Page 2897 of 4731
![INFINITI FX35 2005 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2005 July 2005 FX
c. Install new collared O-rings in front timing chain case oil hole
(left and right sides).
d. Being careful not to move seal ring INFINITI FX35 2005 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2005 July 2005 FX
c. Install new collared O-rings in front timing chain case oil hole
(left and right sides).
d. Being careful not to move seal ring](/manual-img/42/57020/w960_57020-2896.png)
EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2005 July 2005 FX
c. Install new collared O-rings in front timing chain case oil hole
(left and right sides).
d. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain case with the holes to install intake valve timing control covers.
e. Tighten mounting bolts in numerical order as shown in the fig- ure.
9. Install crankshaft pulley as follows:
a. Fix crankshaft using the ring gear stopper [SST: KV10117700 (J44716)].
b. Install crankshaft pulley, taking care not to damage front oil seal.
When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).
c. Tighten crankshaft pulley bolt.
d. Put a paint mark on crankshaft pulley aligning with angle mark on crankshaft pulley bolt. Then, further retighten bolt by 60 to 65
degrees [Target: 60 degrees (equivalent to one graduation)].
10. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns smoothly.
11. For the following operations, perform steps in the reverse order of removal. NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in the guide may gener-
ate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
PBIC2631E
PBIC0918E
: 44.1 N·m (4.5 kg-m, 33 ft-lb)
SEM751G
Page 2898 of 4731
![INFINITI FX35 2005 Service Manual FRONT TIMING CHAIN CASE EM-63
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The followings are procedures for checkin INFINITI FX35 2005 Service Manual FRONT TIMING CHAIN CASE EM-63
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The followings are procedures for checkin](/manual-img/42/57020/w960_57020-2897.png)
FRONT TIMING CHAIN CASE EM-63
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The followings are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Page 2900 of 4731
![INFINITI FX35 2005 Service Manual TIMING CHAIN EM-65
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Removal and InstallationABS004XE
NOTE:
This section describes procedures for removing/installing front INFINITI FX35 2005 Service Manual TIMING CHAIN EM-65
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Removal and InstallationABS004XE
NOTE:
This section describes procedures for removing/installing front](/manual-img/42/57020/w960_57020-2899.png)
TIMING CHAIN EM-65
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Removal and InstallationABS004XE
NOTE:
This section describes procedures for removing/installing front timing chain case and timing chain related
parts, and rear timing chain case, when oil pan (upper) needs to be removed/installed for engine overhaul,
etc.
To remove/install front timing chain case, timing chain, and its related parts without removing oil pan
(upper), refer to EM-54, "
FRONT TIMING CHAIN CASE" .
REMOVAL
1. Remove front tire.
2. Disconnect negative battery terminal.
3. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
4. Remove air cleaner case assembly. Refer to EM-17, "
AIR CLEANER AND AIR DUCT" .
5. Remove front and rear engine undercover with power tool.
6. Release the fuel pressure. Refer to EC-99, "
FUEL PRESSURE RELEASE" .
7. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine coolant on drive belts.
8. Drain engine oil. Refer to LU-9, "
Changing Engine Oil" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine oil on drive belts.
9. Remove engine harnesses.
10. Remove intake manifold collectors (upper and lower). Refer to EM-19, "
INTAKE MANIFOLD COLLEC-
TOR" .
11. Remove radiator cooling fan assembly. Refer to CO-21, "
COOLING FAN" .
12. Remove drive belts. Refer to EM-15, "
DRIVE BELTS" .
13. Remove A/C compressor from bracket with piping connected, and temporarily secure it aside. Refer to ATC-140, "
Components" .
14. Remove power steering oil pump from bracket with piping connected, and temporarily secure it aside. Refer to PS-31, "
POWER STEERING OIL PUMP" .
15. Remove power steering oil pump bracket. Refer to PS-31, "
POWER STEERING OIL PUMP" .
16. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
17. Remove water bypass hose, water hose clamp and idler pulley bracket from front timing chain case.
18. Remove intake valve timing control covers.
1. Timing chain tensioner (secondary) 2. Internal chain guide 3. Timing chain tensioner (secondary)
4. Camshaft sprocket (EXH) 5. Timing chain (secondary) 6. Timing chain (primary)
7. Camshaft sprocket (INT) 8. Camshaft sprocket (EXH) 9. Timing chain (secondary)
10. Camshaft sprocket (INT) 11. Slack guide 12. Crankshaft sprocket
13. Timing chain tensioner (primary) 14. Intake valve timing control cover 15. Collared O-ring
16. O-ring 17. Chain tensioner cover 18. Intake valve timing control cover
19. Water hose clamp 20. Idler pulley bracket 21. Idler pulley
22. Crankshaft pulley 23. Front oil seal 24. Idler pulley
25. A/C compressor bracket 26. Water pump cover 27. Bracket
28. Front timing chain case 29. Bracket 30. Rear timing chain case
31. O-ring 32. Tension guide 33. Water drain plug (front side)
Page 2901 of 4731
![INFINITI FX35 2005 Service Manual EM-66
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
Loosen mounting bolts in reverse order as shown in the fig-
ure.
