Page 1398 of 6020

6A-38 ENGINE MECHANICAL (4JK1/4JJ1)
3. Install the catalyst converter.
Tighten the nuts to the specified torque.
Tightening torque: 27 N ⋅
⋅⋅
⋅
m (2.8 kg ⋅
⋅⋅
⋅
m / 20 lb ft)
4. Connect the front propeller shaft flange (Front Dif
f
Side, 4 ×4 only).
5. Install the front exhaust pipe.
Tighten the nuts to the specified torque.
Tightening torque
Exhaust Manifold Side: 67 N⋅
⋅⋅
⋅m (6.8 kg⋅
⋅⋅
⋅m / 49 lb ft)
Exhaust Pipe Side: 43 N
⋅
⋅⋅
⋅m (4.4 kg⋅
⋅⋅
⋅m / 32lb ft)
6. Install the water feed pipe to the turbocharger (1).
• Tighten the joint bolts to the specified torque.
Tightening torque: 54 N ⋅
⋅⋅
⋅
m (5.5 kg ⋅
⋅⋅
⋅
m / 40 lb ft)
• Install the pipe bracket and tighten the bolts to
the specified torque.
Tightening torque: 10 N ⋅
⋅⋅
⋅
m (1.0 kg ⋅
⋅⋅
⋅
m / 87 lb in)
• Install the rubber hose between the wate
r
return pipe and the thermostat housing.
RTW 56ASH019101
7. Install the water return pipe. Tighten the joint bolt
to the specified torque.
Tightening torque: 54 N ⋅
⋅⋅
⋅
m (5.5 kg ⋅
⋅⋅
⋅
m / 40 lb ft)
RTW 56ASH019001
8. Install the turbocharger oil feed pipe to the top of
the turbocharger. Tighten the joint bolts to the
specified torque.
Tightening torque (Turbo charger side): 23 N ⋅
⋅⋅
⋅
m (2.3 kg ⋅
⋅⋅
⋅
m / 17 lb ft)
Tightening torque (Oil cooler side): 23 N ⋅
⋅⋅
⋅
m (2.3 kg ⋅
⋅⋅
⋅
m / 17 lb ft)
• Install the pipe bracket and tighten the bolts to
the specified torque.
Tightening torque: (Clip) 10 N ⋅
⋅⋅
⋅
m (1.0 kg ⋅
⋅⋅
⋅
m / 87 lb in)
RTW 56ASH00610
Legend
1. Oil Feed Pipe
2. Clip
3. Oil Return Pipe
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1399 of 6020
ENGINE MECHANICAL (4JK1/4JJ1) 6A-39
9. Tighten the oil return pipe bolts and nuts to the
specified torque.
Tightening torque (Turbocharger side): 10 N ⋅
⋅⋅
⋅
m (1.0 kg ⋅
⋅⋅
⋅
m / 87 lb in)
Tightening torque (Crank case side): 25 N ⋅
⋅⋅
⋅
m (2.5 kg ⋅
⋅⋅
⋅
m / 18 lb ft)
10.Install the EGR cooler. • Refer to “EGR Cooler” in EXHAUST SYSTEM
section.
11. Install the heat protector. • Refer to “EGR Cooler” in EXHAUST SYSTEM
section.
12. Install the intake hose between the intercooler and the intake throttle (7).
13. Install the intake hose between the turbocharge
r
and the intercooler (9).
14. Install the intake duct between the turbocharge
r
and the air cleaner (8).
Tightening torque: 6 N ⋅
⋅⋅
⋅
m (0.6 kg ⋅
⋅⋅
⋅
m / 52 lb in)
15.Replenish the coolant.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1400 of 6020
6A-40 ENGINE MECHANICAL (4JK1/4JJ1)
Torque Specifications
RTW 76ALF000901
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1401 of 6020
ENGINE MECHANICAL (4JK1/4JJ1) 6A-41
Turbocharger (High Output)
Components
RTW 76ALF000401
Legend 1. Turbocharger Assembly Gasket
2. Turbocharger Assembly
3. Turbocharger Heat Protecter
4. W ater Feed and Return Pipe Gasket
5. W ater Feed and Return Pipe 6. Oil Feed and Return Pipe Gasket
7. Oil Feed and Return Pipe
8. Catalyst Converter Gasket
9. Catalyst Converter
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1402 of 6020

