1998 JAGUAR X308 fuel pump

[x] Cancel search: fuel pump

Page 1031 of 2490

JAGUAR X308 1998 2.G Workshop Manual C2: CHECK THE FUEL 
PUMP 2 RELAY TO ECM CIRCUIT
Di

sconnect the battery negative terminal. 
1
 
D
 isconnect the ECM electrical connector, EM13. 
2
 
Meas
 ure the resistance between the rela
y base,

Page 1067 of 2490

JAGUAR X308 1998 2.G Workshop Manual Pinpoint Tests 
DT
C
De
 scription
Possib
 le Source
Acti
 on
P1245Engine 

crank signal low 
voltage
Starter relay 
 coil to 
ECM/BPM circuit open 
circuit  
F
 or starter relay circuit tests,GO t

Page 1078 of 2490

JAGUAR X308 1998 2.G Workshop Manual • NO
 TE: When performing electrical voltag
e or resistance tests, always use a digital multimeter (DMM) accurate to 3 
decimal places, and with an up-t o-date calibration certificate. When testing

Page 1079 of 2490

JAGUAR X308 1998 2.G Workshop Manual F
or evaporative emissions components,  
REFER to:  Evaporative Emissions
 (30
 3-13 
Evaporative Emissions,  Diagnosis and Testing). 
For ECT sensor tests,  
REFER to:  Electronic Engine Controls
 (3

Page 1080 of 2490

JAGUAR X308 1998 2.G Workshop Manual Driver Information 
 Chart 
•
 
 NOTE: Use this table to identify DTCs associated with the me
ssage center display, then refer to the DTC index for possible 
sources and actions. 
REF E
 R to: 
Elec

Page 1094 of 2490

JAGUAR X308 1998 2.G Workshop Manual Engine Emission
 Control - Engine Emission Control 
D
iagn
 osis and Testing 
I
n
 spection and Verification 
1.
1. Veri fy the customer concern. 
2. 2. Vis
 ually inspect for obvious signs of mechani

Page 1151 of 2490

JAGUAR X308 1998 2.G Workshop Manual  
The evaporative l
 oss flange assembly is fitted to the top of the tank via a seal and locking ring. The assembly is removeable 
complete with the fitted components. 
The vapour vent / rollover valv

Page 1153 of 2490

JAGUAR X308 1998 2.G Workshop Manual tank vapou
r pressure. 
Canister purge operation is as described in Evaporative Emissions Control. 
Evaporative Flange Assembly 
 
The evaporative loss flange assembly is fitted to the top of the tank
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 56 next >