MT-92
FINAL DRIVE
8. Press in differential side bearing (clutch housing side) to differ-
ential case using the drifts.
9. Install final gear into differential case, and tighten final gear
mounting bolts to the specified torque. Refer to MT-23, "
FINAL
DRIVE COMPONENTS" .
Assembly and Disassembly (RS6F51A)ECS008CB
PRE-INSPECTION
Check the clearance between side gear and differential case as
follows.
1. Clean final drive assembly sufficiently to prevent side gear thrust
washer, differential case, side gear, and other parts from sticking
by gear oil.
2. Upright differential case so that side gear to be measured faces upward.
3. Place the drift below and a dial gauge onto side gear. Move side
gear up and down, and measure the clearance.
CAUTION:
There should be no resistance and gears should rotate
freely.
4. If not within specification, adjust the clearance by changing side
gear thrust washer thickness.
5. Turn differential case upside down, and measure the clearance
between side gear and differential case on the other side in the
same way.
DISASSEMBLY
1. Remove final gear mounting bolts, and then separate the final gear from differential case.
SCIA0911E
SCIA0912E
PCIB0806E
Clearance between side gear and differential case
: 0.1 - 0.2 mm (0.004 - 0.008 in)
SMT611A
FINAL DRIVE
MT-93
D
E
F
G
H
I
J
K
L
MA
B
MT
2. Remove differential side bearing (clutch housing side) using the
drift and pullers.
3. Remove differential side bearing (transaxle case side) using the
drift and pullers.
4. Remove retaining pin from differential case, and then remove
pinion mate shaft using a pin punch.
5. Rotate pinion mate gears, and remove pinion mate gears, pinion
mate thrust washers, side gears, and side gear thrust washers
from differential case.
INSPECTION AFTER DISASSEMBLY
Gear, Washer, Shaft and Case
Check side gears, side gear thrust washers, pinion mate shaft,
pinion mate gears, pinion mate thrust washers and differential
case. If necessary, replace with a new one.
SCIA0906E
SCIA0907E
SCIA0908E
MTK0135D
FINAL DRIVE
MT-95
D
E
F
G
H
I
J
K
L
MA
B
MT
c. Move side gears up and down to measure end play, and select
thrust washer so that it satisfies the standard value. Refer to MT-
101, "DIFFERENTIAL SIDE GEAR THRUST WASHER" .
CAUTION:
There should be no resistance and gears should rotate
freely.
Place differential case upside down. Be sure to measure
end play for opposite side-gears likewise.
Only one thrust washer can be selected.
6. Install a new retaining pin into pinion mate shaft using a pin
punch.
CAUTION:
Do not reuse retaining pin.
7. Press in differential side bearing (transaxle case side) to differ-
ential case using the drifts.
8. Press in differential side bearing (clutch housing side) to differ-
ential case using the drifts.
9. Install final gear into differential case, and tighten final gear
mounting bolts to the specified torque. Refer to MT-28, "
FINAL
DRIVE COMPONENTS" . End play standard value
: 0.1 - 0.2 mm (0.004 - 0.008 in)
SMT611A
SCIA0908E
SCIA0910E
SCIA0911E
SCIA0912E
SERVICE DATA AND SPECIFICATIONS (SDS)
MT-99
D
E
F
G
H
I
J
K
L
MA
B
MT
FINAL GEAR
End PlayECS008CF
Unit: mm (in)
Baulk Ring ClearanceECS00CV4
Unit: mm (in) Remarks Reverse synchronizer Installed
Double-cone synchronizer 1st
Triple-cone synchronizer 2nd Engine QR20DE QR25DE YD22DDTi
Transaxle model RS5F51A RS6F51A
Model code number EQ000 EQ008 EQ068
Engine QR20DE QR25DE YD22DDTi
Transaxle model RS5F51A RS6F51A
Model code number EQ000 EQ008 EQ068
Final gear ratio 4.750 4.428
Number of teeth Final gear/Pinion 76/16 62/14
Side gear/Pinion mate gear 14/10
Gear End play
1st main gear0.20 - 0.30 (0.0079 - 0.0118)
2nd main gear 0.06 - 0.16 (0.0024 - 0.0063)
3rd input gear0.18 - 0.31 (0.0071 - 0.0122)
4th input gear0.20 - 0.30 (0.0079 - 0.0118)
5th input gear0.06 - 0.16 (0.0024 - 0.0063)
6th input gear (For RS6F51A model) 0.06 - 0.16 (0.0024 - 0.0063)
Measurement point Standard Limit value
1st
(Double-cone synchronizer)
Clearance between synchronizer cone
and inner baulk ring end face “A”
Clearance between outer baulk ring pawl
and synchronizer cone “B”A: 0.6 - 0.8 (0.024 - 0.031)
B: 0.6 - 1.1 (0.024 -0.043)0.2 (0.008)
0.2 (0.008)
2nd
(Triple-cone synchronizer)
Clearance between synchronizer cone
and clutch gear end face “A”
Clearance between outer baulk ring pawl
and synchronizer cone “B”
Clearance between inner baulk ring and
clutch gear end face “C”A: 0.6 - 1.2 (0.024 - 0.047)
B: 0.6 - 1.1 (0.024 - 0.043)
C: 0.7 - 1.1 (0.028 - 0.043)0.3 (0.012)
0.2 (0.008)
0.3 (0.012)
3rd&4th 0.9 - 1.45 (0.035 - 0.057) 0.7 (0.028)
PCIB0249E
PCIB0772E
AT-1
AUTOMATIC TRANSAXLE
C TRANSMISSION/TRANSAXLE
CONTENTS
D
E
F
G
H
I
J
K
L
M
SECTION
A
B
AT
AUTOMATIC TRANSAXLE
TROUBLE DIAGNOSIS — INDEX ............................. 6
Alphabetical & P No. Index for DTC ......................... 6
PRECAUTIONS .......................................................... 8
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 8
Precautions for On Board Diagnostic (EURO-OBD)
System of A/T and Engine — Euro-OBD — ............. 8
Precautions for Trouble Diagnosis ........................... 8
Precautions for Harness Repair ............................... 8
Precautions .............................................................. 9
Service Notice or Precautions ................................ 10
