SPARK PLUG (PLATINUM-TIPPED TYPE)
EM-191
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
SPARK PLUG (PLATINUM-TIPPED TYPE)PFP:22401
ComponentsNBS004P1
Removal and InstallationNBS004P2
REMOVAL
1. Remove ignition coil. Refer to EM-190, "IGNITION COIL" .
2. Remove spark plug with spark plug wrench (commercial service
tool).
CAUTION:
Do not drop or shock it.
INSPECTION AFTER REMOVAL
Use standard type spark plug for normal condition.
Hot type spark plug is suitable when fouling occurs with standard type spark plug under conditions such as:
Frequent engine starts
Low ambient temperatures
Cold type spark plug is suitable when spark plug knock occurs with standard type spark plug under conditions
such as:
Extended highway driving
Frequent high engine revolution
1. Ignition coil 2. Spark plug
PBIC1589E
SEM294A
MakeNGK
Standard typePLFR5A-11
Hot typePLFR4A-11
Cold typePLFR6A-11
Gap (Nominal) : 1.1 mm (0.043 in)
FUEL INJECTOR AND FUEL TUBE
EM-197
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Tighten mounting bolts in two steps in numerical order as
shown in the figure.
6. Connect fuel feed hose on engine side as follows: (Unless otherwise indicated, the installation to the
engine side and centralized under-floor piping side is exactly alike.)
a. Make sure no foreign substances are deposited in and around fuel tube and quick connector, and no dam-
age on them.
b. Thinly apply new engine oil around fuel tube from tip end to spool end.
c. Align center to insert quick connector straightly into fuel tube.
Engine side:
Insert fuel tube into quick connector until top spool is com-
pletely inside quick connector, and 2nd level spool exposes
right below quick connector.
CAUTION:
Hold “A” position as shown in the figure when inserting
fuel tube into quick connector.
Carefully align center to avoid inclined insertion to pre-
vent damage to O-ring inside quick connector.
Insert until you hear a “click” sound and actually feel the
engagement.
To avoid misidentification of engagement with a similar sound, be sure to perform the next step.
Centralized under-floor piping side:
Visually confirm that the two retainer tabs are connected to the connector.
CAUTION:
Carefully align center to avoid inclined insertion to prevent damage to O-ring inside quick con-
nector.
Insert until you hear a “click” sound and actually feel the engagement.
To avoid misidentification of engagement with a similar sound, be sure to perform the next step.
d. Pull quick connector by hand holding position. Make sure it is completely engaged (connected) so that it
does not come out from fuel tube.
e. Install quick connector cap on quick connector connection.
CAUTION:
If cap cannot be installed smoothly, quick connector may
have not been installed correctly. Check connection again.
f. Install fuel feed hose to hose clamps.
7. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Check on Fuel Leakage
1. Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
A : Right bank
B : Left bank
: Engine front
1st step : 10.1 Nꞏm (1.0 kg-m, 7 ft-lb)
2nd step : 23.5 Nꞏm (2.4 kg-m, 17 ft-lb)
PBIC3303E
KBIA0272E
SBIA0354E
ROCKER COVER
EM-199
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
ROCKER COVERPFP:13264
ComponentsNBS004P5
Removal and InstallationNBS004P6
REMOVAL
1. Remove engine room cover (RH and LH). Refer to EM-173, "ENGINE ROOM COVER" .
2. Remove engine cover with power tool. Refer to EM-179, "
INTAKE MANIFOLD" .
3. Refer to the following for incidental works related to left bank.
a. Remove air duct (inlet), air cleaner case and air duct and resonator assembly. Refer to EM-177, "
AIR
CLEANER AND AIR DUCT" .
b. Move harness on upper rocker cover and its peripheral aside.
c. Remove harness bracket from camshaft bracket (No. 6). Refer to EM-215, "
CAMSHAFT" .
d. Remove ignition coil. Refer to EM-190, "
IGNITION COIL" .
e. Remove PCV hose from PCV valve.
4. Refer to the following for incidental works related to right bank.
a. Move harness on upper rocker cover and its peripheral aside.
b. Remove ignition coil. Refer to EM-190, "
IGNITION COIL" .
c. Remove PCV hose from PCV valve.
5. Remove PCV valves and O-rings from rocker covers (right and left bank), if necessary.
6. Remove oil filler cap and oil catcher from rocker cover (right bank), if necessary.
7. Remove rocker cover (right bank) as follows:
a. Remove battery cover. Refer to EM-173, "
ENGINE ROOM COVER" .
