2006 DODGE RAM SRT-10 ignition

[x] Cancel search: ignition

Page 1421 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 3.(K25) BATT TEMP SIGNAL CIRCUIT SHORTED TO VOLTAGE
Turn the ignition off.
Disconnect the PCM harness connectors.
Ignition on, engine not running.
Measure the voltage on the (K25) Battery Temp Signal

Page 1424 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual When Monitored:
With the ignition on.
Set Condition:
The PCM senses the voltage from the Battery Temperature Sensor below 0.5 ofa volt for 3 seconds.
Possible Causes
BATTERY TEMP SENSOR VOLTAGE BELOW

Page 1427 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual When Monitored:
Immediately after a cold start, with battery/ambient temperature between 40 Deg. F and 90 Deg. F and coolant
temperature within 10 Deg. F of battery/ambient.
Set Condition:
The state o

Page 1428 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 3.LDP VACUUM SUPPLY
Turn the ignition off.
Disconnect the vacuum supply hose at the Leak Detection Pump.
Connect a vacuum gauge to the disconnected vacuum supply hose at the Leak Detection Pump.
Start

Page 1429 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 5.(K107) LDP SWITCH SENSE CIRCUIT OPEN
Turn the ignition off.
Disconnect the PCM harness connectors.
Measure the resistance of the (K107) LDP Switch Sense circuit from the
PCM harness connector to LDP

Page 1431 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual When Monitored:
Continuously when the ignition is on and battery voltage is greater than 10.4 volts.
Set Condition:
The state of the solenoid circuit does not match the PCM’s desired state.
Possible

Page 1432 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 3.(K125) GENERATOR SOURCE CIRCUIT OPEN
Turn the ignition off.
Disconnect the Leak Detection Pump electrical harness connector.
Ignition on, engine not running.
With the scan tool, actuate the Leak Det

Page 1433 of 5267

DODGE RAM SRT-10 2006  Service Repair Manual 5.(K107) LDP SWITCH SIGNAL CIRCUIT OPEN
Turn the ignition off.
Disconnect the PCM harness connectors.
Measure the resistance of the (K107) LDP Switch Signal circuit from the
PCM harness connector to L