
Torque: 27 NVm (280 kgfVcm, 20 ftVlbf)
(b) Install the bolt holding the engine wire protector to the air
intake chamber.
(c) Except California:
Connect the vacuum sensing hose to the fuel pressure regu-
lator.
15. INSTALL STARTER
(See starter removal in Starting System)
16. INS TALL OIL DIP S TICK GUIDE S FO R ENG INE AND
TRANSMISSION
(a) Install a new O±ring to the dipstick guide.
(b) Apply soapy water to the O±ring.
(c) Connect the dipstick guide end to the oil pan.
(d) Install the 2 dipstick guides with the 2 bolts.
17. INSTALL ENGINE WIRE BRACKET
18. CONNECT FUEL RETURN HOSE
± ENGINEENGINE MECHANICALEG±67
(d) Install the seal washers to the mounting bolts.
(e) Install the No.2 cylinder head cover with the 4 seal washers
and 4 bolts.
Torque: 5.4 NVm (55 kgfVcm, 48 in.Vlbf)
(f) Install the No.1 cylinder head cover with the 4 seal washers
and 4 bolts.
Torque: 5.4 NVm (55 kgfVcm, 48 in.Vlbf)
(g) Install the PCV valve.
(h) Install the cruise control actuator cable bracket and IAC valve
pipe clamp with the 2 bolts.
7. INSTALL SPARK PLUGS
8. INSTALL IGNITION COILS ASSEMBLIES
(See ignition coils installation in Ignition System)
9. INSTALL TIMING BELT
(See steps 11 to 17 in timing belt installation)
10. INS TALL INTAKE MANIFO LD AND DE LIV E RY PIP E
ASSEMBLY
Install a new gasket, the intake manifold, delivery pipe as-
sembly and engine wire bracket with the 4 bolts and 2 nuts.
Torque: 27 NVm (280 kgfVcm, 20 ftVlbf)
11. INSTALL FUEL INLET PIPE
(a) Connect the fuel inlet pipe with 2 new gaskets and the union
bolt.
Torque: 42 NVm (420 kgfVcm, 30 ftVlbf)
(b) Install the clamp bolt to the intake manifold.
12. INSTALL FUEL PRESSURE PULSATION DAMPER
(See fuel pressure pulsation damper installation in SFI
System)
13. INSTALL PRESSURE TANK AND VSV ASSEMBLY
Torque: 21 NVm (210 kgfVcm, 15 ftVlbf)
14. INSTALL STATER
(See starter installation in Starting System)
15. CONNECT ENGINE WIRE
(a) Install the engine wire protector to the intake manifold with
the nut.
(b) Install the 2 ground straps to the intake manifold with the
bolts.
(c) Connect these connectors and clamps:
wVSV connector fo EVAP EG±70
± ENGINEENGINE MECHANICAL
13. REMOVE OIL PRESSURE SWITCH AND KNOCK
SENSORS
Using SST, remove the switch and sensors.
SST 09816±30010
14. 2JZ±GTE:
REMOVE UNION FOR OIL COOLER HOSE
15. REMOVE ENGINE COOLANT DRAIN PLUG
16. R E M O V E R H E N G I N E M O U N T I N G B R A C K E T A N D
INSULATOR ASSEMBLY
17. 2JZ±GTE:
REMOVE CRANKSHAFT POSITION SENSOR
18. REMOVE WATER PUMP
(See water pump removal in Cooling System)
19. REMOVE OIL PUMP
(See oil pump removal in Lubrication System)
CYLINDER BLOCK DISASSEMBLY
1. REMOVE REAR OIL SEAL RETAINER
(a) Remove the 6 bolts.
(b) Remove the oil seal retainer by prying the area between the
oil seal retainer and main bearing cap with a screwdriver.
2. CHECK CONNECTING ROD THRUST CLEARANCE
Using a dial indicator, measure the thrust clearance while
moving the connecting rods back and forth.
