Page 437 of 6020
PROPELLER SHAFT 4A-21
Installation
NOTE:
Never install the shaft assembly backwards. Completel
y
remove the black paint from the connecting surface of flange
coupling on each end of propeller shaft. Clean so that no
foreign matter will be caught in between.
1. Align the mark, which was applied at removal. Install front
propeller shaft and tighten the bolts and nuts to the
specified torque.
Torque: 59 N ⋅
⋅⋅
⋅
m (6.0 kgf ⋅
⋅⋅
⋅
m/43 lb ⋅
⋅⋅
⋅
ft)
2. Install the exhaust and transfer protectors.
401RS019
3. After installing the propeller shaft, be sure to apply black
paint (1) to exposed area (other than connecting surface) o
f
the entire surface of flange coupling.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 445 of 6020

REAR AXLE 4B-1
SECTION 4B
REAR AXLE
TABLE OF CONTENTS
PAGE
Main Data and Specifications ........................................................................................... 4B- 3
Torque Specifications .............................................................................................................. 4B- 4
Recommended Liquid Gasket .......................................................................................... 4B- 6
Recommended Thread Locking Agents .......................................................................... 4B- 6
Rear Axle Assembly .......................................................................................................... 4B- 7
General Description...................................................................................................... 4B- 7
Servicing ...................................................................................................................... ...... 4B- 8
Rear Axle ...................................................................................................................... ...... 4B- 9
Disassembly .................................................................................................................. 4B - 10
Inspection and Repair .................................................................................................. 4B- 14
Reassembly ................................................................................................................... 4B - 15
Differential Assembly ..................................................................................................................... 4B- 20
Disassembly .................................................................................................................. 4B - 21
Reassembly ................................................................................................................... 4B - 24
Differential Cage Assembly .......................................................................................................... 4B- 34
Disassembly .................................................................................................................. 4B - 35
Inspection and Repair .............................................................................................................. 4B- 35
Reassembly ................................................................................................................................. 4B- 37
Limited Slip Differential (LSD) .......................................................................................... 4B- 38
Disassembly ............................................................................................................................... .4B- 39
Inspection and Repair .................................................................................................. 4B- 40
Reassembly ................................................................................................................... 4B - 42
Troubleshooting............................................................................................................ 4B- 45
Special Service Tool ................................................................................................................. 4B- 56
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 446 of 6020

4B-2 REAR AXLE
Service Precaution
WARNING:
THIS VEHICLE HAS A SUPPLEMENTAL
RESTRAINT SYSTEM (SRS). REFER TO THE SRS
COMPONENT AND WIRING LOCATION VIEW IN
ORDER TO DETERMINE WHETHER YOU ARE
PERFORMING SERVICE ON OR NEAR THE SRS
COMPONENTS OR THE SRS WIRING. WHEN YOU
ARE REFORMING SERVICE ON OR NEAR THE
SRS COMPONENTS OR THE SRS WIRING, REFER
TO THE SRS SERVICE INFORMATION. FAILURE
TO FOLLOW WARNINGS COULD RESULT IN
POSSIBLE AIR BAG DEPLOYMENT, PERSONAL
INJURY, OR OTHERWISE UNNEEDED SRS
SYSTEM REPAIRS.
CAUTION:
Always use the correct fastener in the prope
r
location. When you replace a fastener, use ONLY
the exact part number for that application.
ISUZU/GM will call out those fasteners that require
a replacement after removal. ISUZU/GM will also
call out the fasteners that require thread lockers o
r
thread sealant. UNLESS OTHERWISE SPECIFIED,
do not use supplemental coatings (Paints,
greases, or other corrosion inhibitors) on threaded
fasteners or fastener joint interfaces. Generally,
such coatings adversely affect the fastener torque
and the joint clamping force, and may damage the
fastener. When you install fasteners, use the
correct tightening sequence and specification.
Following these instructions can help you avoid
damage to parts and systems.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 447 of 6020
REAR AXLE 4B-3
MAIN DATA AND SPECIFICATIONS
REAR AXLE
Ring gear size mm (in)φ194 (7.94) φ220 (8.66)
Rear axle type Banjo, semi-floating
Rear axle capacity N (kg/lb)18140 (1850/4079)
Rear axle case
Axle tube section
Outside diameter mm (in)80 (3.15)
Thickness mm (in)4.5 (0.118)
Final drive type Single speed
Final gear type Hypoid
Drive pinion bearing preload N⋅m (kgf ⋅cm/lb ⋅in)
Starting torque (At drive pinion flange nut) 0.6-1.1 (6.5-11.5/5.6-10.0) 0.7-1.3 (7.0-13.0/6.1-11.3)
Preload adjusting method Collapsible
Final gear backlash mm (in) 0.13-0.18 (0.005-0.007) 0.15-0.20 (0.006-0.008)
Differential carrier assembly
W eight (Dry) kg/lb22.0/48.5 29.0/63.9
Lubrication
Specified gear oil (APL grade) GL5 GL5 (STD), GL5LSD (LSD)
Oil capacity liter (US/UK gal) 1.6 (0.42/0.35) 2.4 (0.63/0.53)
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 448 of 6020
4B-4 REAR AXLE
Torque Specifications
Rear Axle
N⋅m (kgf ⋅m/lb ⋅ft)
RTW 74BLF000101
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 450 of 6020

