1997 SSANGYONG KORANDO timing

[x] Cancel search: timing

Page 688 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual OM600 ENGINE MECHANICAL 1B3 -- 139
D AEW OO M Y_2000
CAMSHAFT
Preceding Work : Removal of cylinder head cover
1 Bolt 25N∙m (18 lb-ft) ......................
2 Washer
3 Camshaft Bearing Cap
4 Camshaf

Page 689 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual 1B3 -- 140 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
Tools Required
602 589 00 40 00 Engine Lock
Removal Procedure
1. Rotate the crankshaft and position the piston of no.1
cylinder at TDC.
Notice
Do n

Page 692 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual OM600 ENGINE MECHANICAL 1B3 -- 143
D AEW OO M Y_2000
5. Tighten the camshaft bearing cap bolts acccording
to installation order.
Tightening Torque25 N∙m (18 lb-ft)
Notice
Tighten the No. 1 bolts (li

Page 696 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual OM600 ENGINE MECHANICAL 1B3 -- 147
D AEW OO M Y_2000
TIMING CHAIN
Preceding Work : Removal of glow plug
Removal of chain tensioner
Removal of cooling fan
Removal of cylinder head cover
1 Chain Link
2

Page 697 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual 1B3 -- 148 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
Tools Required
000589584300 ChainAssemblingDevice
Replacement Procedure
1. Cover over the chain box with cleaning rag and grind
off both chain pins

Page 699 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual 1B3 -- 150 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
11. Place the fitting tool (8) onto the chain link and rivet
the chain pins one by one.
Tightening Torque35-- 40 N∙m (26-- 30 lb-ft)
12. Check th

Page 700 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual OM600 ENGINE MECHANICAL 1B3 -- 151
D AEW OO M Y_2000
TENSIONING RAIL
Preceding Work : Removal of cylinder head
Removal of timing case cover
1 Tensioning Rail2 Bearing Pin
Notice
The plastic coating of

Page 701 of 2053

SSANGYONG KORANDO 1997  Service Repair Manual 1B3 -- 152 OM600 ENGINE MECHANICAL
D AEW OO M Y_2000
CYLINDER HEAD GUIDE RAIL
Preceding Work : Removal of the cooling fan
Removal of poly V-- belt
Removal of chain tensioner
1 Cylinder Head Cover
2 Bo