Wiring Diagrams and Trouble Diagnosis ................. 11
PREPARATION ......................................................... 12
Special Service Tools ............................................. 12
Commercial Service Tools ...................................... 15
A/T FLUID ................................................................. 16
Checking A/T Fluid ................................................. 16
Changing A/T Fluid ................................................ 17
OVERALL SYSTEM ................................................. 18
Cross-Sectional View ............................................. 18
Hydraulic Control Circuit ........................................ 19
A/T Electrical Parts Location .................................. 20
Circuit Diagram ...................................................... 21
Shift Mechanism ..................................................... 22
TCM Function ......................................................... 31
CAN Communication .............................................. 32
Input/Output Signal of TCM .................................... 34
Line Pressure Control ............................................ 34
Shift Control ........................................................... 35
Lock-up Control ...................................................... 36
Engine Brake Control (Overrun Clutch Control) ..... 37
Control Valve .......................................................... 39
EURO-OBD
ON BOARD DIAGNOSTIC SYSTEM DESCRIP-
TION .......................................................................... 40
Introduction ............................................................ 40
EURO-OBD Function for A/T System .................... 40One or Two Trip Detection Logic of EURO-OBD .... 40
EURO-OBD Diagnostic Trouble Code (DTC) ......... 40
Malfunction Indicator lamp (MIL) ............................ 44
CONSULT-II ............................................................ 44
Diagnostic Procedure Without CONSULT-II ........... 52
TROUBLE DIAGNOSIS — INTRODUCTION ........... 57
Introduction ............................................................. 57
Work Flow ............................................................... 61
TROUBLE DIAGNOSIS — BASIC INSPECTION .... 64
A/T Fluid Check ...................................................... 64
Stall Test ................................................................. 65
Line Pressure Test .................................................. 68
Road Test ............................................................... 70
TROUBLE DIAGNOSIS — GENERAL DESCRIP-
TION .......................................................................... 85
Symptom Chart ....................................................... 85
TCM Terminals and Reference Value ..................... 94
DTC U1000 CAN COMMUNICATION LINE .............. 97
Description .............................................................. 97
On Board Diagnosis Logic ...................................... 97
Possible Cause ....................................................... 97
DTC Confirmation Procedure ................................. 97
Wiring Diagram — AT — CAN ................................ 98
Diagnostic Procedure ............................................. 99
DTC P0705 PARK/NEUTRAL POSITION (PNP)
SWITCH ..................................................................100
Description ............................................................100
On Board Diagnosis Logic ....................................100
Possible Cause .....................................................100
DTC Confirmation Procedure ...............................100
Wiring Diagram — AT — PNP/SW .......................102
Diagnostic Procedure ...........................................103
DTC P0710 A/T FLUID TEMPERATURE SENSOR
CIRCUIT ..................................................................106
Description ............................................................106
On Board Diagnosis Logic ....................................106
Possible Cause .....................................................106
DTC Confirmation Procedure ...............................106
Wiring Diagram — AT — FTS ..............................108
AT-2 Diagnostic Procedure ...........................................109
Component Inspection ...........................................111
DTC P0720 VEHICLE SPEED SENSOR·A/T (REV-
OLUTION SENSOR) ...............................................112
Description ............................................................112
On Board Diagnosis Logic ....................................112
Possible Cause .....................................................112
DTC Confirmation Procedure ...............................112
Wiring Diagram — AT — VSSA/T .........................114
Diagnostic Procedure ...........................................115
DTC P0725 ENGINE SPEED SIGNAL ...................119
Description ............................................................119
On Board Diagnosis Logic ....................................119
Possible Cause .....................................................119
DTC Confirmation Procedure ...............................119