6A-42 ENGINE MECHANICAL (4JK1/4JJ1)
Removal
1. Drain the engine coolant.
2. Remove the engine cover.
3. Remove the intercooler. • Disconnect the BARO sensor harness
connector (2).
• Remove the two intake hoses.
• Remove the intercooler (1).
RTW 76ASH000501
4. Disconnect the vacuum hose from the
turbocharger actuator.
5. Remove the air intake duct from the turbocharge
r
and the air cleaner.
6. Remove the front exhaust pipe.
RTW 56ASH018301
Legend
1. Gasket
2. Front Exhaust Pipe (4 ×2 High Ride Suspention,
4 ×4)
3. Gasket
4. Front Exhaust Pipe (4 ×2 Except High Ride
Suspention)
7. Remove the heat protector of the turbocharger.
• Remove the mud cover of front RH fender skirt
(4×4 only).
• Loosen the bolt of Turbocharger bracket.
8. Remove the catalyst converter.
9. Remove the turbocharger bracket.
10. Remove the oil feed and return pipe.
11. Remove the water feed and return pipe from the turbocharger.
RTW 76ASH001001
12. Remove the turbocharger from the exhaust
manifold.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1403 of 6020
ENGINE MECHANICAL (4JK1/4JJ1) 6A-43
Inspection
Wheel shaft axial play
Use a dial gauge to measure the wheel axle shaft pla
y
when a force of 12 N (1.2kg / 2.6 lb) is alternately
applied to both sides of the compressor wheel.
Axial play mm (in)
Standard 0.03 − 0.06 (0.0012 − 0.0024)
Limit 0.09 (0.0035)
LNW 21BSH022201
Wheel shaft and bearing clearance
Use a dial gauge to measure the clearance between the
wheel shaft and the bearing.
Clearance mm (in)
Standard 0.056 − 0.127 (0.0022 − 0.0050)
Limit 0.14 (0.0055)
LNW 21BSH022301
Legend
1. Oil Outlet
2. Oil Intake
Actuator operation
1. Install a vacuum pump (2) to the actuator (1).
LNW 71JSH000201
2. Operate the vacuum pump and apply vacuum
pressure to the actuator.
W orking vacuum pressure kPa (mmHg / psi)
52.8 (396 / 7.66)
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1404 of 6020

6A-44 ENGINE MECHANICAL (4JK1/4JJ1)
3. Place a vernier caliper on the end of the control
rod of actuator. Release the vacuum pressure and
check the control rod moves. Measure the length
of the control rod moving.
Standard length mm (in)
12 (0.48)
Installation
1. Install the gasket and the turbocharger to the
exhaust manifold. Temporarily tighten nuts.
2. Install the oil feed and return pipe and temporaril
y
tighten.
3. Tighten the turbocharger nuts to the specified torque.
Tightening torque: 27 N ⋅
⋅⋅
⋅
m (2.8 kg ⋅
⋅⋅
⋅
m / 20 lb ft)
4. Tighten the oil feed and return pipe bolts and nuts to the specified torque.
Tightening torque (Turbocharger side): 10 N ⋅
⋅⋅
⋅
m (1.0 kg ⋅
⋅⋅
⋅
m / 87 lb in)
Tightening torque (Crank case side): 25 N ⋅
⋅⋅
⋅
m (2.5 kg ⋅
⋅⋅
⋅
m / 18 lb ft)
5. Install the water feed and return pipe to the turbocharger.
Tightening torque: 25 N ⋅
⋅⋅
⋅
m (2.5 kg ⋅
⋅⋅
⋅
m / 18 lb ft)
6. Install the heat protector to the turbocharger. Tightening torque: 10 N ⋅
⋅⋅
⋅
m (1.0 kg ⋅
⋅⋅
⋅
m / 18 lb ft)
7. Install the turbocharger bracket.
8. Install the catalyst converter.
Tighten the nuts to the specified torque.
Tightening torque: 27 N ⋅
⋅⋅
⋅
m (2.8 kg ⋅
⋅⋅
⋅
m / 20 lb ft)
9. Install the mud cover of front RH fender skirt (4 ×4
only).
10. Install the front exhaust pipe.
Tighten the nuts to the specified torque.
Tightening torque
Exhaust Manifold Side: 67 N⋅
⋅⋅
⋅m (6.8 kg⋅
⋅⋅
⋅m / 49 lb ft)
Exhaust Pipe Side: 43 N
⋅
⋅⋅
⋅
m (4.4 kg ⋅
⋅⋅
⋅
m / 32lb ft)
11. Install the intercooler. • Install the intercooler.
• Install the two intake hoses.
• Connect the BARO sensor harness connector.
12. Install the intake duct between the turbocharge
r
and the air cleaner.
Tightening torque: 6 N ⋅
⋅⋅
⋅
m (0.6 kg ⋅
⋅⋅
⋅
m / 52 lb in)
13.Replenish the coolant.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 1405 of 6020
ENGINE MECHANICAL (4JK1/4JJ1) 6A-45
Torque Specifications
RTW 76ALF000501
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007