Standard thrust clearance:
0.250±0.402 mm (0.0098±0.0158 in.)
Maximum thrust clearance:
0.50 mm (0.0197 in.)
If the thrust clearance is greater than maximum, replace the
connecting rod assembly(s). If necessary, replace the crank-
shaft.
Connecting rod thickness:
25.898±25.950 mm (1.0196±1.0217 in.)
3. REMOVE CONNECTING ROD CAPS AND CHECK OIL
CLEARANCE
(a) Check the matchmarks on the connecting rod and cap to
ensure correct reassembly.
± ENGINEENGINE MECHANICALEG±99
AFTER ASSEMBLY
1. INSTALL OIL PUMP
(See oil pump installation in Lubrication System)
2. INSTALL WATER PUMP
(See water pump installation in Cooling System)
3. 2JZ±GTE:
INSTALL CRANKSHAFT POSITION SENSOR
Torque: 8.8 NVm (90 kgfVcm, 78 in.Vlbf)
4. INSTALL RH ENGINE MOUNTING BRACKET AND
INSULATOR ASSEMBLY
HINT: The RH mounting bracket is marked ºA u EXº.
Torque: 58 NVm (590 kgfVcm, 43 ftVlbf)
5. INSTALL ENGINE COOLANT DRAIN PLUG
Torque: 29 NVm (300 kgfVcm, 22 ftVlbf)
6. 2JZ±GTE:
INSTALL UNION FOR OIL COOLER HOSE
(a) Apply adhesive to 2 or 3 threads of the union.
Adhesive:
Part No. 08833±00070, THREE BOND 1324, or
equivalent
(b) Install the union.
Torque: 39 NVm (400 kgfVcm, 29 ftVlbf)
7. INSTALL KNOCK SENSORS AND OIL PRESSURE
SWITCH
(a) Apply adhesive to 2 or 3 threads of the oil pressure switch.
Adhesive:
Part No. 08833±00080, THREE BOND 1344, LOCTITE
242 or equivalent
(b) Using SST, install the 2 knock sensors and oil pressure
switch.
SST 09816±30010
Torque:
Knock sensor
44 NVm (450 kgfVcm, 33 ftVlbf)
Oil pressure switch
14 NVm (150 kgfVcm, 11 ftVlbf)
± ENGINEENGINE MECHANICALEG±121
13. CONNECT ENGINE WIRE TO COWL PANEL
14. INSTALL A/C COMPRESSOR
(a) Using a torx socket (E10), install the stud bolt and and
compressor.
Torque: 26 NVm (265 kgfVcm, 19 ftVlbf)
(b) Connect the compressor connector.
(c) Temporarily install the compressor with nut and 3 bolts.
(d) Alternately tighten the bolt and nut.
Torque: 52 NVm (530 kgfVcm, 38 ftVlbf)
15. INSTALL PS PRESSURE TUBE
16. INSTALL PS PUMP
(a) Install the pump bracket with the 3 bolts.
Torque:
A 58 NVm (590 kgfVcm, 43 ftVlbf)
B 39 NVm (400 kgfVcm, 29 ftVlbf)
(b) Install the pump housing with the 2 bolts.
Torque: 58 NVm (590 kgfVcm, 43 ftVlbf)
(c) Connect these hoses:
wAir hose to throttle body
wAir hose to air intake chamber
17. CONNECT FUEL HOSES
(a) Connect the fuel return hose to the fuel return pipe.
(b) Install the fuel return hose to the clamp of the dipstick guide.
(c) Install the fuel inlet hose with 2 new gaskets and the union
bolt.