Wiring Diagram — AT — ENGSS .........................121
Diagnostic Procedure ...........................................122
DTC P0731 A/T 1ST GEAR FUNCTION .................125
Description ............................................................125
On Board Diagnostic Logic ...................................125
Possible Cause .....................................................125
DTC Confirmation Procedure ...............................125
Wiring Diagram — AT — 1STSIG .........................127
Diagnostic Procedure ...........................................128
DTC P0732 A/T 2ND GEAR FUNCTION ................130
Description ............................................................130
On Board Diagnostic Logic ...................................130
Possible Cause .....................................................130
DTC Confirmation Procedure ...............................130
Wiring Diagram — AT — 2NDSIG ........................132
Diagnostic Procedure ...........................................133
DTC P0733 A/T 3RD GEAR FUNCTION ................135
Description ............................................................135
On Board Diagnostic Logic ...................................135
Possible Cause .....................................................135
DTC Confirmation Procedure ...............................135
Wiring Diagram — AT — 3RDSIG ........................137
Diagnostic Procedure ...........................................138
DTC P0734 A/T 4TH GEAR FUNCTION ................140
Description ............................................................140
On Board Diagnosis Logic ....................................140
Possible Cause .....................................................141
DTC Confirmation Procedure ...............................141
Wiring Diagram — AT — 4THSIG ........................143
Diagnostic Procedure ...........................................144
DTC P0740 TORQUE CONVERTER CLUTCH
SOLENOID VALVE .................................................148
Description ............................................................148
On Board Diagnosis Logic ....................................148
Possible Cause .....................................................148
DTC Confirmation Procedure ...............................148
Wiring Diagram — AT — TCV ..............................150
Diagnostic Procedure ...........................................151
Component Inspection ..........................................153
DTC P0745 LINE PRESSURE SOLENOID VALVE .154
Description ............................................................154
On Board Diagnosis Logic ....................................154
Possible Cause .....................................................154
DTC Confirmation Procedure ...............................154Wiring Diagram — AT — LPSV ............................156
Diagnostic Procedure ............................................157
Component Inspection ..........................................160
DTC P0750 SHIFT SOLENOID VALVE A ...............161
Description ............................................................161
On Board Diagnosis Logic ....................................161
Possible Cause .....................................................161
DTC Confirmation Procedure ................................161
Wiring Diagram — AT — SSV/A ...........................163
Diagnostic Procedure ............................................164
Component Inspection ..........................................166
DTC P0755 SHIFT SOLENOID VALVE B ...............167
Description ............................................................167
On Board Diagnosis Logic ....................................167
Possible Cause .....................................................167
DTC Confirmation Procedure ................................167
Wiring Diagram — AT — SSV/B ...........................169
Diagnostic Procedure ............................................170
Component Inspection ..........................................172
DTC P1705 ACCELERATOR PEDAL POSITION
(APP) SENSOR .......................................................173
Description ............................................................173
On Board Diagnosis Logic ....................................173
Possible Cause .....................................................173
DTC Confirmation Procedure ................................173
Wiring Diagram — AT — TPS ...............................175
Diagnostic Procedure ............................................176
DTC P1760 OVERRUN CLUTCH SOLENOID
VALVE ......................................................................178
Description ............................................................178
On Board Diagnosis Logic ....................................178
Possible Cause .....................................................178
DTC Confirmation Procedure ................................178
Wiring Diagram — AT — OVRCSV ......................180
Diagnostic Procedure ............................................181
Component Inspection ..........................................183
DTC BATT/FLUID TEMP SEN (A/T FLUID TEMP
SENSOR CIRCUIT AND TCM POWER SOURCE) .184
Description ............................................................184
