P2100, P2103 THROTTLE CONTROL MOTOR RELAYEC-357
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2. Check voltage between ECM terminal 104 and ground with
CONSULT-III or tester.
OK or NG
OK >> GO TO 4.
NG >> GO TO 2.
2.CHECK THROTTLE CONTROL MOTOR RELAY POWER SUPPLY CIRCUIT-II
1. Disconnect ECM harness connector.
2. Disconnect IPDM E/R harness connector E122.
3. Check continuity between ECM terminal 104 and IPDM E/R terminal 47. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 3.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
3.CHECK FUSE
1. Disconnect 20A fuse.
2. Check 20A fuse (No. 52) for blown.
OK or NG
OK >> GO TO 7.
NG >> Replace 20A fuse.
4.CHECK THROTTLE CONTROL MOTOR RELAY INPUT SIGNAL CIRCUIT-I
Check voltage between ECM terminal 3 and ground under the fol-
lowing conditions with CONSULT-III or tester.
OK or NG
OK >> GO TO 7.
NG >> GO TO 5.
5.CHECK THROTTLE CONTROL MOTOR RELAY INPUT SIGNAL CIRCUIT-II
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Disconnect IPDM E/R harness connector E119.
4. Check continuity between ECM terminal 3 and IPDM E/R terminal 6. Refer to Wiring Diagram.
5. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6. Voltage: Battery voltage
PBIB1171E
Continuity should exist.
Ignition switch
Voltage
OFF Approximately 0 V
ON Battery voltage
(11 - 14 V)
MBIB0028E
Continuity should exist.
Revision: April 20092010 QX56
EC-360
< COMPONENT DIAGNOSIS >[VK56DE]
P2101 ELECTRIC THROTTLE CONTROL FUNCTION
Refer to EC-85, "Ground Inspection".
OK or NG
OK >> GO TO 2.
NG >> Repair or replace ground connections.
2.CHECK THROTTLE CONTROL MOTOR RELAY INPUT SIGNAL CIRCUIT-I
1. Check voltage between ECM terminal 3 and ground under the following conditions with CONSULT-III or tester.
OK or NG
OK >> GO TO 9.
NG >> GO TO 3.
3.CHECK THROTTLE CONTROL MOTOR RELAY POWER SUPPLY CIRCUIT-I
1. Turn ignition switch OFF.
2. Check voltage between ECM terminal 104 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 6.
NG >> GO TO 4.
4.CHECK THROTTLE CONTROL MOTOR RELAY POWER SUPPLY CIRCUIT-II
1. Disconnect ECM harness connector.
2. Disconnect IPDM E/R harness connector E122.
3. Check harness continuity between ECM terminal 104 and IPDM E/R terminal 47. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 5.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK FUSE
1. Disconnect 20A fuse.
2. Check 20A fuse (No. 52) for blown.
OK or NG
BBIA0354E
Ignition switch Voltage
OFF Approximately 0 V
ON Battery voltage
(11 - 14 V)
MBIB0028E
Voltage: Battery voltage
PBIB1171E
Continuity should exist.
Revision: April 20092010 QX56
P2101 ELECTRIC THROTTLE CONTROL FUNCTIONEC-361
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
OK >> GO TO 8.
NG >> Replace 20A fuse.
6.CHECK THROTTLE CONTROL MOTOR
RELAY INPUT SIGNAL CIRCUIT-II
1. Disconnect ECM harness connector.
2. Disconnect IPDM E/R harness connector E119.
3. Check harness continuity between ECM terminal 3 and IPDM E/R terminal 6. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 8.
NG >> GO TO 7.
7.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E2, F32
• Harness for open or short between ECM and IPDM E/R
>> Repair open circuit or short to ground or short to power in harness or connectors.
8.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
OK or NG
OK >> Replace IPDM E/R. Refer to PCS-35, "Removal and Installation of IPDM E/R".
