Page 2054 of 4731
INJECTOR CIRCUIT EC-661
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
INJECTOR CIRCUITPFP:16600
Component DescriptionABS006Y9
The fuel injector is a small, precise solenoid valve. When the ECM
supplies a ground to the injector circuit, the coil in the injector is
energized. The energized coil pulls the Ball valve back and allows
fuel to flow through the injector into the intake manifold. The amount
of fuel injected depends upon the injection pulse duration. Pulse
duration is the length of time the injector remains open. The ECM
controls the injection pulse duration based on engine fuel needs.
CONSULT-II Reference Value in Data Monitor ModeABS006YA
Specification data are reference values.
SEF375Z
MONITOR ITEM CONDITION SPECIFICATION
B/FUEL SCHDL See EC-153, "
TROUBLE DIAGNOSIS - SPECIFICATION VALUE" .
INJ PULSE-B1
INJ PULSE-B2
Engine: After warming up
Shift lever: P or N
Air conditioner switch: OFF
No-load Idle 2.0 - 3.0 msec
2,000 rpm 1.9 - 2.9 msec
Page 2055 of 4731
EC-662
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
Wiring DiagramABS006YB
TBWM0310E
Page 2056 of 4731
![INFINITI FX35 2005 Service Manual INJECTOR CIRCUIT EC-663
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
Specification data are reference values and are measured between each terminal and ground.
Pulse s INFINITI FX35 2005 Service Manual INJECTOR CIRCUIT EC-663
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
Specification data are reference values and are measured between each terminal and ground.
Pulse s](/manual-img/42/57020/w960_57020-2055.png)
INJECTOR CIRCUIT EC-663
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)
Diagnostic ProcedureABS006YC
1. INSPECTION START
Turn ignition switch to START.
Is any cylinder ignited?
Ye s o r N o
Yes (With CONSULT-II)>>GO TO 2.
Yes (without CONSULT-II)>>GO TO 3.
No >> GO TO 6.
2. CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Perform “POWER BALANCE” in “ACTIVE TEST” mode with CONSULT-II.
3. Make sure that each circuit produces a momentary engine speed drop.
OK or NG
OK >> INSPECTION END
NG >> GO TO 6.
TER-
MINAL
NO. WIRE
COLOR ITEM CONDITION DATA (DC Voltage)
21
22
23
40
41
42 W
G
R
LG
B
P Injector No. 5
Injector No. 3
Injector No. 1
Injector No. 6
Injector No. 4
Injector No. 2 [Engine is running]
Warm-up condition
Idle speed
NOTE:
The pulse cycle changes depending on rpm
at idle BATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Warm-up condition
Engine speed is 2,000 rpm BATTERY VOLTAGE
(11 - 14V)
SEC984C
SEC985C
PBIB0133E
Page 2057 of 4731
![INFINITI FX35 2005 Service Manual EC-664
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
3. CHECK FUNCTION OF INJECTOR-I
With out CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect harness connector F50, F251
3. Turn ignit INFINITI FX35 2005 Service Manual EC-664
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
3. CHECK FUNCTION OF INJECTOR-I
With out CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect harness connector F50, F251
3. Turn ignit](/manual-img/42/57020/w960_57020-2056.png)
EC-664
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
3. CHECK FUNCTION OF INJECTOR-I
With out CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect harness connector F50, F251
3. Turn ignition switch ON.
4. Check voltage between harness connector F50 terminal 5 and ground with CONSULT-II or tester.
5. Turn ignition switch OFF.
6. Disconnect ECM harness connector.
7. Check harness continuity between harness connector F50 and ECM as follows.
Refer to Wiring Diagram.
8. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M82, F102
Harness connectors F50, F251
Fuse block (J/B) connector M4
15A fuse
Harness for open or short between harness connector F50 and fuse
Harness for open or short between harness connector F50 and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
PBIB2624E
Voltage: Battery voltage
Cylinder Harness connector F50
terminal ECM terminal
1623
2442
3222
4341
5121
6740
Continuity should exist.
PBIB2323E
Page 2058 of 4731
INJECTOR CIRCUIT EC-665
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
5. CHECK FUNCTION OF INJECTOR-II
Provide battery voltage between harness connector F251 as follows
and then interrupt it. Listen to each injector operating sound.
