030G6±04
±
SERVICE SPECIFICATIONS POWER STEERING
03±59
AVENSIS REPAIR MANUAL (RM1018E)
POWER STEERING
SERVICE DATA
POWER STEERING FLUID
Fluid level rise Maximum5 mm (0.20 in.)
Fluid pressure at idle speed with valve closedAZ Series:
1CD±FTV:8,300 to 9,000 kPa (85 to 92 kgf/cm2, 1,204 to 1,305 psi)
8,800 to 9,500 kPa (90 to 97 kgf/cm2, 1,276 to 1,378 psi)
STEERING WHEEL
Steering effort at idle speed (Reference)5.5 N´m (56 kgf´cm, 49 in.´lbf)
VANE PUMP ASSY
Vane pump rotating torque0.27 N´m (2.8 kgf´cm, 2.4 in.´lbf) or less
Vane pump shaft and vane pump housing oil clearance Maximum0.07 mm (0.0028 in.)
Vane plate thickness Minimum1.405 to 1.411 mm (0.05531 to 0.05555 in.)
Clearance between the rotor groove and plateMaximum0.03 mm (0.0012 in.)
Spring free length Minimum36.9 mm (1.453 in.)
STEERING GEAR ASSY
Total preload (Tie rod rotating torque) (Turning)0.29 to 1.96 N´m (3 to 20 kgf´cm, 2.57 to 17.35 in.´lbf)
Total preload (Control valve rotating torque)(Turning)0.6 to 1.1 N´m (6 to 11 kgf´cm, 5.3 to 9.7 in.´lbf)
RACK & PINION POWER STEERING GEAR ASSY
Total preload (Tie rod rotating torque) (Turning)0.49 to 3.43 N´m (5 to 35 kgf´cm, 4.34 to 30.38 in.´lbf)
http://vnx.su
11±80
±
FUEL COMMON RAIL ASSY (1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
(c) Using SST, tighten the nut of the injection pipe to the com- mon rail side.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(d) Using SST, tighten the nut of the injection pipe to the injec- tor side.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e) Install the 2 upper injection pipe clamps with the 2 nuts. Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
16. INSTALL INJECTION PIPE SUB±ASSY NO.2 SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
17. INSTALL INJECTION PIPE SUB±ASSY NO.3 SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
18. INSTALL INJECTION PIPE SUB±ASSY NO.4
SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
http://vnx.su
A79149
30 cm
(11.81 in.)
SST
±
FUELCOMMON RAIL ASSY(1CD±FTV)
11±81
AVENSIS REPAIR MANUAL (RM1018E)
19.INSTALL FUEL INLET PIPE SUB±ASSY
NOTICE:
In case of having the common rail replaced, must re-
place fuel inlet pipe, too.
When assembling the pipe, perform the operation
with the engine cold under room temperature.
(a)Temporarily install the fuel inlet pipe.
(b)Using SST, tighten the nut of the fuel inlet pipe to the com-
mon rail side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
(c)Using SST, tighten the nut of the fuel inlet pipe to the injec-
tion pump side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
20.INSTALL RADIATOR RESERVE TANK ASSY(See page 16±50)
21. INSTALL ENGINE COVER NO.1 Torque: 8.0 N m (82 kgf cm, 71 in. lbf)
22.ADD ENGINE COOLANT(See page 16±44)
23.CHECK FOR ENGINE COOLANT LEAKS(See page 16±37)
24.CHECK FOR FUEL LEAKS(See page 11±60)
http://vnx.su
A81618
Push
2
1Retainer
A77857
A78440
New Gasket
A77857
±
FUEL FUEL TANK ASSY (GASOLINE)
11±99
AVENSIS REPAIR MANUAL (RM1018E)
30. CONNECT FUEL TANK MAIN TUBE SUB±ASSY
(a) Push in the fuel tube connector to the pipe until it makes
ºclickº sound, and then push up the retainer to the claws
lock.
NOTICE:
Check if there is any damage or foreign objects on the
connected part.
After connecting, check if the fuel tube connector and
the pipe are securely connected by pulling on them.
31. CONNECT FUEL TANK RETURN TUBE (1AZ±FSE ENGINE TYPE)
32. CONNECT FUEL TANK TO FILLER PIPE HOSE
33. CONNECT BREATHER TUBE FUEL HOSE
34. INSTALL PARKING BRAKE CABLE ASSY NO.3
Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
35. INSTALL PARKING BRAKE CABLE ASSY NO.2
Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
36. INSTALL FUEL TANK PROTECTOR NO.1 Torque: 5.4 N m (55 kgf cm, 48 in. lbf)
37. INSTALL EXHAUST PIPE ASSY CENTER (1ZZ±FE/3ZZ±FE ENGINE TYPE)
(a) Compression spring inspection (1) Using vernier calipers, measure the free length ofthe compression spring.
