Page 66 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual EM-14
[QR]
DRIVE BELTS
INSTALLATION
1. With box wrench, and while securely holding the hexagonal part in center of drive belt auto-tensioner pul-
ley, move the wrench handle in the direction of arro NISSAN X-TRAIL 2003 Service Repair Manual EM-14
[QR]
DRIVE BELTS
INSTALLATION
1. With box wrench, and while securely holding the hexagonal part in center of drive belt auto-tensioner pul-
ley, move the wrench handle in the direction of arro](/manual-img/5/57404/w960_57404-65.png)
EM-14
[QR]
DRIVE BELTS
INSTALLATION
1. With box wrench, and while securely holding the hexagonal part in center of drive belt auto-tensioner pul-
ley, move the wrench handle in the direction of arrow (loosening direction of tensioner).
CAUTION:
Avoid placing hand in a location where pinching may occur if the holding tool accidentally comes
off.
2. Insert a rod approximately 6 mm (0.24 in) in diameter such as short-length screwdriver into the hole of
retaining boss to fix drive belt auto-tensioner pulley.
3. Hook drive belt onto all pulleys except for water pump, and then onto water pump pulley finally.
CAUTION:
Confirm belt is completely set to pulleys.
4. Release drive belt auto-tensioner, and apply tension to drive belt.
5. Turn crankshaft pulley clockwise several times to equalize tension between each pulley.
6. Confirm tension of drive belt at indicator is within the range of possible use. Refer to EM-13, "
Checking
Drive Belts" .
Removal and Installation of Drive Belt Auto-TensionerEBS00KNA
REMOVAL
1. Remove splash guard on RH undercover.
2. Remove drive belt. Refer to EM-13, "
Removal and Installation" .
3. Remove drive belt auto-tensioner.
INSTALLATION
Install in the reverse order of removal.
CAUTION:
When installing drive belt auto-tensioner, be careful not to damage water pump pulley.
1. Drive belt auto-tensioner 2. Water pump pulley
PBIC2170E
Page 98 of 4179
EM-46
[QR]
TIMING CHAIN
a. Rotate crankshaft pulley clockwise and align TDC mark to timing
indicator on front cover.
b. At the same time, make sure that the mating marks on camshaft
sprockets are located as shown in the figure.
If not, rotate crankshaft pulley one more turn to align mating
marks to the positions in the figure.
15. Remove crankshaft pulley with the following procedure:
a. Fix crankshaft pulley with a pulley holder (commercial service
tool), loosen crankshaft pulley bolt, and locate bolt seating sur-
face at 10 mm (0.39 in) from its original position.
b. Attach a pulley puller (special service tool) in the M 6 thread hole
on crankshaft pulley, and remove crankshaft pulley.
16. Remove front cover with the following procedure:
KBIA0190E
PBIC2351E
PBIC2434E
PBIC2413E
Page 101 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual TIMING CHAIN
EM-49
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
INSTALLATION
NOTE:
The figure shows the relationship between the mating mark on each
timing chain and that on the corresponding sprocket, with the c NISSAN X-TRAIL 2003 Service Repair Manual TIMING CHAIN
EM-49
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
INSTALLATION
NOTE:
The figure shows the relationship between the mating mark on each
timing chain and that on the corresponding sprocket, with the c](/manual-img/5/57404/w960_57404-100.png)
TIMING CHAIN
EM-49
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
INSTALLATION
NOTE:
The figure shows the relationship between the mating mark on each
timing chain and that on the corresponding sprocket, with the com-
ponents installed.
1. Make sure that crankshaft key points straight up.
2. Tighten mounting bolts in numerical order as shown in figure
with the following procedure, and install balancer unit.
CAUTION:
If mounting bolts are re-used, check their outer diameter
before installation. Refer to EM-48, "
INSPECTION AFTER
REMOVAL" .
a. Apply new engine oil to threads and seat surfaces of mounting
bolts.
b. Tighten all bolts.
c. Turn all bolts 90 degrees clockwise (angle tightening).
d. Completely loosen.
CAUTION:
In this step, loosen bolts in reverse order as shown in the
figure.
e. Tighten all bolts.
f. Turn them another 90 degrees clockwise (angle tightening).
CAUTION:
Check tightening angle with an angle wrench (special service tool) or a protractor. Do not make
judgment by visual check alone.
