2006 LAND ROVER FRELANDER 2 service

[x] Cancel search: service

Page 2592 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publis hed: 11-May-2011
Side Panel Sheet Metal Repairs - Side PanelRemoval and Installation
Removal
CAUTION: The side panel must be MIG slot brazed to its reinforcement, which contains DP600, (Dual Ph

Page 2600 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publ is hed: 11-May-2011
Side Panel Sheet Metal Repairs - Side Panel Front Section
Removal and Installation
Removal
CAUTION: The side panel front section must be MIG slot brazed to its reinforcement,

Page 2607 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publ is hed: 11-May-2011
Side Panel Sheet Metal Repairs - A-Pillar Outer Panel
Removal and Installation
Removal
CAUTION: The A-Pillar outer panel must be MIG slot brazed to the reinforcement, which is

Page 2613 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publ is hed: 11-May-2011
Side Panel Sheet Metal Repairs - A-Pillar Reinforcement
Removal and Installation
Removal
• CAUTIONS:
 The A-Pillar reinforcement is DP600, (Dual Phase steel) and must be MIG

Page 2614 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual 4. NOTE: W here possible, holes should be drilled through the
A-Pillar reinforcement and the A-Pillar inner panel, (note that
the reinforcement panel is DP600, (Dual Phase), steel and a
HSS drill bit

Page 2617 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publ is hed: 11-May-2011
Side Panel Sheet Metal Repairs - B-Pillar Outer Panel
Removal and Installation
Removal
CAUTION: The B-Pillar outer panel must be MIG slot brazed to the B-Pillar reinforcement,

Page 2622 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Publ is hed: 11-May-2011
Side Panel Sheet Metal Repairs - B-Pillar Reinforcement
Removal and Installation
Removal
• CAUTIONS:
 The B-Pillar reinforcement is BH300, (Bake Hardened steel). It must be

Page 2623 of 3229

LAND ROVER FRELANDER 2 2006  Repair Manual Installation
1. Remove the B-Pillar reinforcement part from the ring frame
service panel. Mill out the spot welds using a HSS spot weld
drill bit.
2. Prepare the old and new panel joint surfaces.
3. O