Minimum length:
41.5 mm (1.634 in.) for front x manifold
38.5 mm (1.516 in.) for front x tail
If the free length is less than minimum, replace the compression
spring.
(b) Install each new gasket to the exhaust manifold and the
exhaust pipe front as shown in the illustration.
(c) Install the exhaust pipe front to the 2 exhaust pipe sup- ports
(d) Tighten the 4 compression springs and 4 bolts. Torque: 43 N m (440 kgf cm, 32 ftlbf)
(e) Install the grommet. (w/o HID Sensor)
(f) Connect the heated oxygen sensor connector.
(g) Install the floor carpet with the 2 clips. (w/o HID Sensor)
38. INSTALL EXHAUST PIPE ASSY CENTER (1AZ±FE/1AZ±FSE ENGINE TYPE)
(a) Compression spring inspection
(1) Using vernier calipers, measure the free length ofthe compression spring.
Minimum length: 38.5 mm (1.516 in.)
If the free length is less than minimum, replace the compression
spring.
http://vnx.su
A79147
Fulcrum
Length
30 cm
SST
±
FUEL INJECTION OR SUPPLY PUMP ASSY (1CD±FTV)
11±73
AVENSIS REPAIR MANUAL (RM1018E)
(c) Using SST, tighten the nut of the injection pipe to the com-
mon rail side.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(d) Using SST, tighten the nut of the injection pipe to the injec- tor side.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e) Install the 2 upper injection pipe clamps with the 2 nuts. Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
43. INSTALL INJECTION PIPE SUB±ASSY NO.2 SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
44. INSTALL INJECTION PIPE SUB±ASSY NO.3 SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
45. INSTALL INJECTION PIPE SUB±ASSY NO.4
SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
http://vnx.su
A79149
SST
30 cm
(11.81 in.)
11±74
±
FUELINJECTION OR SUPPLY PUMP ASSY(1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
46.INSTALL FUEL INLET PIPE SUB±ASSY
NOTICE:
In case of having the injection pump replaced, must
replace the fuel inlet pipe, too.
When assembling the pipe, perform the operation
with the engine cold under room temperature.
(a)Temporarily install the fuel inlet pipe.
(b)Using SST, tighten the nut of the fuel inlet pipe to the com-
mon rail side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
(c)Using SST, tighten the nut of the fuel inlet pipe to the injec-
tion pump side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
47.SET NO. 1 CYLINDER TO TDC/COMPRESSION(See page 14±307) SST 09960±10010 (09962±01000, 09963±01000)
48.INSTALL TIMING BELT(See page 14±307)
49.CHECK VALVE TIMING(See page 14±307)
50.INSTALL TIMING CHAIN COVER PLATE(See page 14±307)
51. INSTALL TRANSVERSE ENGINE ENGINE MOUNTING BRACKET Torque:
37 Nm (375 kgf cm, 27 ftlbf) for 14mm head bolt
64 N m (650 kgf cm, 47 ftlbf) for 17mm head bolt
http://vnx.su
A79147
SST
30 cm
(11.81 in.)
11±64
±
FUELINJECTOR ASSY(1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
20.INSTALL NOZZLE HOLDER SEAL
(a)Install new 4 nozzle holder seals.
21.INSTALL TIMING BELT NO.2 COVER(See page 14±307) 22. INSTALL INJECTION PIPE SUB±ASSY NO.1
NOTICE:
In case of having the injectors replaced, must replace
the injection pipes, too.
When assembling the pipes, perform the operation
with the engine cold under room temperature.
(a) Remove the vinyl or the plastic bag from the injector and
vinyl tape from the common rail.
(b) Temporarily install the injection pipe.
(c) Using SST, tighten the nut of the injection pipe to the com- mon rail.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(d) Using SST, tighten the nut of the injection pipe to the injec- tor.
SST 09023±12700
Torque:
42 Nm (428 kgf cm, 31 ftlbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ftlbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e) Install the 2 upper injection pipe clamps with the 2 nuts. Torque: 5.0 N m (51 kgf cm, 44 in. lbf)
http://vnx.su
A79147
Fulcrum
Length
30 cm
SST
14±324
±
ENGINE MECHANICALCAMSHAFT(1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
(c)Using SST, tighten the nut of the injection pipe to the com- mon rail side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(d)Using SST, tighten the nut of the injection pipe to the injec- tor side.
SST09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 N m (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgf cm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e)Install the 2 upper injection pipe clamps with the 2 nuts. Torque: 5.0 N m (51 kgfcm, 44 in. lbf)
54.INSTALL INJECTION PIPE SUB±ASSY NO.2 SST09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
55.INSTALL INJECTION PIPE SUB±ASSY NO.3 SST09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
56.INSTALL INJECTION PIPE SUB±ASSY NO.4
SST09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
57.INSTALL TIMING BELT(See page 14±307)
58.CHECK VALVE TIMING(See page 14±307)
http://vnx.su