Page 1078 of 1865
7B ASSEMBLY
76G07B-186
76G07B-187
76G07B-188
10. G4A-EL
(1) Install the oil pipes, oil hoses, and switch box
as an assembly; then install the harness clip.
Tightening torque:
Switch box
16—24 Nm (1.6—2.4 m-kg, 12—17 ft-lb)
Harness clip
8—11 Nm (80—110 cm-kg, 69—95 in-lb)
(2) Install the ball, spring, gasket, and a plug.
Tightening torque:
31—47
N
m (3.2—4.8 m-kg, 23—35 ft-lb)
G4A-HL
Install the oil pipe, ball, spring, oil pipe, gasket, and
plug.
Tightening torque: 31—47
N
m
(3.2—4.8 m-kg, 23—35 ft-lb)
11. Install the solenoid connector.
76G07B-189
7B—212
Page 1079 of 1865

ASSEMBLY 7B
12. Install the pulse generator and fluid temperature
switch.
Tightening torque:
Pulse generator
8—11 N-m (80—110 cm-kg, 69—95 in-lb)
Fluid temperature switch
29—39 N-m (3.0—4.0 m-kg, 22—29 in-lb)
76G07B-190
76G07B-191
13. Install the inhibitor switch.
(1) Turn the manual shaft to the "N" position.
(2) Install the inhibitor switch and loosely tighten
the bolts.
(3) Remove the screw and move the inhibitor
switch so that the alignment hole is aligned with
the screw hole.
(4) Insert a 2.0 mm (0.079 in) diameter pin
through the holes.
(5) Install the screw; then tighten the bolts to the
specified torque.
Tightening torque:
8—11 N-m (80—110 cm-kg, 69—95 in-lb)
14. Install the harness with the remaining clip.
Tightening torque:
8—11 N-m (80—110 cm-kg, 69—95 in-lb)
15. Remove the transaxle from the SST.
76G07B-192
16. Install the oil level gauge and tube along with a new
O-ring to the transaxle case.
Tightening torque:
7—10 N-m (70—100 cm-kg, 61—87 in-lb)
76G07B-193
7B-213
Page 1080 of 1865
7B ASSEMBLY
/ O-ring
17. Install the oil pump shaft.
18. Install a new O-ring onto the turbine shaft.
76G07B-194
76G07B-195
19. Fill the torque converter with ATF if it has been
drained and washed.
ATF type: Dexron II or M III
20. Install the torque converter in the converter hous-
ing while rotating it to align the splines.
Caution
a) Hold the torque converter in an erect posi-
tion when filling it with ATF, do not allow
the fluid to overflow.
b) If the converter does not fit in easily, do not
try to force it; install carefully.
21. To ensure that the torque converter is installed ac-
curately, measure distance A between the end of
the torque converter and the end of the converter
housing.
(A): approx. 25 mm (0.98 in)
22. Install the engine mount No.1
Tightening torque:
58—67
N
m (5.9—6.8 m-kg, 43—49 ft-lb)
76G07B-197
7B-214
Page 1081 of 1865
INSTALLATION 7B
INSTALLATION
TORQUE SPECIFICATIONS
16-23 N-m (1.6—2.3 m-kg, 12—17 ft-lb)
5-7 N-m (50—70 cm-kg, 43—61 In-lb)
31—40 N-m (3.2—4.1 m-kg, 23—30 ft-lb)
42—62 N m (4.3—6.3 m-kg, 31.1—45.6 fMb)
8—11 N-m (60—110 cm-kg, 69—95 In-lb)
88—118 N-m (9-12 m-kg, 65—87 ft-lb)
85—117 N-m 67—93 M-rr (8.7—11.9 m-kg, (6.8—9.5 m-kg, 63—83 ft-lb) 49—69 ft-lb) (3.7—5.5 m-kg, 27—40 ft-lb)
86U07B-440
7B-215
Page 1082 of 1865
7B INSTALLATION
1. Attach rope at 2 places on the transaxle. Place a
flat board on a jack and set the transaxle on it.
Caution
The transaxle is not well balanced; be care-
ful when positioning it on the jack.
2. Move the transaxle into place and attach the rope
to the SST.
86U07B-441
3. Mount the transaxle to the engine.
Tightening torque:
89—117
N m
(9.1—11.9 m-kg, 66—86 ft-lb)
Note
a) Lift the transaxle with the jack while pull-
ing the rope.
b) Align the torque converter bolts and drive
plate holes.
