Page 2937 of 6020
Engine Mechanical – V6 Page 6A1–160
Page 6A1–160
NOTE
Do not remove the primary timing chain lower
guide (1). The primary timing chain lower guide
is not serviced separately. If the primary timing
chain lower guide must be replaced, the oil
pump assembly (2) must be replaced.
Figure 6A1 – 228
12 Ensure the primary timing chain upper guide is selected and orientated correctly.
Figure 6A1 – 229
13 Install the primary ti ming chain upper guide (1).
14 Install the primary timing chain upper guide bolts (2) and tighten to the correct torque specification.
Primary timing chain upper guide
attaching bolt torque spec ification ........... 20.0 – 26.0 Nm
Figure 6A1 – 230
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2948 of 6020

Engine Mechanical – V6 Page 6A1–171
Page 6A1–171
25 Verify the proper placement of the right-hand
secondary timing chain tensioner gasket tab (1).
26 Tighten the right-hand secondary timing chain tensioner bolts (2) to the co rrect torque specification.
Secondary timing chain tensioner
attaching bolt torque spec ification ........... 20.0 – 26.0 Nm
Figure 6A1 – 260
27 Release the right-hand timi ng chain tensioner (1) by
pulling out Tool No. EN 46112 (2) and unlocking the
tensioner plunger.
Figure 6A1 – 261
28 Verify all primary and secondary timing chain timing mark alignments (1 to 18).
29 Remove Tool No. EN 46105 and EN 46105-2 from the left and right-hand cylinder head camshafts.
30 Reinstall the spark plugs. Refer to Section 6C1-3
Engine Management – V6 – Service Operations.
31 Reinstall the engine front cover assembly, refer to 3.15 Front Cover Assembly .
Figure 6A1 – 262
Right-hand Secondary Timing Chain Components – MY06 Update
1 Install the primary timing chain components, refer to Primary Timing chain Components in this Section.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2956 of 6020
Engine Mechanical – V6 Page 6A1–179
Page 6A1–179
27 Release the right-hand timing chain tensioner (1) by
pulling out Tool No. EN 46112 (2) and unlocking the
tensioner plunger.
Figure 6A1 – 284
28 Verify all primary and secondary timing chain timing mark alignments (1 to 18).
29 Remove Tool No. EN 46105–1 and EN 46105-2 from the left and right-hand cylinder head camshafts.
30 Reinstall the spark plugs. Refer to Section 6C1-3
Engine Management – V6 – Service Operations.
31 Reinstall the engine front cover assembly, refer to 3.15 Front Cover Assembly .
Figure 6A1 – 285
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2958 of 6020
Engine Mechanical – V6 Page 6A1–181
Page 6A1–181
Disassemble
CAUTION
There are no serviceable components within
the oil pump. Disassemble the pump only to
diagnose an oil related concern. A
disassembled oil pump must not be reused: it
must be replaced.
1 Remove the two bolts (1) attaching the primary timing chain lower guide (2) and remove the guide.
CAUTION
The primary timing chain lower guide is not
serviced separately and is part of the oil
pump assembly. If it is removed from the
pump assembly, the guide and the pump
must be replaced.
Figure 6A1 – 287
2 Remove the seven bolts (2) attaching the oil pump cover to the oil pump housing (1) and remove the
cover from the housing.
Figure 6A1 – 288
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2961 of 6020
Engine Mechanical – V6 Page 6A1–184
Page 6A1–184
4 Inspect the outer driven gear for damage.
Figure 6A1 – 294
5 Inspect the oil pump relief valve components for debris or damage.
Figure 6A1 – 295
6 Inspect the primary camshaft chain lower guide for damage. If replacement of t he primary camshaft chain
lower guide is required, r eplace the entire oil pump
assembly as the primary camshaft chain lower guide
is not serviceable separately.
7 If debris or damage is pres ent within the oil pump,
further inspection of all of the engine components is
required.
Figure 6A1 – 296
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2962 of 6020
Engine Mechanical – V6 Page 6A1–185
Page 6A1–185
Reassemble
CAUTION
As there are no serviceable components
within the oil pump, a disassembled oil pump
must be replaced.
Reinstall
1 Align the oil pump gerotor with the crankshaft flats
and fit the oil pump assembly to the engine block.
2 Align the pump body (2) with the mounting holes in the cylinder block.
3 Install the oil pump bolt (1), three places, and tighten to the correct torque specification.
4 Install the primary timing chain, refer to 3.16 Timing
Chains, Tensioners, Shoes and Guides .
Oil pump attaching bolt torque
specificat ion ............................................ 20.0 – 26.0 Nm
Figure 6A1 – 297
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2963 of 6020

Engine Mechanical – V6 Page 6A1–186
Page 6A1–186
3.18 Camshaft Sprocket – Excluding MY06
Update
CAUTION
Setting the camshaft timing is required
whenever the camshaft drive system is
disturbed to ensure the relationship between
any chain and sprocket is not lost. Even when
only one sprocket is involved, multiple
crankshaft rotations will not produce
conditions where correct timing can be
confirmed.
If required, follow the Left-hand Secondary
Camshaft Chain Components reinstallation
procedure to reset the camshaft timing.
Remove
Right-hand Side
1 Remove the right-hand ca mshaft cover, refer to 3.12 Camshaft Cover.
2 Remove the camshaft position sensors, refer to Section 6C1-3 Engine Management – Service Operations.
3 Remove the camshaft position actuator solenoids, refer to Section 6C1-3 Engine Management – V6 – Service
Operations .
4 Remove the crankshaft bal ancer assembly, refer to 3.13 Crankshaft Balancer Assembly .
5 Install the crankshaft rotation socket Tool No. EN-46111 onto the crankshaft.
6 Rotate the crankshaft until the camshafts are in a neutral low tension position. The camshaft flats will be
parallel with the camshaft cover rail (1).
Figure 6A1 – 298
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 2966 of 6020
Engine Mechanical – V6 Page 6A1–189
Page 6A1–189
Left-hand Side
1 Remove the left-hand camshaft cover, refer to 3.12 Camshaft Cover .
2 Remove the camshaft position sensors, refer to Section 6C1-3 Engine Management – V6 – Service Operations.
3 Remove the camshaft position actuator solenoids, refer to Section 6C1-3 Engine Management – V6 – Service
Operations .
4 Remove the crankshaft bal ancer assembly, refer to 3.13 Crankshaft Balancer Assembly .
5 Install the crankshaft rotation socket Tool No. EN-46111 onto the crankshaft.
6 Rotate the crankshaft until the camshafts are in a neutral low tension position. The camshaft flats will be
parallel with the camshaft cover rail (1).
Figure 6A1 – 304
7 Install Tool No. EN-46105 – 1 (1) onto the rear of the
left-hand cylinder head camshafts (2).
Figure 6A1 – 305
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007