OK or NG
OK >> INSPECTION END
NG >> GO TO 6.
6. CHECK INJECTOR POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between injector terminal 1 and ground with CONSULT-II or tester.
OK or NG
OK >> GO TO 8.
NG >> GO TO 7.
Cylinder Harness connector F251 terminal
(+) (–)
156
254
352
453
551
657
Operating sound should exist.
PBIB2497E
PBIB1561E
Voltage: Battery voltage
PBIB0582E
Page 2059 of 4731
![INFINITI FX35 2005 Service Manual EC-666
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
7. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M82, F102
Harness connectors F50, F251
Fuse block (J/B) connector INFINITI FX35 2005 Service Manual EC-666
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
7. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M82, F102
Harness connectors F50, F251
Fuse block (J/B) connector](/manual-img/42/57020/w960_57020-2058.png)
EC-666
[VQ35DE]
INJECTOR CIRCUIT
Revision: 2005 July 2005 FX
7. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M82, F102
Harness connectors F50, F251
Fuse block (J/B) connector M4
10A fuse
Harness for open or short between injector and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
8. CHECK INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between injector terminal 2 and ECM terminals 21, 22, 23, 40, 41, 42. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 10.
NG >> GO TO 9.
9. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors F251, F50
Harness for open or short between injector and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
10. CHECK INJECTOR
Refer to EC-667, "
Component Inspection" .
OK or NG
OK >> GO TO 11.
NG >> Replace injector.
11 . CHECK INTERMITTENT INCIDENT
Refer to EC-163, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>> INSPECTION END
Continuity should exist.
Page 2060 of 4731
INJECTOR CIRCUIT EC-667
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EC
Revision: 2005 July 2005 FX
Component InspectionABS006YD
INJECTOR
1. Disconnect injector harness connector.
2. Check resistance between terminals as shown in the figure.
Removal and InstallationABS006YE
INJECTOR
Refer to EM-45, "FUEL INJECTOR AND FUEL TUBE" .
Resistance: 13.5 - 17.5
Ω [at 10 - 60 °C (50 - 140 °F)]
PBIB1727E
Page 2061 of 4731
![INFINITI FX35 2005 Service Manual EC-668
[VQ35DE]
FUEL PUMP CIRCUIT
Revision: 2005 July 2005 FX
FUEL PUMP CIRCUITPFP:17042
DescriptionABS006YF
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed INFINITI FX35 2005 Service Manual EC-668
[VQ35DE]
FUEL PUMP CIRCUIT
Revision: 2005 July 2005 FX
FUEL PUMP CIRCUITPFP:17042
DescriptionABS006YF
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed](/manual-img/42/57020/w960_57020-2060.png)
EC-668
[VQ35DE]
FUEL PUMP CIRCUIT
Revision: 2005 July 2005 FX
FUEL PUMP CIRCUITPFP:17042
DescriptionABS006YF
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed and battery voltage.
The ECM activates the fuel pump for several seconds after the ignition switch is turned ON to improve engine
start ability. If the ECM receives a engine speed signal from the camshaft position sensor (PHASE), it knows
that the engine is rotating, and causes the pump to operate. If the engine speed signal is not received when
the ignition switch is ON, the engine stalls. The ECM stops pump operation and prevents battery discharging,
thereby improving safety. The ECM does not directly drive the fuel pump. It controls the ON/OFF fuel pump
relay, which in turn controls the fuel pump.
COMPONENT DESCRIPTION
A turbine type design fuel pump is used in the furl tank.
CONSULT-II Reference Value in Data Monitor ModeABS006YG
Specification data are reference values.
Sensor Input Signal to ECM ECM Function Actuator
Crankshaft position sensor (POS)
Camshaft position sensor (PHASE) Engine speed*
Fuel pump control Fuel pump relay
Battery Battery voltage*
Condition Fuel pump operation
Ignition switch is turned to ON. Operates for 1 second.
Engine running and cranking Operates.
When engine is stopped Stops in 1.5 seconds.
Except as shown above Sto ps.
PBIB1569E
MONITOR ITEM CONDITION SPECIFICATION
FUEL PUMP RLY
For 1 second after turning ignition switch ON
Engine running or cranking ON
Except above conditions OFF