86U07B-442
4. Install engine mount No. 4 and bracket.
Tightening torque:
Bolt
36—54 Nm (3.7—5.5 m-kg, 27—40 ft-lb)
Nut
64—89
N
m (6.5—9.1 m-kg, 47—66 ft-lb)
86U07B-443
5. Install engine mount No. 2.
Tightening torque:
(A)
85—117
N
m
(8.7—11.9 m-kg, 63—86 ft-lb)
(|)67—93 Nm
(6.8—9.5 m-kg, 49—69 ft-lb)
86U07B-444
7B—216
Page 1083 of 1865
INSTALLATION 7B
6. Install the crossmember and the left side lower arm
as an assembly.
Tightening torque:
Bolt
36—54 Nm (3.7—5.5 m-kg, 27—40 ft-lb)
Nut
75—93
N
m (7.6—9.5 m-kg, 55—69 ft-lb)
7. Install the jack and the rope.
8. Remove the SST.
86U07B-445
86U07B-446
9. Install the starter and harnesses.
Tightening torque:
® 9.8—12 N-m
(100—120 cm-kg, 87—104 in-lb)
(|)31—46 N-m
(3.2—4.7 m-kg, 23—34 ft-lb)
10. Install the manifold bracket.
Tightening torque:
©19—30 N-m
(1.9—3.1 m-kg, 14—22 ft-lb)
(6)37—52 N-m
(3.8—5.3 m-kg, 27—38 ft-lb)
11. Install the torque converter nuts.
Tightening torque:
43—61
N
m (4.4—6.2 m-kg, 32—45 ft-lb)
12. Install the end plate.
Tightening torque:
8—11 Nm (80—110 cm-kg, 69—95 in-lb)
86U07B-447
13. Install the gusset plates and exhaust pipe hanger.
Tightening torque:
Gasset plate
37—52 N-m (3.8—5.3 m-kg, 27—38 ft-lb)
Exhaust pipe hanger
19—25 N-m (1.9—2.6 m-kg, 14—19 ft-lb)
7B-217
Page 1084 of 1865

7B INSTALLATION
86U07B-449
Standard bolt Reamer bolt
86U07B-450
86U07B-451
14. Replace the clips at the end of the driveshaft and
joint shaft with new ones.
15. Install the joint shaft and right driveshaft as follows:
(1) Remove the SST and insert the joint shaft into
the transaxle.
(2) Mount the joint shaft bracket onto the engine.
(3) Install and tighten the reamer bolts; then install
and tighten the standard bolts.
Tightening torque:
Reamer bolts 6.9—9.8 N-m
(70—100 cm-kg, 61—87 in-lb)
Standard bolts 42—62 N-m
(4.3—6.3 m-kg, 31.1—45.6 ft-lb)
(4) Pull the front hub outward to connect the
driveshaft to the joint shaft.
(5) Push the joint from the differential side to se-
curely connect the driveshaft to the joint shaft.
Caution
a) Do not damage the oil seal.
b) After installation, pull the front hub outward
to verify that the driveshaft does not come.
16. Install the left driveshaft as follows:
(1) Pull the front hub outward to insert the
driveshaft into the transaxle.
(2) Push the joint from the differential side to con-
nect the driveshaft to the differential side gear.
Caution
a) Do not damage the oil seal.
b) After installation, pull the front hub outward
to verify that the driveshaft does not come
out.
17. Install the lower arm ball joints to the knuckles and
tighten the bolts and nuts.
Tightening torque:
43—54 N-m (4.4—5.5 m-kg, 32—40 ft-lb)
18. Install the undercover.
19. Install the stabilizer bar control link as follows:
(1) Install the stabilizer bar control link.
(2) Adjust protrusion A to 20.1 mm (0.79 in).
(3) Tighten bolt B to the specified torque.
Tightening torque:
16—23 N-m (1.6—2.3 m-kg, 12—17 ft-lb)
86U07B-452
7B-218
Page 1085 of 1865
INSTALLATION 7B
86U07B-453
86U07B-454
76G07B-198
20. Install the tie-rod ends and cotter pins.
Tightening torque:
29—44 N-m (3.0—4.5 m-kg, 22—33 ft-lb)
21. Install the oil cooler outlet and inlet hoses.
22. Install the splash shields.
Tightening torque:
8—11 N-m (80—110 cm-kg, 69—95 in-lb)
23. Install the front wheels.
Tightening torque:
88—118 N-m (9—12 m-kg, 65—87 ft-lb)
24. Connect the throttle cable.
Note
Adjust the throttle cable with the oil pressure
test. (Refer to page 7B—75, 76)
25. Connect the selector cable.
Tightening torque:
Nut
29—39 N-m (3.0—4.0 m-kg, 22—29 ft-lb)
Bolts
16—22 N-m (1.6—2.3 m-kg, 12—17 ft-lb)
26. Connect the ground wires to the transaxle case.
Tightening torque:
8—11 N-m (80—115 cm-kg, 69—99 in-lb)
86U07B-456
7B—219