Is the voltage 9.6 V or more?
YES >> Ready for use.
NO >> GO TO 6.
6.QUICK CHARGE
1. Perform quick charge. Time required: 45 min. Refer to PG-107, "
Quick Charge".
2. Test using load tester.
Is the voltage 9.6 V or more?
YES >> Ready for use.
NO >> Replace battery.
7. QUICK CHARGE
1. Perform quick charge. Refer to PG-107, "
Quick Charge".
2. Perform capacity test.
Test using battery checker.>>GO TO 8.
Test using load tester.>>GO TO 10.
8.CAPACITY TEST
Test using battery checker.
Is the battery usable, according to the manufacturer
’s instructions?
YES >> Ready for use.
NO >> GO TO 9.
9.CHECKING SPECIFIC GRAVITY
1. Check specific gravity. Refer to PG-3, "
How to Handle Battery".
2. Perform recharge. Refer to PG-107, "
Quick Charge".
NOTE:
If battery temperature rises above 55°C (131°F), stop charging. Always charge battery when its tempera-
ture is below 55°C (131°F).
3. Test using battery checker.
Is the battery usable, according to the manufacturer
’s instructions?
YES >> Ready for use.
NO >> Replace battery.
10.CAPACITY TEST
1. Test using load tester.
2. Check battery type and determine the specified current using the table.
Discharging Current (Load Tester)
Type Current (A)
28B19R(L) 90
34B19R(L) 99
46B24R(L)
135
55B24R(L)
50D23R(L) 150
55D23R(L) 180
80D23R(L)
195 65D26R(L)
80D26R(L)
75D31R(L) 210
95D31R(L)
240 115D31R(L)
025 [YUASA type code]
PG-8
< BASIC INSPECTION >[POWER SUPPLY&GROUND CIRCUIT]
BATTERY
3. Read load tester voltage when specified discharging current flows through battery for 15 seconds.
Is the voltage 9.6 V or more?
YES >> Ready for use.
NO >> GO TO 11.
11 .CHECKING SPECIFIC GRAVITY
1. Check specific gravity. Refer to PG-3, "
How to Handle Battery".
2. Perform recharge. Refer to PG-107, "
Quick Charge".
NOTE:
If battery temperature rises above 55°C (131°F), stop charging. Always charge battery when its tempera-
ture is below 55°C (131°F).
3. Test using load tester.
Is the voltage 9.6 V or more?
YES >> Ready for use.
NO >> Replace battery.
12. STANDARD CHARGE
NOTE:
“STANDARD CHARGE” is recommended if the vehicle is in storage after charging.
1. Perform standard charge. Refer to PG-106, "
Standard Charge".
2. Perform capacity test.
Test using battery checker.>>GO TO 14.
Test using load tester.>>GO TO 15.
13. SLOW CHARGE
1. Perform slow charge. Refer to PG-105, "
Slow Charge".
2. Perform capacity test.
Test using battery checker.>>GO TO 14.
Test using load tester.>>GO TO 15.
14.CAPACITY TEST
Test using battery checker.
Is the battery usable, according to the manufacturer
’s instructions?
YES >> Ready for use.
NO >> Replace battery.
15.CAPACITY TEST
1. Test using load tester.
2. Check battery type and determine the specified current using the table.
Discharging Current (Load Tester)
027 [YUASA type code] 285
110D26R(L)
300
95E41R(L)
067 [YUASA type code] 325
130E41R(L) 330
096 [YUASA type code] 375Type Current (A)
Type Current (A)
28B19R(L) 90
34B19R(L) 99
46B24R(L)
135
55B24R(L)
PG
BATTERY
PG-9
< BASIC INSPECTION >[POWER SUPPLY&GROUND CIRCUIT]
C
D
E
F
G
H
I
J
K
L B A
O
P N
3. Read load tester voltage when specified discharging current flows through battery for 15 seconds.
Is the voltage 9.6 V or more?
YES >> Ready for use.
NO >> Replace battery.
50D23R(L) 150
55D23R(L) 180
80D23R(L)
195 65D26R(L)
80D26R(L)
75D31R(L) 210
95D31R(L)
240 115D31R(L)
025 [YUASA type code]
027 [YUASA type code] 285
110D26R(L)
300
95E41R(L)
067 [YUASA type code] 325
130E41R(L) 330
096 [YUASA type code] 375Type Current (A)
PG
BATTERY CHARGING CHART
PG-105
< ON-VEHICLE MAINTENANCE >[POWER SUPPLY&GROUND CIRCUIT]
C
D
E
F
G
H
I
J
K
L B A
O
P N
ON-VEHICLE MAINTENANCE
BATTERY CHARGING CHART
Slow ChargeINFOID:0000000003809462
1.DETERMINE INITIAL CHARGING CURRENT
1. Determine initial charging current from specific gravity.
2. Check battery type and determine the specified current using the table.
NOTE:
After starting charging, adjustment of charging current is not necessary.
