2012 SSANGYONG NEW REXTON Service Manual

Page 273 of 600

SSANGYONG NEW REXTON 2012  Service Manual Component SizeBolt 
QuantitySpecified torque 
(Nm)Remark
(Total torque)
Glow plug M5  4 
- 
Vacuum pump
3 - 
Timing gear case cover
3 - 
7 - 
1 - 
3 - 
Cylinder head cover
21 - 
Oil gauge tube
1 - 
Oi

Page 274 of 600

SSANGYONG NEW REXTON 2012  Service Manual 0000-00
3. CHECK AND INSPECTION
1) Cylinder
(1) Compression pressure test
Specified value
Compression ratio16.5 : 1 
Test condition
Compression pressureStandard32 bar 
Minimum18 bar 
Differential limi

Page 275 of 600

SSANGYONG NEW REXTON 2012  Service Manual (2) Cylinder pressure leakage test
If the measured value of the compression pressure test is not within the specifications, perform the 
cylinder pressure leakage test.Specified value
Perform this tes

Page 276 of 600

SSANGYONG NEW REXTON 2012  Service Manual 0000-00
Position the piston at TDC and measure the 
piston protrusion from crank case mating 
surface.
(3) Piston protrusion check
Specified value 0.475 to 0.745 mm
Measure it at both ends of cranksha

Page 277 of 600

SSANGYONG NEW REXTON 2012  Service Manual 2) Cylinder Head
(1) Cylinder head mating surface check
Specified value
Total height "A"131.9 to 132.1 mm
Minimum height after machining131.9 mm
FlatnessLongitudinal direction0.1 / 150
Transve

Page 278 of 600

SSANGYONG NEW REXTON 2012  Service Manual 0000-00
4. GUIDELINES ON ENGINE SERVICE
To prevent personal injuries and vehicle damages that can be caused by mistakes during engine and 
unit inspection/repair and to secure optimum engine performan

Page 279 of 600

SSANGYONG NEW REXTON 2012  Service Manual Electrical equipment
Electric devices should be handled more carefully.
Currently, the engine has a lot of electric devices. there could be poor engine performance, incomplete 
combustion and other ab

Page 280 of 600

SSANGYONG NEW REXTON 2012  Service Manual 0000-00
Rear mounting insulator
Old New
5. MAJOR CHANGES
Front mounting insulator(LH, RH)
Old New
RHLHRHLH
The optimized engine mountings have been introduced after performing the system analysis and