1995 TOYOTA SUPRA engine

[x] Cancel search: engine

Page 98 of 2543

TOYOTA SUPRA 1995  Service Repair Manual EXPANSION VALVE
ON±VEHICLE INSPECTION
1.  CHECK QUANTITY OF GAS DURING REFRIGERATION
CYCLE
2.  INSTALL MANIFOLD GAUGE SET
3. RUN ENGINE
Run the engine at 1,500 rpm for at least 5 minutes. Then
check

Page 106 of 2543

TOYOTA SUPRA 1995  Service Repair Manual ENGINE COOLANT TEMPERATURE
SENSOR REMOVAL
1.  REMOVE AIR CONDITIONING UNIT
(See page AC±80)
2.  REMOVE ENGINE COOLANT TEMPERATURE SENSOR
(a)  Disconnect the connector.
(b)  After pulling off the clam

Page 107 of 2543

TOYOTA SUPRA 1995  Service Repair Manual ELECTRIC COOLING FAN
ON±VEHICLE INSPECTION
Condenser Fan:
1. INSPECT CONDENCER
(a)  Disconnect the fan connector.
(b)  Connect battery and ammeter to the cooling fan connector.
(c)  Check that the co

Page 111 of 2543

TOYOTA SUPRA 1995  Service Repair Manual SERVICE SPECIFICATIONS
SERVICE DATA
 Refrigerant charge volume 700 + 50g. 24.96 + 1.76 oz.
 

Page 118 of 2543

TOYOTA SUPRA 1995  Service Repair Manual INTRODUCTIONGLOSSARY OF SAE AND TOYOTA TERMS -
IN-7
GLOSSARY OF SAE AND TOYOTA TERMS
This glossary lists all SAE-J1930 terms and abbreviations used in this manual  in compliance with SAE
recommendatio

Page 119 of 2543

TOYOTA SUPRA 1995  Service Repair Manual INTRODUCTIONGLOSSARY OF SAE AND TOYOTA TERMS -
IN-8
IACIdle Air ControlIdle Speed Control (ISC)
IATIntake Air TemperatureIntake or Inlet Air Temperature
ICMIgnition Control Module-
IFIIndirect Fuel In

Page 132 of 2543

TOYOTA SUPRA 1995  Service Repair Manual A340E (2JZ-GTE)  AUTOMATIC TRANSMISSIONSERVICE SPECIFICATIONS -
AT-26
TORQUE SPECIFICATIONS
Part tightenedN´mkgf´cmft´lbf
Engine x Transmissin6465047
Rear support member x Body2526019
Transmission

Page 150 of 2543

TOYOTA SUPRA 1995  Service Repair Manual  A340E (2JZ-GTE) AUTOMATIC TRANSMISSIONDESCRIPTION -
AT-2
Transmission  Specifications
Type of TransmissonA340E
Type of Engine2JZ-GTE
Torque Converter Clutch Stall Torque Ratio2.000 : 1
Lock-up Mechan