PBIC2182E
: 48.1 N·m (4.9 kg-m, 35 ft-lb)KBIA0122E
: 0 N·m (0 kg-m, 0 ft-lb)
: 48.1 N·m (4.9 kg-m, 35 ft-lb)
KBIA0080E
Page 104 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual EM-52
[QR]
TIMING CHAIN
d. Apply a continuous bead of liquid gasket with a tube presser
(special service tool: WS39930000) to intake valve timing con-
trol cover as shown in the figure.
Use Genuine NISSAN X-TRAIL 2003 Service Repair Manual EM-52
[QR]
TIMING CHAIN
d. Apply a continuous bead of liquid gasket with a tube presser
(special service tool: WS39930000) to intake valve timing con-
trol cover as shown in the figure.
Use Genuine](/manual-img/5/57404/w960_57404-103.png)
EM-52
[QR]
TIMING CHAIN
d. Apply a continuous bead of liquid gasket with a tube presser
(special service tool: WS39930000) to intake valve timing con-
trol cover as shown in the figure.
Use Genuine Liquid Gasket or equivalent.
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Insert crankshaft pulley by aligning with crankshaft key.
When inserting crankshaft pulley with a plastic hammer, tap on its center portion (not circumference).
CAUTION:
Install protecting front oil seal lip section from any damage.
11. Tighten crankshaft pulley bolt.
Secure crankshaft pulley with a pulley holder (commercial service tool), and tighten crankshaft pulley
bolt.
Perform angle tightening with the following procedure:
a. Apply new engine oil to thread and seat surfaces of crankshaft pulley bolt.
b. Tighten crankshaft pulley bolt.
c. Put a paint mark on crankshaft pulley, mating with any one of six
easy to recognize angle marks on bolt flange.
d. Turn another 60 degrees clockwise (angle tightening).
Check the tightening angle with movement of one angle mark.
12. Install all removed parts in the reverse order of removal.
SBIA0260E
KBIA0085E
: 42.1 N·m (4.3 kg-m, 31 ft-lb)
SEM751G
Page 106 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual EM-54
[QR]
CAMSHAFT
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover with the following procedure NISSAN X-TRAIL 2003 Service Repair Manual EM-54
[QR]
CAMSHAFT
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover with the following procedure](/manual-img/5/57404/w960_57404-105.png)
EM-54
[QR]
CAMSHAFT
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover with the following procedure:
a. Disconnect intake valve timing control solenoid valve harness connector.
b. Remove intake valve timing control solenoid valve, if necessary.
c. Disconnect ground cables.
d. Loosen bolts in reverse order as shown in the figure.
e . U s e a s e a l c u t t e r ( s p e c i a l s e r v i c e t o o l : K V 1 0 1111 0 0 ) o r e q u i v a -
lent tool to cut liquid gasket for removal.
5. Pull chain guide between camshaft sprockets out through front cover.
6. Set No. 1 cylinder at TDC on its compression stroke with the following procedure:
a. Open splash guard on RH undercover.
b. Rotate crankshaft pulley clockwise and align TDC mark to timing
indicator on front cover.
c. At the same time, make sure that the mating marks on camshaft
sprockets are located as shown in the figure.
If not, rotate crankshaft pulley one more turn to align mating
marks to the positions in the figure.
7. Remove camshaft sprockets with the following procedure:
a. Line up the mating marks on camshaft sprockets, and paint indelible mating marks on timing chain link
plate.
KBIA0085E
KBIA0190E
PBIC2351E
Page 113 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual CAMSHAFT
EM-61
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-61, "
Valve Clearance" .
11. NISSAN X-TRAIL 2003 Service Repair Manual CAMSHAFT
EM-61
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-61, "
Valve Clearance" .
11.](/manual-img/5/57404/w960_57404-112.png)
CAMSHAFT
EM-61
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-61, "
Valve Clearance" .
11. Install in the reverse order of removal after this step.
Va l v e C l e a r a n c eEBS00LS3
INSPECTION
Perform inspection as follows after removal, installation or replacement of camshaft or valve-related parts, or if
there is unusual engine conditions regarding valve clearance.
1. Warm up engine. Then stop it.
2. Open splash guard on RH undercover.
3. Remove rocker cover. Refer to EM-42, "
ROCKER COVER" .
4. Rotate crankshaft pulley clockwise and align TDC mark to timing
indicator on front cover.
5. At the same time, make sure that both intake and exhaust cam
noses of No. 1 cylinder face outside as shown in the figure.
If they do not face outside, rotate crankshaft pulley once more
and align as shown in the figure.