4B-6 REAR AXLE
RECOMMENDED LIQUID GASKET
Type Brand Name Manufacture Remarks
RTV* Silicon Base ThreeBond 1207B
ThreeBond 1207C
ThreeBond 1215
Three Bond
Three Bond
Three Bond
For Engine Repairs
For Axle Case
Repairs, T/M
W ater Base ThreeBond 1141E Three Bond For Engine Repairs
Solvent ThreeBond 1104
BelcoBond 4
BelcoBond 401
BelcoBond 402 Three bond
Isuzu
Isuzu
Isuzu
For Engine Repairs
Anaerobic LOCTITE 515
LOCTITE 518 Loctite
Loctite All
* RTV : Room Temperature Vulcanizer
Note :
1. It is very important that the liquid gaskets listed above or their exact equivalent be used on the
vehicle.
2. Be careful to use the specified amount of liquid gasket.
Follow the manufacture's instructions at all times.
3. Be absolutely sure to remove all lubricants and
moisture from the connecting surfaces before
applying the liquid gasket.
The connecting surfaces must be perfectly dry.
4. LOCTITE 515 and LOCTITE 518 harden upon contact with a metal surface.
Do not apply LOCTITE 515 or LOCTITE 518 between two metal surfaces having a clearance
of greater than 0.25 mm (0.01 in). Poo
r
adhesion will result.
RECOMMENDED THREAD LOCKING AGENTS
LOCTITE Type LOCTITE Color Application Steps
LOCTITE 242
Blue 1. Completely remove all lubricant and moisture from the bolts and
the female threaded surfaces of the parts to be joined.
The surfaces must be perfectly dry.
LOCTITE 262
Red 2. Apply LOCTITE to the bolts.
LOCTITE 270
Green
LOCTITE 271
Red
3. Tighten the bolts to the specified torque.
4. W ait at least one hour before continuing the installation procedure.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 452 of 6020
4B-8 REAR AXLE
SERVICING
Rear Axle Oil Replacement
Oil Capacity liters (US/UK gal.)
Specified gear oil GL5 (API grade)(STD)
GL5LSD (LSD)
φ220mm 2.4 (0.63/0.53)
φ194mm 1.6 (0.42/0.35)
Filler Plug and Drain Plug Torque N ⋅m (kgf ⋅m/lb ⋅ft)
78 (8.0/58)
Axle Shaft Roller Bearing Endplay
Inspection
1. Raise and suitably support vehicle.
2. Remove the wheel and brake drum.
3. Inspect the axle shaft roller bearing endplay using dial gauge.
Endplay mm (in
)
Standard 0 ~ 0.2 (0 ~ 0.008)
If the endplay exceeds 0.2mm (0.008 in), replace the
axle shaft roller bearings.
Refer to Rear Axle Reassembly.
RTW 34BSH000101
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 459 of 6020
REAR AXLE 4B-15
Reassembly
1. Using the oil seal installer 5-8840-2202-0 and
grip 5-8840-0007-0, install new axle case oil seal.
RTW 54BSH000301
Note :
Confirm that the dimension : A should be 34.5 –
36.1 mm (1.36 – 1.42 in)
A03R300004
2. Install new oil seal in bearing holder, using the oil seal installer 5-8840-2404-0.
RTW 54BSH000501
Legend
1. Oil Seal
2. Bearing Holder
3. Drive wheel pin into axle shaft flange, using a hammer.
4. Differential assembly a. Clean the mating surface of axle case and differential carrier.
b.
Apply Three Bond 1215 (TB1215) or
equivalent on the surface of differential
assembly as flowing illustration.
RTW 74BSH000301
Legend
a. 3 mm (0.12 in)
c. Tighten bolts and nuts to the specified torque.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007