U s e t h e s e a l c u t t e r [ S S T: K V 1 0 1111 0 0 ( J 3 7 2 2 INFINITI FX35 2005 Service Manual EM-66
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
Loosen mounting bolts in reverse order as shown in the fig-
ure.
U s e t h e s e a l c u t t e r [ S S T: K V 1 0 1111 0 0 ( J 3 7 2 2](/manual-img/42/57020/w960_57020-2900.png)
EM-66
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
Loosen mounting bolts in reverse order as shown in the fig-
ure.
U s e t h e s e a l c u t t e r [ S S T: K V 1 0 1111 0 0 ( J 3 7 2 2 8 ) ] t o c u t l i q u i d
gasket for removal.
CAUTION:
Shaft is internally jointed with camshaft sprocket (INT) cen-
ter hole. When removing, keep it horizontal until it is com-
pletely disconnected.
19. Remove collared O-ring from front timing chain case (left and right side).
20. Remove rocker covers (right and left). Refer to EM-51, "
ROCKER COVER" .
21. Remove oil pans (lower and upper). Refer to EM-30, "
OIL PAN AND OIL STRAINER" .
22. Obtain No. 1 cylinder at TDC of its compression stroke as follows:
a. Rotate crankshaft pulley clockwise to align timing mark (grooved line without color) with timing indicator.
b. Make sure that intake and exhaust cam noses on No. 1 cylinder (engine front side of right bank) are located as shown in the fig-
ure.
If not, turn crankshaft one revolution (360 degrees) and align
as shown in the figure.
23. Remove crankshaft pulley as follows:
SEM728G
PBIC2631E
KBIA1717J
SEM418G
Page 2909 of 4731
EM-74
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
b. Install new O-rings to cylinder head.
c. Apply liquid gasket with the tube presser [SST: WS39930000 ( — )] to rear timing chain case back side
as shown in the figure.
Use Genuine RTV Silicone Sealant or equivalent. Refer to GI-48, "
RECOMMENDED CHEMICAL
PRODUCTS AND SEALANTS" .
CAUTION:
For “A” in the figure, completely wipe out liquid gasket extended on a portion touching at
engine coolant.
Apply liquid gasket on installation position of water pump and cylinder head very completely.
d. Align rear timing chain case and water pump assembly with dowel pins (right and left) on cylinder block and install rear timing chain case.
Make sure O-rings stay in place during installation to cylinder block and cylinder head.
SBIA0496E
PBIC2680E
Page 2912 of 4731
TIMING CHAIN EM-77
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
c. After confirming the mating marks are aligned, tighten camshaft
sprocket mounting bolts.
Secure camshaft using a wrench at the hexagonal portion to
tighten mounting bolts.
d. Pull stopper pins out from timing chain tensioners (secondary).
6. Install tension guide.
7. Install timing chain (primary) as follows:
a. Install crankshaft sprocket.
Make sure the mating marks on crankshaft sprocket face the
front of the engine.
b. Install timing chain (primary).
KBIA1698J
PBIC2110E
SEM929E
Page 2914 of 4731
TIMING CHAIN EM-79
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
CAUTION:
Do not overtighten slack guide mounting bolts. It is normal
for a gap to exist under the bolt seats when mounting bolts
are tightened to the specification.
When installing timing chain tensioner (primary), push in
plunger and keep it pressed in with a stopper pin.
Remove any dirt and foreign materials completely from the
back and the mounting surfaces of timing chain tensioner (pri-
mary).
After installation, pull out a stopper pin by pressing slack
guide.
9. Make sure again that the mating marks on sprockets and timing chain have not slipped out of alignment.
10. Install new O-rings on rear timing chain case.
11. Install new front oil seal on front timing chain case.
Apply new engine oil to both oil seal lip and dust seal lip.
Install it so that each seal lip is oriented as shown in the fig-
ure.
PBIC2633E
PBIC2108E
PBIC2548E
SEM715A
Page 2917 of 4731
![INFINITI FX35 2005 Service Manual EM-82
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
15. Install oil pans (upper and lower). Refer to EM-30, "
OIL PAN AND INFINITI FX35 2005 Service Manual EM-82
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
15. Install oil pans (upper and lower). Refer to EM-30, "
OIL PAN AND](/manual-img/42/57020/w960_57020-2916.png)
EM-82
[VQ35DE]
TIMING CHAIN
Revision: 2005 July 2005 FX
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
15. Install oil pans (upper and lower). Refer to EM-30, "
OIL PAN AND OIL STRAINER" .
16. Install rocker covers (right and left banks). Refer to EM-51, "
ROCKER COVER" .
17. Install crankshaft pulley as follows:
a. Fix crankshaft using the ring gear stopper [SST: KV10117700 (J44716)].
b. Install crankshaft pulley, taking care not to damage front oil seal.
When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).
c. Tighten crankshaft pulley bolt.
d. Put a paint mark on crankshaft pulley aligning with angle mark on crankshaft pulley bolt. Then, further retighten bolt by 60
degrees (Angle tightening).
e. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns smoothly.
18. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
PBIC0918E
: 44.1 N·m (4.5 kg-m, 33 ft-lb)
SEM751G