Page 747 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 748 of 2490
12. Reconnect the air cleaner cover.
Fit the five clips which secu re the air cleaner cover.
13. Connect the intake tube to the throttle body.
1. Connect the intake tube to the throttle body.
2. Fit the two bolts which secure the intake tube to the throttle body.
14. Reconnect the air flow meter multi-plug.
15. Fit a new strap to secure the vacuum pipe to the induction
elbow.
16. Connect the breather pipe to the A-Bank camshaft cover.
1. Fit a new O-ring seal to the breather pipe.
2. Reconnect the breather pipe to the stub pipe.
17. Refill the cooling system. Refer to Operation (SC) (26.10.01).
18. Connect the battery and fit the battery cover.
Page 862 of 2490
Engine - Valve Cover RH
In-vehicle Repair
Removal
1. Open the engine compartment and fit paintwork protection
sheets.
2. Disconnect the intake tube from the throttle body.
1. Remove the two bolts which secure the intake tube to the throttle body.
2. Disconnect the intake tube from the throttle body.
3. Disconnect the air cleaner cover.
Release the five clips which se cure the air cleaner cover.
4. Disconnect the air fl ow meter multi-plug.
5. Remove the intake tube / air flow meter / air cleaner cover
assembly.
1. Remove the intake tube / air flow meter / air cleaner
cover assembly.
2. Remove and discard the ru bber seal; air intake tube
to throttle body.
6. Carefully remove the right hand engine cover, taking care not
to damage the plastic fixi ngs or the rubber inserts.
7. Remove the on-plug ignition coils from the 'A' bank. Refer to
Operation 18.20.41.
8. Release the clips which secure the engine harness to the cam
cover.
Page 865 of 2490
6. Reposition the clips which secure the engine harness to the
cam cover.
7. Refit the on-plug ignition coils and the coil cover. Refer to
Operation 18.20.41.
8. Refit the right hand engine cover.
9. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
10. Reconnect the air cleaner cover.
Fit the five clips which secu re the air cleaner cover.
11. Connect the intake tube to the throttle body.
1. Connect the intake tube to the throttle body.
Page 866 of 2490
2. Fit the two bolts which secure the intake tube to the throttle body.
12. Remove the paintwork protection sheets and close the engine
compartment.
Page 867 of 2490

Engine - Valve Cover Gasket LH
In-vehicle Repair
Removal
1. Open the engine compartment and fit paintwork protection
sheets.
2. Carefully remove the le ft hand engine cover, taking care not to
damage the plasti c fixings or the rubber inserts.
3. Disconnect the intake tube from the throttle body.
1. Remove the two bolts which secure the intake tube to the throttle body.
2. Disconnect the intake tube from the throttle body.
4. Disconnect the air cleaner cover.
Release the five clips which se cure the air cleaner cover.
5. Disconnect the air fl ow meter multi-plug.
6. Remove the intake tube / air flow meter / air cleaner cover
assembly.
1. Remove the intake tube / air flow meter / air cleaner
cover assembly.
2. Remove and discard the ru bber seal; air intake tube
to throttle body.
7. Remove the on-plug ignition coils from the 'B' bank. Refer to
Operation 18.20.42.
8. Remove the purge valve, from th e evaporative control system.
Refer to Operation 17.45.01.
9. Release the four clips which secure the engine harness to the
cam cover.
Page 870 of 2490
6. Reposition the clips which secure the engine harness to the
cam cover.
7. Refit the on-plug ignition coils and the coil cover. Refer to
Operation 18.20.42.
8. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
9. Reconnect the air cleaner cover.
Fit the five clips which secu re the air cleaner cover.
10. Connect the intake tube to the throttle body.
1. Connect the intake tube to the throttle body.
2. Fit the two bolts which secure the intake tube to the
Page 871 of 2490
throttle body.
11. Refit the purge valve. Refer to Operation 17.45.01.
12. Reconnect the air flow meter multi-plug.
13. Refit the left hand engine cover.
14. Remove the paintwork protection sheets and close the engine
compartment.