Page 2357 of 2389
REMOVAL AND INSTALLATION OF
POWER STEERING PUMP (VZV Series)
Remove and install the parts as shown.
VZV Series
± STEERINGPower Steering (Power Steering Pump)SR±31
Page 2358 of 2389
(MAIN POINTS OF REMOVAL AND
INSTALLATION)
1. DISCONNECT AND CONNECT PRESSURE LINE
Using SST, disconnect and connect the pressure line.
SST 09631±22020
HINT: When connecting, use a torque wrench with a ful-
crum length of 340 mm (13.39 in.).
(b) Loosen the through bolt and push the PS pump for-
ward.
(c) Remove the drive belt.
4. REMOVE PS PUMP WITH PRESSURE TUBE
Remove the adjusting bolt and through bolt, then remove
PS pump from the lower side of vehicle body. 2. DISCONNECT TIE ROD END RH
(a) Remove the cotter pin and nut.
(b) Using SST, disconnect the tie rod end RH.
SST 09628±62011
3. REMOVE DRIVE BELT
(a) Loosen the adjusting bolt.
5. REMOVE PRESSURE TUBE
± STEERINGPower Steering (Power Steering Pump)SR±32
Page 2359 of 2389
DISASSEMBLY OF POWER STEERING
PUMP
1. MOUNT POWER STEERING PUMP !N VISE
NOTICE: Do not tighten the vise too tight.
2. REMOVE PS PUMP PULLEY
(a) Using SST, remove the pulley set nut.
SST 09616±30020 (For SV Series)
SST 09616±22010 (For VZV Series)
(b) Remove the pulley and woodruff key.
3. (Ex. SV Series for USA)
REMOVE END PLATE
COMPONENTS
± STEERINGPower Steering (Power Steering PumpSR±33
Page 2360 of 2389
4. (SV Series)
REMOVE AIR CONTROL VALVE
(a) Remove the air control valve.
(b) Remove the union seat.
.
6. REMOVE FLOW CONTROL VALVE
(a) Remove the pressure port union.
(b) Remove the 0±ring from the union. 5. REMOVE SUCTION PORT UNION
(a) Remove the bolt and union.
(b) Remove the O±ring from the union.
7. REMOVE FLOW CONTROL SPRING SEAT
(a) Using snap ring pliers, remove the snap ring.(e) Remove the flow control valve and spring.
± STEERINGPower Steering (Power Steering PumpSR±34
Page 2361 of 2389
10. REMOVE PUMP SHAFT, CAM RING AND VANE
PLATES
(a) Remove the pump shaft with cam ring, vane plates
from the front housing.
(b) Remove the cam ring and ten vane plates from the
pump shaft.
(c) Remove the long straight pin from the front housing. 9. REMOVE REAR SIDE PLATE
(a) Using a plastic hammer, tap the shaft end and remove
the rear plate.
(b) Remove the O±ring from the rear plate.(b) Temporarily install a bolt to the seat and pull out the
seat.
(c) Remove the O±ring from the seat.
(b) Using a plastic hammer, tap out the rear housing and
wave washer.
(c) Remove the O±ring from the rear housing. 8. REMOVE REAR HOUSING
(a) Using two screwdrivers, remove the snap ring.
± STEERINGPower Steering (Power Steering Pump)SR±35
Page 2362 of 2389
11. REMOVE ROTOR AND FRONT PLATE
(a) Using a screwdriver, remove the snap ring.
(b) Remove the rotor and front plate from the pump shaft.
(c) Remove the two O±rings from the front plate.
(d) Using a pin punch and hammer, drive out the straight
pin.
± STEERINGPower Steering (Power Steering Pump)SR±36
Page 2363 of 2389

INSPECTION OF POWER STEERING
PUMP
1. MEASURE OIL CLEARANCE OF SHAFT AND BUSH-
ING
Using a micrometer and calipers, measure the oil clear-
ance.
Standard clearance: 0.01 = 0.03 mm
(0.0004 ± 0.0012 in.)
Maximum clearance: 0.07 mm (0.O028 in.)
If more than maximum, replace the entire power steering
pump.
2. INSPECT ROTOR AND VANE PLATES
(a) Using a micrometer, measure the height, thickness
and length of the vane plates.
Minimum height: 8.0 mm (0.315 in.)
Minimum thickness: 1.77 mm (0.0697 in.)
Minimum length: 14.97 mm (0.5894 in.)
(b) Using a feeler gauge, measure the clearance be-
tween the rotor groove and vane plate.
Maximum clearance: 0.03 mm (0.0012 in.)
If more than maximum, replace the vane plate and/or rotor
with one having the same mark stamped on the cam ring.
Inscribed mark: 1,2,3,4 or None
HINT: There are five vane lengths with the following ro-
tor and cam ring marks:
3. INSPECT FLOW CONTROL VALVE
(a) Coat the valve with power steering fluid and check
that it falls smoothly into the valve hole by its own
weight.
Rotor and cam
ring markVane lengthmm (in.)
± STEERINGPower Steering (Power Steering Pump)SR±37
Page 2364 of 2389
(b) Check the flow control valve for leakage.
Close.one of the holes and apply compressed air [4
±5 kg/crn
2 (57 ± 71 psi, 392 ± 490 kPa)] into the oppo-
site side, and confirm that air does not come out from
the end hole.
4. INSPECT FLOW CONTROL SPRING
Using a scale, measure the free length of the spring.
Spring length: 36 ± 38 mm (1.42 ± 1.49 in.)
If not within specification, replace the spring. If necessary, replace the valve with one having the
same letter as inscribed on the front housing.
Inscribed mark: A,6,C,6, E or F
5. IF NECESSARY, REPLACE OIL SEAL
A
(a) Using a screwdriver, pry out the oil seal.
(b) Using a socket wrench and hammer, drive in a new
oil seal.
± STEERINGPower Steering (Power Steering PumpSR±38