On Board Diagnosis Logic ....................................184
DTC Confirmation Procedure ................................184
Wiring Diagram — AT — BA/FTS .........................186
Diagnostic Procedure ............................................187
Component Inspection ..........................................191
DTC VEHICLE SPEED SENSOR MTR ...................192
Description ............................................................192
On Board Diagnosis Logic ....................................192
Possible Cause .....................................................192
DTC Confirmation Procedure ................................192
Wiring Diagram — AT — VSSMTR .......................194
Diagnostic Procedure ............................................196
DTC CONTROL UNIT (RAM), CONTROL UNIT
(ROM) ......................................................................198
Description ............................................................198
On Board Diagnosis Logic ....................................198
Possible Cause .....................................................198
DTC Confirmation Procedure ................................198
Diagnostic Procedure ............................................199
AT-4 Wiring Diagram — AT — TPS ..............................347
Diagnostic Procedure ...........................................348
SHIFT SOLENOID VALVE A ..................................350
Description ............................................................350
CONSULT-II Reference Value ..............................350
On Board Diagnosis Logic ....................................350
Possible Cause .....................................................350
DTC Confirmation Procedure ...............................350
Wiring Diagram — AT — SSV/A ...........................352
Diagnostic Procedure ...........................................353
Component Inspection ..........................................355
SHIFT SOLENOID VALVE B ..................................356
Description ............................................................356
CONSULT-II Reference Value ..............................356
On Board Diagnosis Logic ....................................356
DTC Confirmation Procedure ...............................356
Wiring Diagram — AT — SSV/B ...........................358
Diagnostic Procedure ...........................................359
Component Inspection ..........................................361
OVERRUN CLUTCH SOLENOID VALVE ...............362
Description ............................................................362
CONSULT-II Reference Value ..............................362
On Board Diagnosis Logic ....................................362
Possible Cause .....................................................362
DTC Confirmation Procedure ...............................362
Wiring Diagram — AT — OVRCSV ......................364
Diagnostic Procedure ...........................................365
Component Inspection ..........................................367
TORQUE CONVERTER CLUTCH SOLENOID
VALVE .....................................................................368
Description ............................................................368
CONSULT-II Reference Value ..............................368
On Board Diagnosis Logic ....................................368
Possible Cause .....................................................368
DTC Confirmation Procedure ...............................368
Wiring Diagram — AT — TCV ..............................370
Diagnostic Procedure ...........................................371
Component Inspection ..........................................373
BATT/FLUID TEMP SEN (A/T FLUID TEMP SEN-
SOR CIRCUIT AND TCM POWER SOURCE) ........374
Description ............................................................374
CONSULT-II Reference Value ..............................374
On Board Diagnosis Logic ....................................374
Possible Cause .....................................................374
DTC Confirmation Procedure ...............................375
Wiring Diagram — AT — BA/FTS .........................376
Diagnostic Procedure ...........................................377
Component Inspection ..........................................381
ENGINE SPEED SIGNAL .......................................382
Description ............................................................382
CONSULT-II Reference Value ..............................382
On Board Diagnosis Logic ....................................382
DTC Confirmation Procedure ...............................382
Wiring Diagram — AT — ENGSS .........................383
Diagnostic Procedure ...........................................384
LINE PRESSURE SOLENOID VALVE ...................387
Description ............................................................387
CONSULT-II Reference Value ..............................387
On Board Diagnosis Logic ....................................387Possible Cause .....................................................387
DTC Confirmation Procedure ................................387
Wiring Diagram — AT — LPSV ............................389
Diagnostic Procedure ............................................390
