1996 SUBARU LEGACY Timing

[x] Cancel search: Timing

Page 330 of 2890

SUBARU LEGACY 1996  Service Repair Manual B2M0108A
3) Measure the extension of rod beyond the body. If it is
not within specifications, replace with a new one.
Rod extension: H
15.4—16.4 mm (0.606—0.646 in)
3. BELT TENSIONER
1) Check mati

Page 331 of 2890

SUBARU LEGACY 1996  Service Repair Manual C: INSTALLATION
1. SPROCKET
B2M0416B
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 5±1 (0.5±0.1, 3.6±0.7)
T2: 25±2 (2.5±0.2, 18.1±1.4)
T3: 78±5 (8.0±0.5, 57.9±3.6)
G2M0114
1) Install right side

Page 332 of 2890

SUBARU LEGACY 1996  Service Repair Manual 2. BELT TENSIONER AND IDLER
B2M0070A
Tightening torque: N⋅m (kg-m, ft-lb)
T: 39±4 (4.0±0.4, 28.9±2.9)
B2M0109A
1) Installation of belt tension adjuster
Insert stopper pin 1.5 mm (0.059 in) diamet

Page 333 of 2890

SUBARU LEGACY 1996  Service Repair Manual 2) Install belt tensioner and spacer.
3) Install belt idler.
B2M0110
4) Temporarily tighten bolts while belt tension adjuster is
pushed all the way to the right.
3. TIMING BELT
B2M0071A
Tightening tor

Page 334 of 2890

SUBARU LEGACY 1996  Service Repair Manual G2M0122
1) Installation of timing belt
(1) Using ST, turn left and right camshaft sprockets so
that their alignment marks come to top positions.
ST 499207100 CAMSHAFT SPROCKET WRENCH
B2M0417A
(2) Whil

Page 335 of 2890

SUBARU LEGACY 1996  Service Repair Manual 4. CRANKSHAFT PULLEY AND BELT COVER
G2M0126
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 5±1 (0.5±0.1, 3.6±0.7)
T2: 108
+10
�5(11+1.0
�0.5, 79.6+7.2
�3.6)
1) Install front belt cover.
2) Install righ

Page 342 of 2890

SUBARU LEGACY 1996  Service Repair Manual 5. Camshaft
A: REMOVAL
1. RELATED PARTS
1) Remove timing belt, camshaft sprockets and related
parts.
<Ref. to 2-3 [W3A0].>
2) Remove valve rocker assembly.
<Ref. to 2-3 [W4A0].>
2. CAMSHAFT LH
B2M0384

Page 347 of 2890

SUBARU LEGACY 1996  Service Repair Manual 3. RELATED PARTS
1) Install valve rocker assembly.
<Ref. to 2-3 [W4E0].>
B2M0418B
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 5±1 (0.5±0.1, 3.6±0.7)
T2: 12±1 (1.2±0.1, 8.7±0.7)
2) Install timing
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 80 next >