1999 DODGE NEON key

[x] Cancel search: key

Page 138 of 1200

DODGE NEON 1999  Service Repair Manual (9) InstallA NEWhub and bearing assembly
retaining nut. Torque the hub and bearing assembly
retaining nut to 168 N´m (124 ft. lbs.).
(10) Install hub and bearing assembly dust cap.
(11) Install rear

Page 146 of 1200

DODGE NEON 1999  Service Repair Manual If old brake shoe return or hold down springs have
overheated or are damaged, replace. Overheating
indications are paint discoloration or distorted end
coils.
REAR DRUM BRAKE WHEEL CYLINDER
With brake

Page 156 of 1200

DODGE NEON 1999  Service Repair Manual cally cleared from the CAB memory after the identi-
cal fault has not been seen during the next 255 key
cycles of vehicle operation.
CONTROLLER ANTILOCK BRAKE INPUTS
²Four wheel speed sensors.
²Stop

Page 159 of 1200

DODGE NEON 1999  Service Repair Manual ABS DIAGNOSTIC TROUBLE CODES
Diagnostic trouble codes (DTC) are kept in the con-
trollers memory until either erased by the technician
using the DRB or erased automatically after 3500
miles or 255 ke

Page 160 of 1200

DODGE NEON 1999  Service Repair Manual A visual inspection for loose, disconnected, or mis-
routed wires should be done before attempting to
diagnose or service the ITT Teves Mark 20 antilock
brake system. A visual inspection will eliminat

Page 161 of 1200

DODGE NEON 1999  Service Repair Manual malfunction has occurred with one of the proportion-
ing valves (Fig. 15).
One proportioning valve (Fig. 16) controls the right
rear brake, and the other proportioning valve con-
trols the left rear b

Page 174 of 1200

DODGE NEON 1999  Service Repair Manual CLUTCH PEDAL POSITION
SWITCH±MECHANICAL TEST
With the park brake set and the vehicleIN NEU-
TRAL,turn the key to the start position. The vehicle
should not crank. If the vehicle cranks, the switch is

Page 218 of 1200

DODGE NEON 1999  Service Repair Manual BATTERY
CONTENTS
page page
GENERAL INFORMATION
INTRODUCTION......................... 1
DESCRIPTION AND OPERATION
BATTERY IGNITION OFF DRAW (IOD)........ 1
CHARGING TIME REQUIRED............... 1
DIAGN
Page:   1-8 9-16 17-24 25-32 33-40 ... 96 next >