(c)  Using a brass bar and hammer, stake the washer.
NOTICE: Avoid any impact to the rack.
16.  INS TALL RH AND LH RACK BO O TS , CLAMP S AND
CLIPS
(a) Ensure that the steering rack hole is not clogged with grease.
HINT: If the hole is clogged, the pressure inside the boot will
change  after it is assembled and the steering wheel turned.
(b)  Install the boot.
NOTICE: Be careful not to damage or twist the boot.
(c)  Install the clamp and clip to the boot.
HINT: When the rack guide spring cap is towards you, install
the clip and clamp in the positions shown in the illustration.
17.  INSTALL TIE ROD ENDS
(a)  Screw the lock nut and tie rod end onto the rack end until the
matchmarks are aligned.
(b)  After adjusting toe±in, torque the nut.
Torque: 56 NVm (570 kgfVcm, 41 ftVlbf)
18.  INSTALL TURN PRESSURE TUBES
(a)  Install 2 new union seats.
(b)  Using SST, install the 2 tubes.
SST 09633±00020
Torque: 24 NVm (243 kgfVcm, 17 ftVlbf)
HINT: Use a torque wrench with a fulcrum length of 300 mm
(11.81 in.)
(c)  Torque the 2 union bolts over 4 new gaskets.
Torque: 34 NVm (350 kgfVcm, 25 ftVlbf)
POWER STEERING GEAR
INSTALLATION
1.  INSTALL POWER STEERING GEAR ASSEMBLY
(a)  Temporarily install the 2 bolts and nuts.
(b)  After installing the rack housing bracket and grommet, torque
the 2 bolts and nuts.
Torque: 75 NVm (770 kgfVcm, 55 ftVlbf)
± STEERINGPOWER STEERING GEARSR±45