1. Rocker cover (left bank) 2. PCV valve 3. O-ring
4. Rocker cover gasket (left bank) 5. Rocker cover (right bank) 6. PCV valve
7. O-ring 8. Oil filler cap 9. Oil catcher
10. Rocker cover gasket (right bank)
PBIC2353E
EM-204
[VK45DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
Removal and InstallationNBS004P8
REMOVAL
1. Remove engine assembly from vehicle. Refer to EM-244, "ENGINE ASSEMBLY" .
2. Remove the following components and related parts:
Drive belt auto tensioner and idler pulley; Refer to EM-176, "Drive Belt Auto Tensioner and Idler Pulley"
.
Thermostat housing and hoses; Refer to CO-55, "THERMOSTAT AND WATER CONTROL VALVE" .
Ignition coil; Refer to EM-190, "IGNITION COIL" .
Rocker cover; Refer to EM-199, "ROCKER COVER" .
3. If necessary, remove intake valve timing control position sensor
(right and left bank) and camshaft position sensor (PHASE) from
intake valve timing control cover and front cover.
CAUTION:
Handle carefully to avoid dropping and shocks.
Do not disassemble.
4. If necessary, remove intake valve timing control solenoid valve from intake valve timing control cover.
CAUTION:
Handle components and parts carefully to avoid dropping and shocks.
Do not disassemble.
Do not allow metal powder to adhere to magnetic part at sensor tip.
Do not place sensors in a location where they are exposed to magnetism.
1. Camshaft sprocket (EXH) 2. Camshaft sprocket (INT) 3. Camshaft sprocket (INT)
4. Camshaft sprocket (EXH) 5. Front cover 6.Intake valve timing control solenoid
valve (right bank)
7. O-ring 8. Seal ring 9.Intake valve timing control position
sensor (right bank)
10. O-ring 11.Intake valve timing control cover
(right bank)12.Intake valve timing control position
sensor (left bank)
13. O-ring 14.Intake valve timing control cover (left
bank)15. Seal ring
16.Intake valve timing control solenoid
valve (left bank)17. O-ring 18. Oil level gauge
19. Oil level gauge guide 20. O-ring 21. Crankshaft pulley bolt
22. Crankshaft pulley 23. Front oil seal 24. Chain tensioner cover
25. Camshaft position sensor (PHASE) 26. O-ring 27. Oil pump drive spacer
28. Oil pump assembly 29. Crankshaft sprocket 30. O-ring
31. O-ring 32.Timing chain tension guide
(right bank)33.Timing chain slack guide
(right bank)
34. Timing chain (right bank) 35. Timing chain (left bank) 36. Chain tensioner (left bank)
37. Chain tensioner (right bank) 38.Timing chain slack guide
(left bank)39.Timing chain tension guide
(left bank)
40. O-ring
PBIC0050E
EM-214
[VK45DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
f. Further tighten by 90 degrees. (Angle tightening)
Check the tightening angle by referencing to the notches. The
angle between two notches is 90 degrees.
15. Rotate crankshaft pulley in normal direction (clockwise when viewed from engine front) to confirm it turns
smoothly.
16. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in guide may gen-
erate a pounding noise during and just after engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
PBIC2346E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
CAMSHAFT
EM-221
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
4. Tighten camshaft bracket bolts in the following steps, in numeri-
cal order as shown in the figure.
a. Tighten No. 9 to 12 in numerical order as shown.
b. Tighten No. 1 to 8 in numerical order as shown.
c. Tighten No. 13 to 14 in numerical order as shown. (Left bank
only)
d. Tighten all bolts in numerical order as shown.
e. Tighten No. 1 to 12 in numerical order as shown.
f. Tighten No. 13 to 14 in numerical order as shown. (Left bank
only)
CAUTION:
After tightening mounting bolts of camshaft brackets, be sure to wipe off excessive liquid gasket
from the parts listed below.
Mating surface of rocker cover
Mating surface of front cover
5. Install camshaft sprockets.
Install by checking with identification mark on surface.
Instal camshaft sprocket (EXH) by selectively using the
groove of dowel pin according to the bank. (Common part
used for both banks.)
Lock the hexagonal part of camshaft in the same way as for
removal, and tighten mounting bolts.
6. Check and adjust the valve clearance. Refer to EM-222, "
Valve Clearance" .
7. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Inspection of Camshaft Sprocket (INT) Oil Groove
CAUTION:
Perform this inspection only when DTC P0011 and/or P0021 are detected in self-diagnostic results
of CONSULT-II and it is directed according to inspection procedure of EC section. Refer to EC-850,
"SELF-DIAG RESULTS MODE" .
Check when the engine is cold so as to prevent burns from any splashing engine oil.
1. Check the engine oil level. Refer toLU-26, "
ENGINE OIL" .
2. Perform the following procedure so as to prevent the engine from being unintentionally started while
checking.
a. Release fuel pressure. Refer toEC-809, "
FUEL PRESSURE RELEASE" .
b. Disconnect ignition coil and injector harness connectors.
3. Remove intake valve timing control solenoid valve. Refer to EM-203, "
TIMING CHAIN" . : 1.96 Nꞏm (0.2 kg-m, 1 ft-lb)
: 1.96 Nꞏm (0.2 kg-m, 1 ft-lb)
: 1.96 Nꞏm (0.2 kg-m, 1 ft-lb)
: 5.88 Nꞏm (0.6 kg-m, 4 ft-lb)
: 10.41 Nꞏm (1.1 kg-m, 8 ft-lb)
: 31.35 Nꞏm (3.2 kg-m, 23 ft-lb)
PBIC0031E
PBIC2345E
EM-222
[VK45DE]
CAMSHAFT
Revision: 2006 January2006 M35/M45
4. Crank the engine, and then make sure that engine oil comes out
from intake valve timing control cover oil hole. End crank after
checking.
WA R N I N G :
Be careful not to touch rotating parts (drive belt, idler pul-
ley, and crankshaft pulley, etc.).
CAUTION:
Engine oil may squirt from intake valve timing control sole-
noid valve installation hole during cranking. Use a shop
cloth to prevent the engine components and the vehicle. Do
not allow engine oil to get on rubber components such as
drive belt or engine mount insulators. Immediately wipe off
any splashed engine oil.
Clean oil groove between oil strainer and intake valve timing control solenoid valve if engine oil does not
come out from intake valve timing control cover oil hole. Refer to LU-24, "
LUBRICATION SYSTEM" .
5. Remove components between intake valve timing control solenoid valve and camshaft sprocket (INT),
and then check each oil groove for clogging.
Clean oil groove if necessary. Refer to LU-24, "LUBRICATION SYSTEM" .
6. After inspection, install removed parts.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in guide may gen-
erate a pounding noise during and just after engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
Valve ClearanceNBS004PB
INSPECTION
In cases of removing/installing or replacing camshaft and valve-related parts, or of unusual engine conditions
due to changes in valve clearance (found malfunctions during starting, idling or causing noise), perform
inspection as follows:
1. Remove rocker covers (right and left bank). Refer to EM-199, "
ROCKER COVER" .
PBIC2848E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
CYLINDER HEAD
EM-233
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
CYLINDER HEADPFP:11041
On-Vehicle ServiceNBS004PF
CHECKING COMPRESSION PRESSURE
1. Warm up engine thoroughly. Then, stop it.
2. Release fuel pressure. Refer to EC-809, "
FUEL PRESSURE RELEASE" .
a. Remove fuel pump fuse to avoid fuel injection during measure-
ment.
3. Remove engine cover with power tool. Refer to EM-173, "
ENGINE ROOM COVER" .
4. Remove ignition coil and spark plug from each cylinder. Refer to EM-190, "
IGNITION COIL" and EM-191,
"SPARK PLUG (PLATINUM-TIPPED TYPE)" .
5. Connect engine tachometer (not required in use of CONSULT-II).
6. Install compression gauge with adapter (SST or commercial ser-
vice tool) onto spark plug hole.
Use compression gauge adapter (SST) which is required on
No. 7 and 8 cylinders.
Use compression gauge adapter (if no SST is used) whose
picking up end inserted to spark plug hole is smaller than 20
mm (0.79 in) in diameter. Otherwise, it may be caught by cyl-
inder head during removal.
7. With accelerator pedal fully depressed, turn ignition switch to “START” for cranking. When the gauge
pointer stabilizes, read the compression pressure and engine rpm. Perform these steps to check each cyl-
inder.
Compression pressure:
Unit: kPa (kg/cm2 , psi) /rpm
CAUTION:
Always use a fully changed battery to obtain the specified engine speed.
PBIB1482E
PBIC1554E
SBIA0533E
Standard Minimum Deferential limit between cylinders
1,320 (13.5, 191) / 300 1,130 (11.5, 164) / 300 98 (1.0, 14) / 300