Component Inspection ..........................................393
MAIN POWER SUPPLY AND GROUND CIRCUIT .394
Description ............................................................394
On Board Diagnosis Logic ....................................394
Possible Cause .....................................................394
DTC Confirmation Procedure ................................394
Wiring Diagram — AT — MAIN .............................395
Diagnostic Procedure ............................................396
A/T SHIFT LOCK SYSTEM .....................................398
Description ............................................................398
Shift Lock System Electrical Parts Location ..........398
Wiring Diagram — SHIFT .....................................399
Diagnostic Procedure ............................................400
KEY INTERLOCK CABLE ......................................402
Components ..........................................................402
Removal ................................................................402
Installation .............................................................403
ON-VEHICLE SERVICE ..........................................404
Control Valve Assembly and Accumulators ..........404
Park/Neutral Position (PNP) Switch ......................408
Differential Side Oil Seal Replacement .................410
Revolution Sensor Replacement ..........................412
REMOVAL AND INSTALLATION ............................413
Removal ................................................................413
Installation .............................................................415
OVERHAUL .............................................................416
Components ..........................................................416
Oil Channel ...........................................................422
Locations of Adjusting Shims, Needle Bearings,
Thrust Washers and Snap Rings ..........................423
DISASSEMBLY .......................................................424
Disassembly ..........................................................424
REPAIR FOR COMPONENT PARTS ......................440
Manual Shaft .........................................................440
Oil Pump ...............................................................443
Control Valve Assembly ........................................448
Control Valve Upper Body .....................................457
Control Valve Lower Body .....................................461
Reverse Clutch .....................................................464
High Clutch ...........................................................469
Forward and Overrun Clutches .............................475
Low & Reverse Brake ...........................................483
Rear Internal Gear, Forward Clutch Hub and Over-
run Clutch Hub ......................................................487
Output Shaft, Idler Gear, Reduction Pinion Gear and
Bearing Retainer ...................................................491
Band Servo Piston Assembly ................................497
Final Drive .............................................................503
ASSEMBLY .............................................................507
Assembly (1) .........................................................507
Adjustment (1) .......................................................508
Assembly (2) .........................................................513
Adjustment (2) .......................................................520
Assembly (3) .........................................................523
AT-5
D
E
F
G
H
I
J
K
L
MA
B
AT
SERVICE DATA AND SPECIFICATIONS (SDS) .... 530
General Specifications ......................................... 530
Shift Schedule ...................................................... 530
Stall Revolution .................................................... 531
Line Pressure ....................................................... 531
Control Valves ...................................................... 531
Accumulator ......................................................... 532
Clutch and Brakes ................................................ 533
Final Drive ............................................................ 535
Planetary Carrier and Oil Pump ........................... 536
Input Shaft ............................................................ 537
Reduction Pinion Gear ......................................... 537Band Servo ...........................................................538
Output Shaft .........................................................538
Bearing Retainer ...................................................538
Total End Play .......................................................538
Reverse Clutch End Play ......................................539
Removal and Installation ......................................539
Shift Solenoid Valves ............................................539
Solenoid Valves ....................................................539
A/T Fluid Temperature Sensor ..............................540
Revolution Sensor ................................................540
Dropping Resistor .................................................540