Torque: 29 NVm (300 kgfVcm, 22 ftVlbf)
18. CONNECT WIRES AND CONNECTORS
19. CONNECT EVAP HOSE
20. CONNECT BRAKE BOOSTER VACUUM HOSE
21. CONNECT HEATER WATER HOSES
22. INSTALL CHARCOAL CANISTER
23. INSTALL WATER PUMP PULLEY, FAN, FLUID COUPLING
ASSEMBLY AND DRIVE BELT
(See step 10 in water pump installation in Cooling Sys-
tem)
24. M/T:
INSTALL DRIVE BELT TENSIONER DAMPER
(See step 19 timing belt installation)
25. INSTALL AIR CLEANER AND MAF METER ASSEMBLY
26. INSTALL NO.1 AIR HOSE
27. CONNECT CONTROL CABLES TO THROTTLE BODY
28. FILL WITH FUEL
29. FILL WITH ENGINE OIL
30. START ENGINE AND CHECK FOR LEAKS
± ENGINEENGINE MECHANICALEG±131
Crankshaft
(cont'd)
Main bearing center wall thickness (Reference)
Mark 1
Mark 2
Mark 3
Mark 4
Mark 5
Crank pin diameter STD
U/S 0.25
Circle runout Maximum
Main journal taper and out±of±round Maximum
Crank pin taper and out±of±round Maximum
1.994±1.997 mm (0.0785±0.0786 in.)
1.997±2.000 mm (0.0786±0.0787 in.)
2.000±2.003 mm (0.0787±0.0789 in.)
2.003±2.006 mm (0.0789±0.0790 in.)
2.006±2.009 mm (0.0790±0.0791 in.)
51.982±52.000 mm (2.0465±2.0472 in.)
51.745±51.755 mm (2.0372±2.0376 in.)
0.06 mm (0.0024 in.)
0.02 mm (0.0008 in.)
0.02 mm (0.0008 in.)
TORQUE SPECIFICATIONS
Part tightened NVm kgfVcm ftVlbf
Timing belt plate X Oil pump (2JZ±GTE) 7.8 80 69 in.Vlbf
Idler pulley X Oil pump 34 350 25
Crankshaft pulley X Crankshaft 324 3,300 239
Camshaft timing pulley X Camshaft 79 810 59
Timing belt tensioner X Oil pump2627020 Drive belt tensioner X Cylinder head 21 210 15 Drive belt tensioner damper X Tensioner arm (2JZ±GTE M/T) 20 200 14 Drive belt tensioner damper X Tensioner bracket (2JZ±GTE M/T) 20 200 14 EGR cooler X Cylinder head 8.8 90 78 in.Vlbf ECT sensor X Cylinder head (2JZ±GE) 20 200 14 ECT sender gauge X Cylinder head (2JZ±GE) 20 200 14
Engine hanger X Cylinder head 39 400 29
Camshaft position sensor X Cylinder head (2JZ±GTE) 8.8 90 78 in.Vlbf
Cylinder head X Cylinder block 1st
2nd
3rd
34
Turn 905
Turn 905
350
25
Camshaft bearing cap X Cylinder head 20 200 14
No.4 timing belt cover X Cylinder head 8.8 90 78 in.Vlbf
Cylinder head cover X Cylinder head 2JZ±GE
2JZ±GTE 8.3
5.4 85
55 74 in.Vlbf
48 in.Vlbf
Intake manifold X Cylinder head 2JZ±GE
2JZ±GTE
27
27
280
280
20
20
Fuel inlet pipe X Delivery pipe 42 420 30 Intake manifold stay X Intake manifold 39 400 29
Intake manifold stay X Cylinder block 39 400 29
Water outlet X Cylinder head (2JZ±GTE) 21 210 15
Vacuum control valve set X Intake manifold (2JZ±GE) 21 210 15
Air intake chamber X Intake manifold 2JZ±GE
2JZ±GTE
27
27
280
280
20
20
Air intake chamber stay X Cylinder head (2JZ±GE) 18 185 13
Air intake chamber stay X Air intake chamber (2JZ±GE) 18 185 13
Exhaust manifold X Cylinder head 39 400 29
Pressure tank X Intake manifold (2JZ±GTE)2121015
Main bearing cap X Cylinder block 1st
2nd
44
Turn 905
450
33
EG±138± ENGINEENGINE MECHANICAL