1997 SUBARU LEGACY battery

[x] Cancel search: battery

Page 1783 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0129A
2. SUB SWITCH
Set power window sub switch to each position and check
continuity between terminals as indicated in table below:
Terminal
Switch position51342
UP

*
OFF

*
DOWN

3.

Page 1784 of 3342

SUBARU LEGACY 1997  Service Repair Manual 17. Power Door Lock
A: REMOVAL AND INSTALLATION
1. FRONT AND REAR DOOR, AND REAR GATE LOCK
ACTUATOR
Refer to 5-2 [W2A7] as for removal and installation of front
door lock actuator, rear door lock actu

Page 1785 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0762
B: INSPECTION
1. DOOR LOCK SWITCH (DRIVER’S AND FRONT
PASSENGER’S DOOR)
1) Remove door trim panel. <Ref. to 5-2 [W2A2].>
2) Set switch to each position and check continuity
between termina

Page 1786 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0762
B: INSPECTION
1. DOOR LOCK SWITCH (DRIVER’S AND FRONT
PASSENGER’S DOOR)
1) Remove door trim panel. <Ref. to 5-2 [W2A2].>
2) Set switch to each position and check continuity
between termina

Page 1788 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0140
2. REARVIEW MIRROR
Check to ensure that rearview mirror moves properly when
battery voltage is applied to terminals as indicated in table
below:
OperationTerminal connection
(+) (�)
UP 3 1
DOW

Page 1789 of 3342

SUBARU LEGACY 1997  Service Repair Manual 19. Sunroof
A: REMOVAL AND INSTALLATION
1. SUNROOF AND SUNROOF MOTOR
Refer to 5-1 [W16A0] as for removal and installation of
sunroof system.
B6M0353A
2. SUNROOF SWITCH
NOTE:
The sunroof switch is inst

Page 1790 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0144A
3. SUNROOF RELAY
Check continuity between terminals as indicated in table
below, when battery voltage is applied between terminals
No. 1 and No. 3.
When current flows. Between terminals
No. 2

Page 1791 of 3342

SUBARU LEGACY 1997  Service Repair Manual B6M0144A
3. SUNROOF RELAY
Check continuity between terminals as indicated in table
below, when battery voltage is applied between terminals
No. 1 and No. 3.
When current flows. Between terminals
No. 2