6. By referring to the figure, measure the valve clearances at loca-
tions marked “X” as shown in the table below (locations indi-
cated with black arrow in figure) with a feeler gauge.
No. 1 cylinder compression TDC.
KBIA0085E
KBIA0190E
KBIA0400J
Measuring position No. 1 CYL. No. 2 CYL. No. 3 CYL. No. 4 CYL.
No. 1 cylinder at
TDCINT X X
EXH X X
SBIA0261E
Page 122 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual EM-70
[QR]
CYLINDER HEAD
2. Tighten cylinder head bolts in numerical order as shown in figure
with the following procedure, and install cylinder head.
CAUTION:
If cylinder head bolts are re-used, ch NISSAN X-TRAIL 2003 Service Repair Manual EM-70
[QR]
CYLINDER HEAD
2. Tighten cylinder head bolts in numerical order as shown in figure
with the following procedure, and install cylinder head.
CAUTION:
If cylinder head bolts are re-used, ch](/manual-img/5/57404/w960_57404-121.png)
EM-70
[QR]
CYLINDER HEAD
2. Tighten cylinder head bolts in numerical order as shown in figure
with the following procedure, and install cylinder head.
CAUTION:
If cylinder head bolts are re-used, check their outer diame-
ters before installation. Refer to EM-69, "
Cylinder Head
Bolts Outer Diameter" .
a. Apply new engine oil to threads and seating surface of mounting
bolts.
b. Tighten all bolts.
c. Turn all bolts 60 degrees clockwise (angle tightening).
d. Completely loosen.
CAUTION:
In this step, loosen bolts in reverse order of that indicated in the figure.
e. Tighten all bolts.
f. Turn all bolts 75 degrees clockwise (angle tightening).
g. Turn all bolts 75 degrees clockwise again (angle tightening).
CAUTION:
Check and confirm the tightening angle by using an angle
wrench (special service tool) or protractor. Avoid judgment
by visual inspection without the tool.
3. Install in the reverse order of removal after this step. : 5.0 N·m (0.51 kg-m, 4 ft-lb)
: 0 N·m (0 kg-m, 0 ft-lb)
: 39.2 N·m (4.0 kg-m, 29 ft-lb)
KBIA0058E
KBIA0059E
Page 141 of 4179
![NISSAN X-TRAIL 2003 Service Repair Manual CYLINDER BLOCK
EM-89
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
i. Tighten M10 bolts in numerical order from No. 1 to 10.
ii. Turn M10 bolts 60 degrees clockwise (angle tightening) in order
from No. 1 to 10 in NISSAN X-TRAIL 2003 Service Repair Manual CYLINDER BLOCK
EM-89
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
i. Tighten M10 bolts in numerical order from No. 1 to 10.
ii. Turn M10 bolts 60 degrees clockwise (angle tightening) in order
from No. 1 to 10 in](/manual-img/5/57404/w960_57404-140.png)
CYLINDER BLOCK
EM-89
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
i. Tighten M10 bolts in numerical order from No. 1 to 10.
ii. Turn M10 bolts 60 degrees clockwise (angle tightening) in order
from No. 1 to 10 in the figure.
CAUTION:
Check and confirm the tightening angle by using an angle
wrench (special service tool) or protractor. Avoid judgment
by visual inspection without the tool.
After installing mounting bolts, make sure that crankshaft can be rotated smoothly by hand.
Wipe off completely any protruding liquid gasket on front side of engine.
Check crankshaft end play. Refer to EM-99, "CRANKSHAFT END PLAY" .
7. Install piston to connecting rod with the following procedure:
a. Using snap ring pliers, install new snap ring to the groove of the piston rear side.
Insert it fully into groove to install.
b. Assemble piston to connecting rod.
Using an industrial drier or similar tool, heat the piston until the piston pin can be pushed in by hand
without excess force [approx. 60 to 70 °C (140 to 158 °F)]. From the front to the rear, insert piston pin
into piston and connecting rod.
Assemble so that the front mark on the piston head and the oil
holes and the cylinder number on connecting rod are posi-
tioned as shown in the figure.
c. Install new snap ring to the groove of the piston front side.
Insert it fully into groove to install.
After installing, make sure that connecting rod moves
smoothly.
8. Using a piston ring expander (commercial service tool), install piston rings.
CAUTION:
Be careful not to damage piston. : 39.2 N·m (4.0 kg-m, 29 ft-lb)
KBIA0063E
KBIA0065E
PBIC2194E