NG >> Repair or replace harness or connectors.
9.CHECK THROTTLE CONTROL MOTOR OUTPUT SIGNAL CIRCUIT FOR OPEN OR SHORT
1. Turn ignition switch OFF.
2. Disconnect electric throttle c ontrol actuator harness connector.
3. Disconnect ECM harness connector.
4. Check harness continuity between the following terminals. Refer to Wiring Diagram.
5. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 10.
NG >> Repair or replace.
10.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR VISUALLY
1. Remove the intake air duct. Continuity should exist.
Electric throttle control
actuator terminal ECM terminal
Continuity
5 5
Should not exist
4 Should exist
6 5
Should exist
4 Should not exist
PBIB1480E
Revision: April 20092010 QX56
EC-382
< COMPONENT DIAGNOSIS >[VK56DE]
P2A00, P2A03 A/F SENSOR 1
P2A00, P2A03 A/F SENSOR 1
Component DescriptionINFOID:0000000005149460
The air fuel ratio (A/F) sensor 1 is a planar one-cell limit current sen-
sor. The sensor element of the
A/F sensor 1 is composed an elec-
trode layer, which transports ions. It has a heater in the element.
The sensor is capable of precise measurement = 1, but also in the
lean and rich range. Together with its control electronics, the sensor
outputs a clear, continuous signal throughout a wide range.
The exhaust gas components diffuse through the diffusion layer at
the sensor cell. An electrode layer is applied voltage, and this current
relative oxygen density in lean. Also this current relative hydrocar-
bon density in rich.
Therefore, the A/F sensor 1 is able to indicate air fuel ratio by this
electrode layer of current. In addition, a heater is integrated in the
sensor to ensure the required operating temperature of about 800° C
(1,472° F).
On Board Diagn osis LogicINFOID:0000000005149461
To judge the malfunction, the A/F signal computed by ECM from the A/F sensor 1 signal is monitored not to be
shifted to LEAN side or RICH side.
DTC Confirmation ProcedureINFOID:0000000005149462
NOTE:
If DTC Confirmation Procedure has been previously conducted, always perform the following procedure
before conducting the next step.
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Turn ignition switch ON.
3. Turn ignition switch OFF and wait at least 10 seconds.
TESTING CONDITION:
Before performing the following procedure, confirm that battery voltage is more than 11 V at idle.
WITH CONSULT-III
1. Start engine and warm it up to normal operating temperature.
2. Turn ignition switch OFF and wait at least 10 seconds.
3. Turn ignition switch ON and select “SELF-LEARNING CONT” in “WORK SUPPORT” mode with CON-
SULT-III.
4. Clear the self-learning coef ficient by touching “CLEAR”.
PBIB3353E
PBIB3354E
DTC No. Trouble diagnosis name DTC detecting conditionPossible Cause
P2A00
2A00
(Bank 1) Air fuel ratio (A/F) sensor 1
circuit range/performance • The output voltage computed by ECM from the
A/F sensor 1 signal is shifted to the lean side for
a specified period.
• The A/F signal computed by ECM from the A/F
sensor 1 signal is shifted to the rich side for a
specified period. • A/F sensor 1
• A/F sensor 1 heater
• Fuel pressure
• Fuel injector
• Intake air leaks
P2A03
2A03
(Bank 2)
Revision: April 20092010 QX56
P2A00, P2A03 A/F SENSOR 1EC-385
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2. Disconnect A/F sensor 1 harness connector.
3. Check harness connector for water.
OK or NG
OK >> GO TO 6.
NG >> Repair or replace harness connector.
6.CHECK A/F SENSOR 1 POWER SUPPLY CIRCUIT
1. Turn ignition switch ON.
2. Check voltage between A/F sensor 1 terminal 4 and ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 8.
NG >> GO TO 7.
7.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E5, F14
• IPDM E/R harness connector E119
• 15A fuse (No. 54)
• Harness for open or short between A/F sensor 1 and fuse
>> Repair or replace harness or connectors.