Initial Charging Current Setting (Slow Charge)
>> GO TO 2.
2.CHARGE BATTERY
1. Charge battery.
2. Check charge voltage 30 minutes after starting the battery charge.
Is the voltage between 12 V and 15 V?
YES >> GO TO 3.
NO >> Replace battery.
3.CHARGE BATTERY
Continue to charge for 12 hours.
>> GO TO 4.
4.CHECKING SPECIFIC GRAVITY
Check specific gravity. Refer to PG-3, "
How to Handle Battery".
Is the specific gravity 1.240 or more?
YES >> Complete slow charge. Perform “CAPACITY TEST”. Refer to PG-5, "Work Flow".
NO >> GO TO 5.
5.CONDUCT ADDITIONAL CHARGE
Add charging time depending on specific gravity.
Additional Charge (Slow Charge)
>> Complete slow charge. Perform “CAPACITY TEST”. Refer to PG-5, "Work Flow".
CAUTION:
CONVERTED
SPECIFIC
GRAVITYBATTERY TYPE
28B19R(L)
34B19R(L)
46B24R(L)
55B24R(L)
50D23R(L)
55D23R(L)
025 [YUASA type code]
027 [YUASA type code]
80D23R(L)
65D26R(L)
80D26R(L)
067 [YUASA type code]
096 [YUASA type code]
75D31R(L)
95D31R(L)
115D31R(L)
110D26R(L)
95E41R(L)
130E41R(L)
Below 1.100 4.0 (A) 5.0 (A) 7.0 (A) 8.0 (A)8.5
(A)9.0
(A)10.0 (A)14.0
(A)
SPECIFIC GRAVITY CHARGING TIME (h)
Below 1.150 5
1.150 - 1.200 4
1.200 - 1.240 2
PG-106
< ON-VEHICLE MAINTENANCE >[POWER SUPPLY&GROUND CIRCUIT]
BATTERY CHARGING CHART
Set charging current to value specified in “Initial Charging Current Setting (Slow Charge)”. If charger
is not capable of producing specified current value, set its charging current as close to that value as
possible.
Keep battery away from open flame while it is being charged.
When connecting charger, connect leads first, then turn on charger. Never turn on charger first, as
this may cause a spark.
If battery temperature rises above 55°C (131°F), stop charging. Always charge battery when its tem-
perature is below 55°C (131°F).
Standard ChargeINFOID:0000000003809463
1.DETERMINE INITIAL CHARGING CURRENT
1. Determine initial charging current from specific gravity.
2. Check battery type and determine the specified current using the table.
NOTE:
After starting charging, adjustment of charging current is not necessary.
Initial Charging Current Setting (Standard Charge)
>> GO TO 2.
2.CHARGE BATTERY
Charge battery for 8 hours.
>> GO TO 3.
3.CHECKING SPECIFIC GRAVITY
Check specific gravity. Refer to PG-3, "
How to Handle Battery".
Is the specific gravity 1.240 or more?
YES >> Complete standard charge. Perform “CAPACITY TEST”. Refer to PG-5, "Work Flow".
NO >> GO TO 4.
4.CONDUCT ADDITIONAL CHARGE
Add charging time depending on specific gravity.
Additional Charge (Standard Charge)
CONVERTED SPECIFIC
GRAVITYBATTERY TYPE
28B19R(L)
34B19R(L)
46B24R(L)
55B24R(L)
50D23R(L)
55D23R(L)
025 [YUASA type code]
027 [YUASA type code]
80D23R(L)
65D26R(L)
80D26R(L)
067 [YUASA type code]
096 [YUASA type code]
75D31R(L)
95D31R(L)
115D31R(L)
110D26R(L)
95E41R(L)
130E41R(L)
1.100 - 1.130 4.0 (A) 5.0 (A) 6.0 (A) 7.0 (A)8.0
(A)9.0 (A)13.0
(A)
1.130 - 1.160 3.0 (A) 4.0 (A) 5.0 (A) 6.0 (A)7.0
(A)8.0 (A)11 . 0
(A)
1.160 - 1.190 2.0 (A) 3.0 (A) 4.0 (A) 5.0 (A)6.0
(A)7.0 (A)9.0
(A)
1.190 - 1.220 2.0 (A) 2.0 (A) 3.0 (A) 4.0 (A)5.0
(A)5.0 (A)7.0
(A)
SPECIFIC GRAVITY CHARGING TIME (h)
Below 1.150 3.5
1.150 - 1.200 2.5
1.200 - 1.240 1.5
PG
BATTERY CHARGING CHART
PG-107
< ON-VEHICLE MAINTENANCE >[POWER SUPPLY&GROUND CIRCUIT]
C
D
E
F
G
H
I
J
K
L B A
O
P N
>> Complete standard charge. Perform “CAPACITY TEST”. Refer to PG-5, "Work Flow".