8.CHECK A/F SENSOR 1 INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between A/F sensor 1 terminal and ECM terminal as follows. Refer to Wiring Diagram.
4. Check harness continuity between the following terminals and ground. Refer to Wiring Diagram.Water should not exit.
BBIA0376E
Voltage: Battery voltage
PBIB3308E
A/F sensor 1 terminal
ECM terminal
Bank1 13
5
25 6
Bank 2 11
6
27 5
Continuity should exist.
Revision: April 20092010 QX56
ASCD BRAKE SWITCHEC-389
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2. Disconnect ASCD brake switch harness connector.
3. Turn ignition switch ON.
4. Check voltage between ASCD brake switch terminal 1 and
ground with CONSULT-III or tester.
OK or NG
OK >> GO TO 4.
NG >> GO TO 3.
3.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors M31, E152
• Fuse block (J/B) connector M4
• 10 A fuse (No. 15)
• Harness for open or short between ASCD brake switch and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
4.CHECK ASCD BRAKE SWITCH INPUT SIGN AL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 108 and ASCD brake switch terminal 2. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 5.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
5.CHECK ASCD BRAKE SWITCH
Refer to EC-390, "
Component Inspection".
OK or NG
OK >> GO TO 6.
NG >> Replace ASCD brake switch.
6.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
>> INSPECTION END
BBIA0373E
Voltage: Battery voltage
PBIB0857E
Continuity should exist.
Revision: April 20092010 QX56
FUEL INJECTOREC-397
< COMPONENT DIAGNOSIS > [VK56DE]
C
D
E
F
G H
I
J
K L
M A
EC
NP
O
2. Disconnect fuel injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between fuel injector terminal 1 and ground with
CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4.DETECT MALFUNCTIONING PART
Check the following.
• Harness connectors E2, F32
• IPDM E/R connector E119
• 15 A fuse (No. 55)
• Harness for open or short between fuel injector and fuse
>> Repair harness or connectors.
5.CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between fuel injector te rminal 2 and ECM terminals 21, 22, 23, 40, 41, 42, 44,
63.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 6.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
6.CHECK FUEL INJECTOR
Refer to EC-398, "
Component Inspection".
OK or NG
OK >> GO TO 7.
NG >> Replace malfunctioning fuel injector.
7.CHECK INTERMITTENT INCIDENT
Refer to GI-35, "
How to Check Terminal" and GI-38, "Intermittent Incident".
>> INSPECTION END
Voltage: Battery voltage
BBIA0374E
PBIB0582E
Continuity should exist.
Revision: April 20092010 QX56
EC-400
< COMPONENT DIAGNOSIS >[VK56DE]
FUEL PUMP
4. Check voltage between ECM terminal 113 and ground with
CONSULT-III or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 3.
3.CHECK FUEL PUMP POWER SUPPLY CIRCUIT-II
Check voltage between IPDM E/R terminal 46 and ground with
CONSULT-III or tester.
OK or NG
OK >> GO TO 4.
NG >> GO TO 13.
4.DETECT MALFUNCTIONING PART
Check harness for open or short between IPDM E/R and ECM.
>> Repair harness or connectors.
5.CHECK CONDENSER-2 POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Reconnect all harness connectors disconnected.
3. Disconnect condenser-2 harness connector.
4. Turn ignition switch ON.
5. Check voltage between condenser-2 terminal 1 and ground with CONSULT-III or tester.
6. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 8.
NG >> GO TO 6.
6.CHECK 15 A FUSE
1. Turn ignition switch OFF. Voltage: Battery voltage
PBIB1187E
Voltage: Battery voltage
PBIB2656E
BBIA0388E
Voltage: Battery voltage should exist for 1 sec-
ond after ignition switch is turned ON.
PBIB0624E
Revision: April 20092010 QX56