CAUTION:
Never use standard charge method on a battery whose specific gravity is less than 1.100.
Set charging current to value specified in “Initial Charging Current Setting (Standard Charge)”. If
charger is not capable of producing specified current value, set its charging current as close to that
value as possible.
Keep battery away from open flame while it is being charged.
When connecting charger, connect leads first, then turn on charger. Never turn on charger first, as
this may cause a spark.
If battery temperature rises above 55°C (131°F), stop charging. Always charge battery when its tem-
perature is below 55°C (131°F).
Quick ChargeINFOID:0000000003809464
1.DETERMINE INITIAL CHARGING CURRENT
1. Determine initial charging current setting and charging time from specific gravity.
2. Check battery type and determine the specified current using the table.
NOTE:
After starting charging, adjustment of charging current is not necessary.
Initial Charging Current Setting and Charging Time (Quick Charge)
CAUTION:
Never use quick charge method on a battery whose specific gravity is less than 1.100.
Set initial charging current to value specified in “Initial Charging Current Setting and Charging Time
(Quick Charge)”. If charger is not capable of producing specified current value, set its charging cur-
rent as close to that value as possible.
Keep battery away from open flame while it is being charged.
When connecting charger, connect leads first, then turn on charger. Never turn on charger first, as
this may cause a spark.
Be careful of a rise in battery temperature because a large current flow is required during quick-
charge operation.
If battery temperature rises above 55°C (131°F), stop charging. Always charge battery when its tem-
perature is below 55°C (131°F).
Never exceed the charging time specified in “Initial Charging Current Setting and Charging Time
(Quick Charge)”, because charging battery over the charging time can cause deterioration of the
battery.
BATTERY TYPE
28B19R(L)
34B19R(L)
46B24R(L)
55B24R(L)
50D23R(L)
55D23R(L)
80D23R(L)
65D26R(L)
80D26R(L)
025 [YUASA type code]
027 [YUASA type code]
067 [YUASA type code]
096 [YUASA type code]
75D31R(L)
95D31R(L)
115D31R(L)
110D26R(L)
95E41R(L)
130E41R(L)
CURRENT [A] 10 15 20 25 30 40
CONVERTED SPECIFIC GRAVITY
1.100 -
1.1302.5 hours
1.130 -
1.1602.0 hours
1.160 -
1.1901.5 hours
1.190 -
1.2201.0 hour
Above
1.2200.75 hour (45 min.)
PG-108
< ON-VEHICLE MAINTENANCE >[POWER SUPPLY&GROUND CIRCUIT]
BATTERY CHARGING CHART
>> GO TO 2.
2.CHARGE BATTERY
Charge battery.
>> Complete quick charge. Perform “CAPACITY TEST”. Refer to PG-5, "
Work Flow".
TM-142
< ON-VEHICLE MAINTENANCE >[CVT: RE0F09B]
CVT FLUID
ON-VEHICLE MAINTENANCE
CVT FLUID
InspectionINFOID:0000000003849076
CHECKING CVT FLUID
The fluid level should be checked with the fluid warmed up to 50 to 80°C (122 to 176°F). The fluid level check
procedure is as follows:
1. Check for fluid leakage.
2. With the engine warmed up, drive the vehicle in an urban area.
When ambient temperature is 20°C (68°F), it takes about 10
minutes for the CVT fluid to warm up to 50 to 80°C (122 to
176°F).
3. Park the vehicle on a level surface.
4. Apply parking brake firmly.
5. With engine at idle, while depressing brake pedal, move shift
selector throughout the entire shift range.
6. Pull out the CVT fluid level gauge from the CVT fluid charging
pipe after pressing the tab on the CVT fluid level gauge to
release the lock.
7. Wipe fluid off the CVT fluid level gauge. Insert the CVT fluid
level gauge rotating 180° from the originally installed position,
then securely push the CVT fluid level gauge until it meets the
top end of the CVT fluid charging pipe.
CAUTION:
When wiping away the CVT fluid level gauge, always use
lint-free paper, not a cloth rag.
8. Place the selector lever in “P” or “N” and check that the fluid
level is within the specified range.
CAUTION:
When reinstalling CVT fluid level gauge, insert it into the
CVT fluid charging pipe and rotate it to the original installa-
tion position until securely locked.
CVT FLUID CONDITION
SMA146B
SCIA1933E
SCIA1931E
SCIA1932E